Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBaron Oil Regulatory News (BOIL)

Share Price Information for Baron Oil (BOIL)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.065
Bid: 0.06
Ask: 0.07
Change: 0.0025 (4.00%)
Spread: 0.01 (16.667%)
Open: 0.0625
High: 0.067
Low: 0.0625
Prev. Close: 0.0625
BOIL Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update on Chuditch PSC

16 Apr 2024 07:00

RNS Number : 7116K
Baron Oil PLC
16 April 2024
 

16 April 2024

Baron Oil Plc

("Baron", or the "Company")

Operational Update on Chuditch PSC

Baron Oil Plc (AIM: BOIL) is pleased to provide an update on operational activities and plans on the TL-SO-19-16 Production Sharing Contract ("Chuditch" or the "PSC"), offshore Democratic Republic of Timor-Leste.

Chuditch-2 Site Survey

As announced by the Company on 12 February 2024 and updated on 27 March 2024, Baron's wholly owned subsidiary, SundaGas Banda Unipessoal Lda ("SundaGas"), has been conducting a survey at the planned drilling location for the Chuditch-2 appraisal well (the "Site Survey").

The objective of a Site Survey is principally to identify hazards at a proposed well site, ensuring that a drilling rig can be located safely and with minimal environmental impact. The Site Survey work has consisted of geophysical studies (remote seabed investigation) and geotechnical work (physical studies of the seabed), using two separate vessels.

All operational work related to the Site Survey has now been successfully completed and the vessel has left the PSC area. Some delays occurred during both the geophysical and geotechnical phases of the Site Survey, principally caused by weather conditions and a few other operational issues, but the work has now been completed, and at a cost significantly below the approved budget.

Detailed investigation of the location initially chosen for the Chuditch-2 well revealed an irregular seabed that would be unsuitable for placement of a jack-up drilling rig. As a result, a new more appropriate location has been chosen, which lies 286m to the east-northeast of the initial location. This new proposed location was satisfactorily verified through geotechnical studies in the second phase of the Site Survey and is now considered final.

The well will now be situated 5.1km from the site of the original Chuditch-1 discovery well in a water depth of 68m. Based on 3D seismic mapping and the results of Chuditch-1, the planned vertical appraisal well drilled at this new location is expected to encounter gas-charged reservoirs 16m shallower than at the initial location and, as a result, SundaGas now predicts a taller 149m gas column in the reservoir target versus 133m predicted at the initial location.

Drilling Planning Preparations

In parallel to the recent Site Survey operations, drilling planning has continued at a good pace. SundaGas' experienced in-house drill team has further refined the well design, enabling the process of tendering for essential materials that have long procurement times such as well casing to have commenced. Design work on a Chuditch-2 well test (DST) is ongoing, led by SundaGas' well test engineer. 

SundaGas is in discussions with drilling rig contractors and other third-party service providers in support of well construction plans. The Company is also liaising closely with other operators in the region that are expected to drill wells in locations relatively nearby.

Detailed workshops are being held on a regular basis with joint venture partner TIMOR GAP and government regulator ANP, whose input to operational and logistical planning is continuing to prove invaluable.

SundaGas and its joint venture partner TIMOR GAP are working on resources to ensure successful delivery of the upcoming Chuditch-2 appraisal drilling campaign. Discussions with a number of potential funding partners are ongoing and further announcements will be made at the appropriate time.

 

Dr Andy Butler, Chief Executive Officer, commented:

"The successful completion of the Site Survey, leading to the selection of an improved drilling target location with optimal seabed conditions, is another key milestone towards drilling the Chuditch-2 appraisal well. We look forward to providing further announcements on the Chuditch project, including with respect to well planning, execution and drill funding, at the appropriate times."

For further information, please contact:

Baron Oil Plc +44 (0) 20 7117 2849

Dr Andy Butler, Chief Executive Officer

 

Allenby Capital Limited +44 (0) 20 3328 5656

Nominated Adviser and Joint Broker

Nick Athanas, Nick Harriss, George Payne (Corporate Finance)

Kelly Gardiner, Stefano Aquilino (Sales and Corporate Broking)

Cavendish Capital Markets Limited +44 (0) 131 220 6939 / +44 (0) 207 397 8900

Joint Broker

Neil McDonald, Pearl Kellie (Corporate Finance)

Leif Powis (Sales)

IFC Advisory Limited +44 (0) 20 3934 6630

Financial PR and IR baronoil@investor-focus.co.uk

Tim Metcalfe, Florence Chandler

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFZGMDMKNGDZZ
Date   Source Headline
7th Dec 200610:46 amRNSTesting Update
7th Dec 200610:42 amRNSPerupetro Approval
7th Dec 20067:01 amRNSZ-34 Perupetro approval recd
20th Nov 20064:42 pmRNSExercise of Warrants
15th Nov 20066:28 pmRNSShareholding
14th Nov 20069:31 amRNSShareholding
10th Nov 20062:05 pmRNSShareholding
7th Nov 20061:11 pmRNSShareholding
3rd Nov 200611:01 amRNSUpdates on Peru and Colombia
2nd Nov 20065:06 pmRNSShareholding
2nd Nov 200610:54 amRNSInterest in Shares
30th Oct 20066:12 pmRNSShareholding
30th Oct 20069:49 amRNSShareholding
24th Oct 20069:32 amRNSShareholding
9th Oct 200611:24 amRNSWarrants Issue and Dealings
5th Oct 200612:36 pmRNSUpdate, Directors' Dealings
2nd Oct 20069:48 amRNSDrilling Report
26th Sep 20068:00 amRNSFinal Results
7th Sep 20061:59 pmRNSShareholding
6th Sep 20065:09 pmRNSShareholding
5th Sep 20064:09 pmRNSIssue of Shares - Correction
4th Sep 200610:39 amRNSUpdate on San Alberto 1X
30th Aug 20065:13 pmRNSIssue of Shares
25th Aug 20063:35 pmRNSEquity Issue, Share Price
15th Aug 20064:27 pmRNSShareholding
14th Aug 20066:18 pmRNSSignificant Shareholding
11th Aug 20064:19 pmRNSSignificant Shareholding
7th Aug 200610:28 amRNSProduction Test Update
12th Jul 20064:21 pmRNSUpdate on Blocks
10th Jul 20063:06 pmRNSUpdate on block Z-34 Peru
19th Jun 200612:18 pmRNSShareholding
19th Jun 200610:18 amRNSShareholding
15th Jun 20063:22 pmRNSShareholding
2nd Jun 20069:20 amRNSPlacing
25th May 20064:40 pmRNSShareholding
24th May 200612:06 pmRNSStmt re potential placing
23rd May 20064:56 pmRNSDrilling rig contract signed
23rd May 20063:18 pmRNSDirector's Dealings
8th May 20067:02 amRNSOffshore Peru joint venture
8th May 20067:01 amRNSJoint Venture Agreement
5th May 20061:20 pmRNSFormal Licence Signing
2nd May 20066:13 pmRNSShareholding
21st Apr 20061:02 pmRNSMinistry Approval
13th Apr 200610:32 amRNSStrategic Partner in Brazil
9th Mar 200611:49 amRNSAcquisition of Interest
7th Feb 20061:00 pmRNSContract award and warrants
31st Jan 20061:15 pmRNSShareholding - Amendment
30th Jan 200612:08 pmRNSNPEL Completion
27th Jan 200610:09 amRNSInterim Results
27th Jan 20069:36 amRNSShareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.