Operational Update - Bushveld Vanadium Project

Bushveld Minerals Limited (AIM: BMN), a diversified mineral development company with projects in Africa, is pleased to provide an operations update on the Pre-Feasibility study underway at its Bushveld Vanadium Project in Limpopo Province, South Africa.

Highlights:

1) Since the commencement of the drilling programme in November 2014, 31 boreholes totalling 1831.61m had been completed on the AB Zone and the Main Magnetite Layer ("MML"), as of 31 January 2015:

a) AB Zone:

· 9 boreholes (535.79 m) completed and assays received on the AB Zone, confirming strike continuity along a ~1.7 km strike

· Thickness of the AB Zone varies from 5.88 metres to 14.70 metres

b) MML:

· 22 boreholes (1295.82 m) completed on the MML;

· 14 in-fill boreholes completed for upgrading the Mineral Resource into the Measured category

· 8 boreholes completed to obtain sufficient core for the metallurgical testing required during the Pre-Feasibility and Feasibility studies

· Samples submitted for 20 boreholes, with some assays having been received for 13 boreholes;

2) Appointment of Bushveld owner team and external consultants to lead Pre-Feasibility Study Programme;

3) Progress with Environmental Impact Assessment and Social and Labour Plan as part of the Mining Right Application;

4) Pre-Feasibility Study on track for completion during 1H 2015;

5) Mining Right Application on track for submission in Q1 2015.

 

Fortune Mojapelo, CEO of Bushveld Minerals, said: "We have made significant progress towards the completion of the Pre-Feasibility study on the project, most notably the completion of the in-fill and metallurgical drilling on the MML and the preparation of our mining right application which is expected to be submitted shortly. The metallurgical drilling has provided sufficient core for the metallurgical testing that our Pre-Feasibility and Feasibility studies require. We are also delighted to have established a focused Bushveld Vanadium Project Pre-Feasibility study owner team, supported by expert external consultants. The team comprises individuals with extensive expertise in vanadium mining, processing and marketing. Additionally, we are pleased to confirm we are on track to declaring a maiden Mineral Resource on the AB Zone."

 

THE BUSHVELD VANADUM PROJECT

Drilling

On the 06 November 2014, the Company commenced a drilling programme as part of the Pre-Feasibility Study on the Bushveld Vanadium Project. The purpose of this programme is to upgrade the MML Mineral Resource to the Measured category, to collect sufficient material for the on-going and future metallurgical test work programmes, and to assess the extent of the AB Zone for purposes of calculating its maiden Mineral Resource. The programme is designed to comprise 68 boreholes and to total 3,700 metres.

As of 31 January 2015, 31 boreholes (totalling 1831.61 m) had been completed, of which 9 boreholes (535.79 m) targeted the AB Zone, and 22 boreholes (1295.82 m) targeted the MML.

The table below summarises the intersections returned thus far:

Borehole

Orebody

Purpose

From

To

Thickness*

MML

VL36

MML

Resource

25.56

34.34

8.25**

VL53

MML

Resource

43.42

51.13

7.25**

VL55

MML

Resource

122.26

129.18

6.50**

VK25

MML

Resource

47.77

52.31

4.27**

VK29

MML

Resource

23.53

31.44

7.44**

VL58

MML

Resource

115.55

126.62

10.41

VK48

MML

Resource

34.40

43.18

8.25

VK30

MML

Resource

27.86

35.03

6.74

VK31

MML

Resource

17.74

27.40

9.08

VL56

MML

Resource

14.00

24.67

10.03

VL54

MML

Resource

21.32

31.23

9.32

VL52

MML

Resource

24.50

33.00

7.99

VK32

MML

Resource

12.66

23.41

10.11

VK33

MML

Resource

34.84

46.55

11.01

VL39

MML

Metallurgical

84.45

93.30

8.32

VL41

MML

Metallurgical

84.62

92.75

7.64

VL44

MML

Metallurgical

111.91

121.87

9.36

VL45

MML

Metallurgical

44.60

54.30

9.19

VL67

MML

Metallurgical

23.39

31.84

7.94

VL46

MML

Metallurgical

51.96

59.90

7.46

VK45

MML

Metallurgical

28.61

37.54

8.82

VL66

MML

Metallurgical

4.50

14.37

9.28

AB Zone

VL14

AB Zone

Resource

57.23

67.71

9.85**

VL15

AB Zone

Resource

41.96

49.35

6.95**

VL16

AB Zone

Resource

20.24

26.92

6.28**

VL31

AB Zone

Resource

50.06

62.00

11.22**

VL37

AB Zone

Resource

3.55

19.19

14.70**

VL38

AB Zone

Resource

19.09

29.43

9.72**

VL17

AB Zone

Resource

36.60

42.85

5.88

VL22

AB Zone

Resource

47.50

58.88

10.70

VL18

AB Zone

Resource

28.08

41.39

12.51

\* True thickness calculated assuming a dip of 20°

** Figures are final figures after logging, sampling and assaying - all other intersections are provisional and may change following assaying

Assaying of drill core is ongoing, and will be reported on in due course.

Project Owner Team and External Consultants Appointed for the Pre-Feasibility Study

Simultaneously, Bushveld has established an expert Project Owner Team for the Bushveld Vanadium Project, comprising the following individuals:

Exploration Manager/Geology

Dr Luke Longridge

Mining Studies

Mr Wally Waldeck

Financial Modelling/Business Case Optimisation& Project Management

Hindsight Corporate Solutions - Mr Ken Greve / Mr Tertius de Villiers

Beneficiation (Concentrator plant)

Mr. Jan Rabe

Processing Infrastructure (Pyrometallurgy)

Mr John Mangwiro

EIA, WUL, IFC, Social & Labour Plan, Regulatory compliance

Dr Fred Mphephu

The following companies and Individuals comprise Bushveld's appointed external consultants:

Processing Infrastructure (Pyrometallurgy)

Hatch Goba

Mining Planning

MSA

Environmental Impact Assessment (EIA) and Mining Right Application

Digby Wells

Geotechnical

Golder Associates Africa

Risk Management

VBKom Projects

Lidar Survey

Premier Group

 

Summary profiles of the above individuals and companies are provided and can be accessed here 

http://www.rns-pdf.londonstockexchange.com/rns/9728F_-2015-2-26.pdf

The above team continue to progress the Bushveld Vanadium Project Pre-Feasibility study, and it is expected that all the required drilling will have been completed by March this year.

Mining Right Application

The Company has made significant progress in preparing its Mining Right Application ("MRA") which is expected to be submitted shortly. This includes an Environmental Impact Assessment exercise led by Digby Wells, a Mining Works Programme led by The MSA Group, and a Social and Labour Plan being developed by Dr Fred Mpephu.

Enquiries: info@bushveldminerals.com

 

 

Bushveld Minerals

Fortune Mojapelo

+27 (0) 11 268 6555

Strand Hanson

Andrew Emmott

+44 (0) 20 7409 3494

Brandon Hill Capital

Jonathan Evans

+44 (0) 20 3463 5000

Tavistock Communications

Jos Simson/ Nuala Gallagher

+44 (0) 20 7920 3150

Tielle Communications

Stéphanie Leclercq

+27 (0) 83 307 7587

- ENDS -

 

 

Notes to the editor

Bushveld Minerals Limited is a mineral development company with a portfolio of vanadium-and titanium bearing iron ore and tin assets in Southern Africa. The Company owns the Bushveld Iron Ore Project and Mokopane Tin Project, both located on the northern limb of the Bushveld Complex, South Africa. In addition, Bushveld has a controlling interest in Lemur Resources (ASX: LMR), that owns the Imaloto coal project in Madagascar.

Bushveld was admitted to the AIM Market of the London Stock Exchange in March 2012.

The scientific and technical information contained within this announcement has been reviewed and approved by Professor Morris Viljoen, technical advisor and head geologist to the Company. Prof Morris (Pr.Ss.Nat) has a Msc and PhD degree in Geology from the University of Witwatersrand and 30 years' experience in the mining industry. He is a fellow of the Society of Economic Geologists (SEG), the Geological Society of South Africa (GSSA), the Southern African Institute of Mining and Metallurgy (SAIMM) and the Royal Society of South Africa (RSSA).

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBBGDDBUDBGUL
Date   Source Headline
16th May 20257:00 amRNSCancellation - Bushveld Minerals Limited
15th Apr 20254:28 pmRNSAppointment of Liquidators & Resignation of Nomad
11th Apr 20257:57 amRNSNotice of appointment of liquidators
15th Jan 20256:00 pmRNSBushveld Minerals
16th Dec 20247:15 amRNSBusiness Rescue and Operations Update
4th Dec 20247:00 amRNSResignation of Directors
29th Nov 20247:00 amRNSDefault on Shareholder Loan Repayment by Vanchem
19th Nov 202410:01 amRNSAppointment of Business Rescue Practitioners
18th Nov 20247:30 amRNSSuspension - Bushveld Minerals Limited
18th Nov 20247:00 amRNSTrading Suspension
8th Nov 20249:25 amRNSQ3 and 9M 2024 Operational Update
1st Nov 20243:05 pmRNSVanchem Sale Update
25th Oct 20242:21 pmRNSOperational Update
18th Oct 20249:18 amRNSDisposal of Interests in Lemur Holdings Limited
17th Sep 20247:00 amRNSInterim Results for Six Months ended 30 June 2024
10th Sep 20247:00 amRNSTurnaround Initiatives Underway
2nd Sep 20244:22 pmRNSOrion Matched Funding Received
14th Aug 20246:00 pmRNSSARB Approval for Orion US$10M Matched Funding
12th Aug 20244:13 pmRNSUS$2 million SPR Debt Funding Received
9th Aug 20249:55 amRNSAgreement re Settlement of SPR Subscription Funds
7th Aug 20244:25 pmRNSAnnual General Meeting Results
7th Aug 20247:00 amRNSDirector/PDMR Shareholding
6th Aug 20247:00 amRNSAnnual General Meeting Statement
31st Jul 20247:00 amRNSQ2 and H1 2024 Operational Update
24th Jul 20244:46 pmRNSHolding(s) in Company - Correction
15th Jul 202412:39 pmRNSDirector/PDMR Shareholding
12th Jul 20244:57 pmRNSDirector/PDMR Shareholding
11th Jul 20245:04 pmRNSPosting of Accounts & Notice of General Meeting
28th Jun 20245:30 pmRNSFinal Results for Year Ended 31 December 2023
28th Jun 20243:29 pmRNSFinancing Update: Orion matched funding of US$10m
28th Jun 20241:17 pmRNSHolding(s) in Company
26th Jun 202412:13 pmRNSHolding(s) in Company
24th Jun 20241:50 pmRNSSPR Funding & Orion 2024 Financing Package Update
31st May 20244:07 pmRNSCCSA Approval for sale of 64% interest in Mokopane
31st May 20241:07 pmRNSResult of Meeting
24th May 20245:53 pmRNSShareholder Correspondence and Questions & Answers
13th May 20247:00 amRNSPosting of Circular and Notice of General Meeting
7th May 20247:00 amRNSProposed conditional disposal of Vanchem
23rd Apr 20247:01 amRNSQ1 2024 Operational & Corporate Update
23rd Apr 20247:00 amRNSMineral Resources and Reserves Annual Update
14th Mar 20249:32 amRNSFurther Update on Outstanding Funds
14th Mar 20247:00 amRNSTR-1 Notification of Major Holdings
7th Mar 20243:00 pmRNSTR-1 Notification of Major Holdings
29th Feb 20245:30 pmRNSFurther Update on Outstanding Funds
16th Feb 20247:08 amRNSFurther update on Outstanding Funds
5th Feb 20247:08 amRNSFull year 2023 Operational Update
2nd Feb 20242:30 pmRNSForm 8.3 of the Takeover Code
1st Feb 20247:00 amRNSCompletion of Convertible Loan Note Refinancing
29th Jan 20244:25 pmRNSResignation of Finance Director
19th Jan 20244:32 pmRNSFurther Update on Outstanding Funds

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.