Firering Strategic Minerals: From explorer to producer. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBushveld Minerals Regulatory News (BMN)

Share Price Information for Bushveld Minerals (BMN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.575
Bid: 0.55
Ask: 0.60
Change: -0.03 (-5.00%)
Spread: 0.05 (9.091%)
Open: 0.575
High: 0.57
Low: 0.57
Prev. Close: 0.60
BMN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling work results - Bushveld Iron Ore Project

2 Nov 2012 07:00

RNS Number : 1617Q
Bushveld Minerals Limited
02 November 2012
 



2 November 2012

For Immediate Release

 

Bushveld Minerals Ltd

("Bushveld" or the "Company")

Detailed Drilling Programme Update

 Drilling work results at the Bushveld Iron Ore Projects

 

Bushveld Minerals Limited, (AIM: BMN), a mineral development company focused on iron and tin projects in southern Africa, is pleased to provide further details of the drilling programme following the Operational Update (Drilling) released on [11 October 2012].

Highlights:

·; P-Q Magnetite Zone ("P-Q Layer"): Extension of the strike of mineralisation and closely spaced (500m) core drilling (details are given in table 1).

o Significant diamond drilling intercepts include:

§ VK17 - 37.85m @ 52.894% Fe2O3

§ MAL2 - 41.84m @51.80% Fe2O3

§ VK18 - 37.85m @ 52.894% Fe2O3

·; Main Magnetite Layer: In-fill drilling programme to upgrade resource to indicated resource category. Geological continuity has now been proven - a total of 13 holes drilled with consistent intersections of between 8 and 10 metres along 5km strike length, based on visual observation (table 2).

·; P-Q Layer weathered zone: Shallow drilling to identify the outcrop position of the mineralisation and to establish a JORC compliant resource for the weathered zone. Geological continuity up to the ±2 - 5m thick soil layer proven (table 3).

 

P-Q Magnetite Layer Drilling:

Five boreholes totalling 1,525 metres were drilled during the second quarter of 2012. They comprised three boreholes to extend the strike of the mineralization by almost 1km or about 25% and two in-fill boreholes to bring drillhole spacing to 500m. Results of each borehole are detailed in Table 1 below.

 

Main Magnetite Layer (MML) - Infill drilling:

 

Thirteen boreholes were drilled in 2012, including three in the weathered zone. The boreholes were mainly in-fill boreholes designed to upgrade the Main Magnetite Layer ("MML") resource into the indicated resource category. Three boreholes did not intersect the MML, as they were drilled into the footwall (i.e. they were sited slightly east of the MML). Assay results are pending, but intersections based on visual inspection are consistent with the previously drilled boreholes on which the current resource was determined. The intersections are summarised in Table 2 below.

 

 

P-Q Magnetite - Weathered Zone drilling:

 

A shallow drilling programme was designed to accurately determine the sub-outcrop position of the mineralisation below a thin (±2 - 5m thick) soil layer while also ensuring sufficient boreholes to allow for an initial resource estimate for the shallow weathered material.

A number of shallow exploratory marker holes were drilled as part of two fence lines (A and B) aimed at defining the position of the P-Q layer and intersected the footwall of the P-Q layer (Table 3). Boreholes on lines C, D and E all intersected the P-Q layer (Table 3).

Core samples are currently being analysed with preliminary results indicating mineralisation consistent with the fresh unweathered zone. This weathered resource was not all included in the 260 million tonne indicated resource declared thus far on the P-Q zone, and will be included in a further resource update due Q1 2013.

 

Enquiries: info@bushveldminerals.com

Bushveld Minerals

Fortune Mojapelo

+27 (0) 11 268 6555

Fox Davies

Jonathan Evans

+44 (0) 20 3463 5000

Tavistock Communications

Jessica Fontaine / Jos Simson

+44 (0) 20 7920 3150

Tielle Communications

Stéphanie Leclercq

+27 (0) 83 307 7587

This information is provided by RNS

The company news service from the London Stock Exchange

- ENDS -

 

 

Notes to the editor

Bushveld Minerals Limited is a mineral development company focused on the Bushveld Iron Ore Project and the Mokopane Tin Project, both located on the northern limb of the Bushveld Complex, South Africa.

 

The Bushveld Iron Ore Project comprises two licenses covering 7,409 ha where a JORC compliant open-castable resource of 633 million tonnes (comprising 260 million tonnes Indicated and a further 373 million tonnes Inferred) has been established from a 4.5 km strike length. Further drilling along strike is expected to significantly add to the resource on the basis of identified strike extensions several kilometres long to the north and south of the project area with a target resource planned in excess of 1 billion tonnes. A scoping study on the project is underway for completion in Q1 2013.

 

The Mokopane Tin Project consists of one licence covering 13,422 ha of open-castable disseminated tin resource. The Company has explored one target and plans to drill a further four targets. The Company has established a JORC resource in excess of 5,000 tonnes of tin and is looking to expand the resource base by undertaking a drilling programme on the other three targets in the licence area and one target in a licence area currently under application. In the longer term, the Company intends to expand the resource base by acquiring further projects.

 

The Company was admitted to the Alternative Investment Market of the LSE in March 2012.

 

The scientific and technical information contained within this announcement has been reviewed and approved by Professor Morris Viljoen, technical advisor and head geologist to the Company. Prof Morris (Pr.Ss.Nat) has a Msc and PhD degree in Geology form Wits and 30 years experience in the mining industry. He is a fellow of the Society of Economic Geologists (SEG), the Geological Society of South Africa (GSSA), the Southern African Institute of Mining and Metallurgy (SAIMM) and the Royal Society of South Africa (RSSA).

 

 

Table 1 (Results of recent boreholes drilled into the P-Q magnetite layer):

 

Borehole ID

Farm

Reason for drilling

Depth

P-Q Intersection

Grade

VK16

Vliegekraal

Strike Extension

150.09 m

34-88 m (54 m intersection)

49.78m @ 31.90% Fe2O3 (67.85m @ 34.23% Fe2O3 if footwall mineralisation is included)

MAL2

Malokong

Strike Extension

156.63 m

64-116 m (52 m intersection)

41.84m @51.80% Fe2O3 (56.61m @ 50.56% Fe2O3 if footwall mineralisation is included)

VK17

Vliegekraal

Infill

399.48 m

260-303 m (43 m intersection)

37.85m @ 52.894% Fe2O3 (54.85m @ 48.955% Fe2O3 if footwall mineralisation is included)

VK18

Vliegekraal

Infill

427.2 m

288-335 m (47 m intersection)

42.65m @ 50.377%

(61.50m @ 44.85% Fe2O3 if footwall mineralisation is included)

VK19

Vliegekraal

Strike Extension

389.08 m

269-302 m (33 m intersection)

32.29m @ 45.67% Fe2O3

(47.29m @ 42.63% Fe2O3 if footwall mineralisation is included)

 

 

Table 2 (Intersection depths of infill boreholes drilled into the main magnetite layer):

Borehole ID

Farm

Reason for drilling

Depth

MML intersection

VK20

Vliegekraal

Extension

81.90

64.57m to 72.50m (7.93m intersection)

VK21

Vliegekraal

Infill

102.83

Not Intersected (drilled into footwall)

VK22

Vliegekraal

Infill

99.95

84.08 m to 93.03m (8.95m intersection)

VL8

Vriesland

Infill

88.21

58.63m to 68.20m (9.57m intersection)

VL9

Vriesland

Infill

93.61

Not Intersected (drilled into footwall)

VL10

Vriesland

Infill

57.80

Not Intersected (drilled into footwall)

VL11

Vriesland

Infill

51.85

31.38m to 39.53m (8.15m intersection)

VL12

Vriesland

Extension

99.94

83.75m to 91.90m (8.15m intersection)

VL13

Vriesland

Extension

40.33

22.15m to 30.48m (8.33m intersection)

VK 23

Vliegekraal

Infill

150.82

130.48m to 140.17m (9.69m intersection)

MW 01

Vriesland

Infill

14.00

1.50m to 11.50m (10.00m intersection)

MW 02

Vliegekraal

Infill

25.20

9.30m to 17.50m (8.20m intersection)

MW 03

Vriesland

Infill

20.00

6.50m to 12.00m & 13.50m to 17.77m (appears to be duplicated by faulting)

 

 

Table 3 (Boreholes drilled into the P-Q layer in the weathered zone):

 

Borehole ID

Farm

Line

Depth

P-Q Intersected

VKW1

Vliegekraal

A

15 m

No

VKW2

Vliegekraal

A

15 m

No

VKW3

Vliegekraal

A

15 m

No

VKW4

Vliegekraal

A

15 m

No

VKW5

Vliegekraal

A

15 m

No

VKW6

Vliegekraal

A

15 m

No

VKW7

Vliegekraal

A

20 m

No

VKW8

Vliegekraal

A

20 m

No

VKW9

Vliegekraal

A

30 m

Yes

VKW10

Vliegekraal

A

40 m

Yes

 

VKW11

Vliegekraal

A

60 m

Yes

 

VKW11.2

Vliegekraal

A

100 m

Yes

VKW12

Vliegekraal

B

15 m

Only upper portion

VKW13

Vliegekraal

B

15 m

Only upper portion

VKW14

Vliegekraal

B

15 m

Only upper portion

VKW15

Vliegekraal

B

15 m

Only upper portion

VKW16

Vliegekraal

B

15 m

Only upper portion

VKW17

Vliegekraal

B

15 m

Only upper portion

VKW18

Vliegekraal

B

20 m

Only upper portion

VKW19

Vliegekraal

B

20 m

Only upper portion

VKW20

Vliegekraal

B

35 m

Only upper portion

VKW21

Vliegekraal

B

45 m

Only upper portion

VKW22

Vliegekraal

B

20 m

Only upper portion

VKW32

Vliegekraal

B

15 m

Yes

Yes

Yes

 

VKW25

Vliegekraal

C

82 m

Yes

 

VKW24

Vliegekraal

C

50 m

Yes

 

VKW23

Vliegekraal

C

20 m

Yes

 

VKW26

Vliegekraal

D

50 m

Yes

 

VKW27

Vliegekraal

D

50 m

Yes

 

VKW28

Vliegekraal

D

20 m

Yes

 

VKW29

Vliegekraal

E

50 m

Yes

 

VKW30

Vliegekraal

E

50 m

Yes

 

VKW31

Vliegekraal

E

30 m

No

 

 

Click on, or paste the following link into your web browser, to view the associated PDF document:

http://www.rns-pdf.londonstockexchange.com/rns/1617Q_-2012-11-1.pdf 

 

http://www.rns-pdf.londonstockexchange.com/rns/1617Q_1-2012-11-1.pdf 

 

http://www.rns-pdf.londonstockexchange.com/rns/1617Q_2-2012-11-1.pdf 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEAPFFEEDAFFF
Date   Source Headline
2nd Jan 20143:40 pmRNSLemur Resources ASX Announcement
13th Dec 20134:34 pmRNSIssue of Equity
12th Dec 20137:00 amRNSIssue of Equity
10th Dec 20137:00 amRNSIssue of Equity
9th Dec 201311:28 amRNSMOU with China Railway No. 10 Co. Ltd
28th Nov 201312:58 pmRNSUnaudited Half Yearly Results
28th Nov 20137:00 amRNSLemur Resources ASX Announcement
27th Nov 201311:47 amRNSIntroducing a new platform - Bushveld Vanadium
26th Nov 20137:04 amRNSStrategic Review of Lemur Resources Limited
13th Nov 201312:22 pmRNSClarification: Significant Shareholders Update
7th Nov 201311:02 amRNSLemur Resources - Top 20 Shareholders
7th Nov 20137:00 amRNSSignificant Shareholders Update
6th Nov 20137:08 amRNSLemur Resources Limited - Board Changes
5th Nov 20133:51 pmRNSIssue of Equity
5th Nov 20137:00 amRNSClose of Offer for Lemur Resources Limited
30th Oct 20137:00 amRNSPlacing
29th Oct 20139:14 amRNSCorporate and Operations Update
22nd Oct 20137:00 amRNSIssue of Equity
18th Oct 20137:00 amRNSHolding(s) in Company
18th Oct 20137:00 amRNSHolding(s) in Company
15th Oct 20135:09 pmRNSHolding(s) in Company
15th Oct 20135:09 pmRNSHolding(s) in Company
15th Oct 20132:58 pmRNSHolding(s) in Company
15th Oct 20131:14 pmRNSHolding(s) in Company
14th Oct 20139:01 amRNSHolding(s) in Company
11th Oct 20133:39 pmRNSHolding(s) in Company
11th Oct 201310:11 amRNSFinal Extension of Offer for Lemur Resources Ltd
10th Oct 20134:00 pmRNSStatement re Share Price Movement
30th Sep 20139:47 amRNSIssue of Equity
26th Sep 20137:00 amRNS50% Acquisition of Marble Hall Tin Project
19th Sep 20137:00 amRNSOperations Update
12th Sep 201311:19 amRNSLemur interest over 52% and Offer extension
2nd Sep 20132:18 pmRNSIssue of Equity
30th Aug 201310:24 amRNSExtension of Offer for Lemur Resources Limited
30th Aug 20138:15 amRNSTotal Voting Rights
29th Aug 20137:00 amRNSPosting of Annual Report and Notice of AGM
27th Aug 20132:47 pmRNSLemur interest increase and Statement release
21st Aug 20137:00 amRNSIssue of Equity
14th Aug 20139:25 amRNSResponse to convening of general meeting for Lemur
25th Jul 201310:34 amRNSExtension of Offer for Lemur Resources Limited
23rd Jul 20137:00 amRNSConvertible loan note
19th Jul 201310:30 amRNSUpdate on Takeover Bid for Lemur Resources
8th Jul 201312:37 pmRNSUpdate on Takeover Bid for Lemur Resources
2nd Jul 20132:25 pmRNSUpdate on Takeover Bid for Lemur Resources
28th Jun 20137:00 amRNSFinal Results for the Year Ended 28 February 2013
25th Jun 20137:00 amRNSMokopane Tin Project: Zaaiplaats Drilling Results
17th Jun 20137:53 amRNSASIC grants BMN an exemption
3rd Jun 20133:30 pmRNSResults of General Meeting
3rd Jun 201311:26 amRNSUpdate: Take Over Offer for Lemur Resources
17th May 20133:58 pmRNSNotice of General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.