Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBushveld Minerals Regulatory News (BMN)

Share Price Information for Bushveld Minerals (BMN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.60
Bid: 0.55
Ask: 0.65
Change: 0.05 (9.09%)
Spread: 0.10 (18.182%)
Open: 0.55
High: 0.625
Low: 0.55
Prev. Close: 0.55
BMN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Positive Preliminary Metallurgical Testwork

22 Oct 2012 07:00

RNS Number : 1613P
Bushveld Minerals Limited
22 October 2012
 



22 October 2012

For Immediate Release

 

Bushveld Minerals Ltd

("Bushveld" or the "Company", AIM: BMN)

Operational Update

 Preliminary metallurgical testwork at the Bushveld Iron Ore Project

Bushveld Minerals Limited, a mineral development company focused on iron and tin projects in southern Africa, is pleased to provide an update on progress in its metallurgical testwork on the Bushveld Iron Ore Project.

Highlights:

Positive preliminary magnetite recoveries and high grade concentrates achievable on both fine and coarse materials from the Massive Magnetite Ore ("Massive Ore"):

·; Fine fractions:The preliminary Davis Tube Test ("DTT") metallurgical testwork undertaken on ˂75μm fraction shows 79% - 84% recovery for FeO, VOand TiO, and a magnetic separator concentrate grade in excess of 78% FeO3, 19% TiO and 0.36% VO.

·; Coarse fractions: Preliminary Dense Medium Separation ("DMS") tests on coarse (-12mm and -6mm) fractions shows 73% - 80% recovery for FeO, VOand TiO, and a concentrate grade in excess of 70% FeO3, 18.5% TiO and 0.32% VO₅.

 

Fortune Mojapelo, CEO, Bushveld Minerals explained that: "The results of the first metallurgical testwork are in line with our expectations and mark an important milestone for Bushveld while reaffirming our confidence in the project. The positive preliminary recoveries and concentrate grades for Fe2O3, TiO2 and V2O5 that are achievable at coarse sizes of as much as 12mm are very encouraging and should eliminate or minimise the need to mill the product down to fines, thus significantly reducing energy and water requirements. The relative ease of transporting coarse material (compared to finely ground concentrate) will further enhance the project's economics."

 

Metallurgy

The scope of the testwork has been defined to investigate extractability and pyrometallurgical characteristics of the Company's Iron Ore Project. The Metallurgical and mineralogical characterization and densimetric testwork was conducted by SGS (www.sgs.com) with advisory input from PESCO, ore dressing specialists.

The metallurgical testing comprises two parallel programmes that are focused on the Massive Ore and the Disseminated Magnetite Ore ("Disseminated Ore") that was identified in the Bushveld Minerals geological model in the P-Q Magnetite Zone.

Both ore types are being subjected to extractability and limited pyrometallurgical testwork incorporating pre-reduction tests. The pre-reduction tests will test the potential for a value-added, pre-reduced iron ore product product rather than a plain concentrate.

The focus of Bushveld's metallurgical testwork since June 2012 has been on the Massive Ore. Testwork on the Disseminated Ore has recently also commenced and results from this will be announced in due course.

 

TESTWORK ON THE MASSIVE ORE

Extractability/concentration and limited pyrometallurgy (pre-reduction) testwork currently underway on the Massive Ore is as follows:

 

1. Extractability / Concentration Tests:

Various fraction sizes have been investigated, applying DTT to the 75μm fine fractions while DMS techniques were applied to analyse the 6mm to 12mm size fractions.

The objective is to determine the mineralogy of the ore, the potential to concentrate the ore by both magnetic separation and DMS, and to identify the optimal grind size for concentration and the grade of the resulting concentrate.

While observed recoveries on the grind fractions described above are very positive, additional testwork at other fraction sizes, ranging from 38μm to 3mm, is also underway, results of which will be announced before 31 December 2012. The intention is to determine the grind fraction at which optimal recoveries can be expected.

 

1.1. Initial Davis Tube Tests (˂75μm):

The DTT recoveries and concentrate grade for a 80% < 75 micron grind feed processed at 1 320 Gauss for the massive magnetite are as follows:

Mass Recovery to Mags (%)

Grade (%)

Recovery (%)

Grade in concentrate (%)

Fe

TiO₂

V₂O₅

Fe

TiO₂

V₂O₅

Al₂O₃

SiO₂

MgO

CaO

63.4

55.0

19.2

0.36

83.6

79.5

78.7

1.96

1.16

0.94

0.1

 

1.2. Coarse Grind DMS Tests (-6mm & 12mm):

The following tables show recoveries and concentrate grades at a 6mm and 12mm top size for the magnetite recovered at the Massive Zone at a specific gravity (SG) of 3.6:

Top size

Mass Recovery to Sinks (%)

Grade (%)

Recovery (%)

Grade in concentrate (%)

Fe

TiO₂

V₂O₅

Fe

TiO₂

V₂O₅

Al₂O₃

SiO₂

MgO

CaO

6mm

61.9

50.1

19.0

0.33

73.4

74.9

78.5

2.88

4.66

1.65

0.75

12mm

67.3

48.9

18.5

0.32

79.2

79.8

89.7

3.29

5.87

1.73

0.96

 

Liberation studies of -6mm and -12mm sample sizes confirmed a close association of magnetite and ilmenite. These were upgraded together, suggesting that the 12mm fraction may be sufficient to obtain economic recoveries with equally attractive product grades. The differences in recoveries between the two size fractions were minimal, indicating that concentration is possible for fairly coarse top sizes.

These positive results indicate that good recoveries can be achieved at fairly coarse top sizes creating scope for a concentrate product, which requires significantly less power than a fine top size concentrate. This is expected to contribute positively to the economics of the project.

 

2. Pyro Metallurgical Tests: Pre-reduction

Pre-reduction testwork will be undertaken on both the fine and the coarse grind concentrate (from 6mm to 12mm). The process comprises of heating the ore together with a solid reductant to temperatures that are typically around 1000°C (below the melting point of the ore). Under these conditions, the Fe3O4 in the ore is reduced to metallic iron, resulting in significantly less electrical energy being required in the subsequent melting processes than if reduction had to be affected as well.

The objective of the pre-reduction testwork is to evaluate the scope to further upgrade this material to a higher value product that could compete in the scrap metal market. Initial test work will be undertaken on the Massive component of the P-Q Magnetite Layer during this quarter with results expected before end of 31 March 2013.

Furthermore, bench-scale smelting tests will be undertaken on the fine (˂75μm) concentrates. Tests with both fluxed and non-fluxed ore will be carried out in order to determine characteristics of vanadium and titanium partitioning between metal and slag.

Metallurgical testwork on the Disseminated Ore is underway and comprises, as with the Massive Ore, extractability/concentrating and pre-reduction testwork. The results of this testwork are expected before the end of 31 March 2013.

 

Enquiries: info@bushveldminerals.com

Bushveld Minerals

Fortune Mojapelo

+27 (0) 11 268 6555

Fox Davies

Jonathan Evans

+44 (0) 20 3463 5000

Tavistock Communications

Jos Simson/ Jessica Fontaine

+44 (0) 20 7920 3150

Tielle Communications

Stéphanie Leclercq

+27 (0) 83 307 7587

This information is provided by RNS

The company news service from the London Stock Exchange

- ENDS -

 

 

Notes to the editor

Bushveld Minerals Limited is a mineral development company focused on the Bushveld Iron Ore Project and the Mokopane Tin Project, both located on the northern limb of the Bushveld Complex, South Africa.

 

The Bushveld Iron Ore Project comprises two licenses covering 7,409 ha where a JORC compliant open-castable resource of 633 million tonnes (comprising 260 million tonnes Indicated and a further 373 million tonnes Inferred) has been established from a 4.5 km strike length. Further drilling along strike is expected to significantly add to the resource on the basis of identified strike extensions several kilometres long to the north and south of the project area with a target resource planned in excess of 1 billion tonnes. A scoping study on the project is underway for completion in Q1 2013.

 

The Mokopane Tin Project consists of one licence covering 13,422 ha of open-castable disseminated tin resource. The Company has explored one target and plans to drill at a further four targets. The Company has a JORC resource in excess of 5,000 tonnes of tin and is looking to expand the resource base by undertaking a drilling programme on the other three targets in the licence area and one target in a licence area currently under application. In the longer term, the Company intends to expand the resource base by acquiring further projects.

 

The Company was admitted to the Alternative Investment Market of the LSE in March 2012.

 

The scientific and technical information contained within this announcement has been reviewed and approved by Jan Rabe, Senior Process Engineer at PESCO, the metallurgical advisor to the Company. Rabe has an honours degree in metallurgy and over 11 years' experience as a practising metallurgical engineer.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLFFIFIELLFIF
Date   Source Headline
30th Apr 20159:31 amRNSLemur Resources - Appendix 3E on ASX
29th Apr 20154:32 pmRNSLemur Resources - Appendix 3E on ASX
28th Apr 20159:13 amRNSLemur Resources - Appendix 3E on ASX
27th Apr 20159:54 amRNSLemur Resources - Appendix 3E on ASX
24th Apr 201511:21 amRNSLemur Resources - Appendix 3E on ASX
21st Apr 201510:06 amRNSLemur Resources - Appendix 3E on ASX
20th Apr 20158:38 amRNSLemur Resources - Appendix 3E on ASX
17th Apr 201511:07 amRNSLemur Resources - Appendix 3E on ASX
16th Apr 20159:30 amRNSLemur Resources - Appendix 3E on ASX
15th Apr 20154:49 pmRNSLemur Resources - Appendix 3E on ASX
14th Apr 20151:24 pmRNSLemur Resources - ASIC Form 484
14th Apr 20151:15 pmRNSLemur Resources - Appendix 3E on ASX
10th Apr 20159:26 amRNSLemur Resources - Appendix 3E on ASX
9th Apr 20159:24 amRNSLemur Resources - Appendix 3E on ASX
7th Apr 20157:47 amRNSLemur Resources - Appendix 3E on ASX
1st Apr 20152:10 pmRNSLemur Resources - Quarterly Report on ASX
1st Apr 20158:39 amRNSLemur Resources - Appendix 3E on ASX
31st Mar 20159:13 amRNSLemur Resources - Appendix 3E on ASX
30th Mar 20154:55 pmRNSLemur Resources - Appendix 3E on ASX
27th Mar 20158:30 amRNSLemur Resources - Appendix 3E on ASX
19th Mar 20158:30 amRNSLemur Resources - Appendix 3E on ASX
17th Mar 20157:44 amRNSLemur Resources - Zaaiplaats Tin Acquisition
16th Mar 201511:21 amRNSVanadium - Mining Right Application Submitted
27th Feb 201511:26 amRNSLemur Resources - ASIC Form 484
27th Feb 20157:00 amRNSShare Issuances
26th Feb 201511:56 amRNSOperational Update - Bushveld Vanadium Project
25th Feb 201510:51 amRNSLemur Resources - Appendix 3E on ASX
23rd Feb 20151:30 pmRNSLemur Resources - Appendix 3E on ASX
20th Feb 20158:34 amRNSLemur Resources - Appendix 3E on ASX
17th Feb 201510:25 amRNSLemur Resources - Appendix 3E on ASX
12th Feb 201512:08 pmRNSLemur Resources - Appendix 3E on ASX
11th Feb 20151:37 pmRNSLemur Resources - Update On Permit 4578
6th Feb 201511:56 amRNSLemur Resources - Appendix 3E on ASX
5th Feb 201510:38 amRNSLemur Resources - Appendix 3E on ASX
2nd Feb 201512:50 pmRNSLemur Resources - ASIC Form 484
30th Jan 201511:57 amRNSDirector's share purchase
30th Jan 20158:25 amRNSLemur Resources - Quarterly Report
14th Jan 20153:01 pmRNSLemur Resources - Appendix 3E on ASX
13th Jan 20158:00 amRNSLemur Resources - Appendix 3E on ASX
8th Jan 20158:23 amRNSLemur Resources - Appendix 3E on ASX
19th Dec 201412:03 pmRNSLemur Resources - Listing Rule 3.8A
15th Dec 201410:13 amRNSLemur Resources - Appendix 3E on ASX
11th Dec 20147:03 amRNSLemur Resources - Appendix 3E on ASX
2nd Dec 20147:05 amRNSDirector's Share Purchase
25th Nov 201411:12 amRNSInvestor Evening
24th Nov 20147:01 amRNSLemur Resources launches on market share buyback
20th Nov 201410:37 amRNSBushveld Vanadium Project - PFS launch
19th Nov 20149:11 amRNSLemur Resources' change of financial year end
19th Nov 20148:06 amRNSLemur Resources' Receipt of Tulear Court Judgement
18th Nov 20147:00 amRNSUnaudited Half Yearly Results to August 31 2014

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.