The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBushveld Minerals Regulatory News (BMN)

Share Price Information for Bushveld Minerals (BMN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.60
Bid: 0.55
Ask: 0.65
Change: 0.05 (9.09%)
Spread: 0.10 (18.182%)
Open: 0.55
High: 0.625
Low: 0.55
Prev. Close: 0.55
BMN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling work results - Bushveld Iron Ore Project

2 Nov 2012 07:00

RNS Number : 1617Q
Bushveld Minerals Limited
02 November 2012
 



2 November 2012

For Immediate Release

 

Bushveld Minerals Ltd

("Bushveld" or the "Company")

Detailed Drilling Programme Update

 Drilling work results at the Bushveld Iron Ore Projects

 

Bushveld Minerals Limited, (AIM: BMN), a mineral development company focused on iron and tin projects in southern Africa, is pleased to provide further details of the drilling programme following the Operational Update (Drilling) released on [11 October 2012].

Highlights:

·; P-Q Magnetite Zone ("P-Q Layer"): Extension of the strike of mineralisation and closely spaced (500m) core drilling (details are given in table 1).

o Significant diamond drilling intercepts include:

§ VK17 - 37.85m @ 52.894% Fe2O3

§ MAL2 - 41.84m @51.80% Fe2O3

§ VK18 - 37.85m @ 52.894% Fe2O3

·; Main Magnetite Layer: In-fill drilling programme to upgrade resource to indicated resource category. Geological continuity has now been proven - a total of 13 holes drilled with consistent intersections of between 8 and 10 metres along 5km strike length, based on visual observation (table 2).

·; P-Q Layer weathered zone: Shallow drilling to identify the outcrop position of the mineralisation and to establish a JORC compliant resource for the weathered zone. Geological continuity up to the ±2 - 5m thick soil layer proven (table 3).

 

P-Q Magnetite Layer Drilling:

Five boreholes totalling 1,525 metres were drilled during the second quarter of 2012. They comprised three boreholes to extend the strike of the mineralization by almost 1km or about 25% and two in-fill boreholes to bring drillhole spacing to 500m. Results of each borehole are detailed in Table 1 below.

 

Main Magnetite Layer (MML) - Infill drilling:

 

Thirteen boreholes were drilled in 2012, including three in the weathered zone. The boreholes were mainly in-fill boreholes designed to upgrade the Main Magnetite Layer ("MML") resource into the indicated resource category. Three boreholes did not intersect the MML, as they were drilled into the footwall (i.e. they were sited slightly east of the MML). Assay results are pending, but intersections based on visual inspection are consistent with the previously drilled boreholes on which the current resource was determined. The intersections are summarised in Table 2 below.

 

 

P-Q Magnetite - Weathered Zone drilling:

 

A shallow drilling programme was designed to accurately determine the sub-outcrop position of the mineralisation below a thin (±2 - 5m thick) soil layer while also ensuring sufficient boreholes to allow for an initial resource estimate for the shallow weathered material.

A number of shallow exploratory marker holes were drilled as part of two fence lines (A and B) aimed at defining the position of the P-Q layer and intersected the footwall of the P-Q layer (Table 3). Boreholes on lines C, D and E all intersected the P-Q layer (Table 3).

Core samples are currently being analysed with preliminary results indicating mineralisation consistent with the fresh unweathered zone. This weathered resource was not all included in the 260 million tonne indicated resource declared thus far on the P-Q zone, and will be included in a further resource update due Q1 2013.

 

Enquiries: info@bushveldminerals.com

Bushveld Minerals

Fortune Mojapelo

+27 (0) 11 268 6555

Fox Davies

Jonathan Evans

+44 (0) 20 3463 5000

Tavistock Communications

Jessica Fontaine / Jos Simson

+44 (0) 20 7920 3150

Tielle Communications

Stéphanie Leclercq

+27 (0) 83 307 7587

This information is provided by RNS

The company news service from the London Stock Exchange

- ENDS -

 

 

Notes to the editor

Bushveld Minerals Limited is a mineral development company focused on the Bushveld Iron Ore Project and the Mokopane Tin Project, both located on the northern limb of the Bushveld Complex, South Africa.

 

The Bushveld Iron Ore Project comprises two licenses covering 7,409 ha where a JORC compliant open-castable resource of 633 million tonnes (comprising 260 million tonnes Indicated and a further 373 million tonnes Inferred) has been established from a 4.5 km strike length. Further drilling along strike is expected to significantly add to the resource on the basis of identified strike extensions several kilometres long to the north and south of the project area with a target resource planned in excess of 1 billion tonnes. A scoping study on the project is underway for completion in Q1 2013.

 

The Mokopane Tin Project consists of one licence covering 13,422 ha of open-castable disseminated tin resource. The Company has explored one target and plans to drill a further four targets. The Company has established a JORC resource in excess of 5,000 tonnes of tin and is looking to expand the resource base by undertaking a drilling programme on the other three targets in the licence area and one target in a licence area currently under application. In the longer term, the Company intends to expand the resource base by acquiring further projects.

 

The Company was admitted to the Alternative Investment Market of the LSE in March 2012.

 

The scientific and technical information contained within this announcement has been reviewed and approved by Professor Morris Viljoen, technical advisor and head geologist to the Company. Prof Morris (Pr.Ss.Nat) has a Msc and PhD degree in Geology form Wits and 30 years experience in the mining industry. He is a fellow of the Society of Economic Geologists (SEG), the Geological Society of South Africa (GSSA), the Southern African Institute of Mining and Metallurgy (SAIMM) and the Royal Society of South Africa (RSSA).

 

 

Table 1 (Results of recent boreholes drilled into the P-Q magnetite layer):

 

Borehole ID

Farm

Reason for drilling

Depth

P-Q Intersection

Grade

VK16

Vliegekraal

Strike Extension

150.09 m

34-88 m (54 m intersection)

49.78m @ 31.90% Fe2O3 (67.85m @ 34.23% Fe2O3 if footwall mineralisation is included)

MAL2

Malokong

Strike Extension

156.63 m

64-116 m (52 m intersection)

41.84m @51.80% Fe2O3 (56.61m @ 50.56% Fe2O3 if footwall mineralisation is included)

VK17

Vliegekraal

Infill

399.48 m

260-303 m (43 m intersection)

37.85m @ 52.894% Fe2O3 (54.85m @ 48.955% Fe2O3 if footwall mineralisation is included)

VK18

Vliegekraal

Infill

427.2 m

288-335 m (47 m intersection)

42.65m @ 50.377%

(61.50m @ 44.85% Fe2O3 if footwall mineralisation is included)

VK19

Vliegekraal

Strike Extension

389.08 m

269-302 m (33 m intersection)

32.29m @ 45.67% Fe2O3

(47.29m @ 42.63% Fe2O3 if footwall mineralisation is included)

 

 

Table 2 (Intersection depths of infill boreholes drilled into the main magnetite layer):

Borehole ID

Farm

Reason for drilling

Depth

MML intersection

VK20

Vliegekraal

Extension

81.90

64.57m to 72.50m (7.93m intersection)

VK21

Vliegekraal

Infill

102.83

Not Intersected (drilled into footwall)

VK22

Vliegekraal

Infill

99.95

84.08 m to 93.03m (8.95m intersection)

VL8

Vriesland

Infill

88.21

58.63m to 68.20m (9.57m intersection)

VL9

Vriesland

Infill

93.61

Not Intersected (drilled into footwall)

VL10

Vriesland

Infill

57.80

Not Intersected (drilled into footwall)

VL11

Vriesland

Infill

51.85

31.38m to 39.53m (8.15m intersection)

VL12

Vriesland

Extension

99.94

83.75m to 91.90m (8.15m intersection)

VL13

Vriesland

Extension

40.33

22.15m to 30.48m (8.33m intersection)

VK 23

Vliegekraal

Infill

150.82

130.48m to 140.17m (9.69m intersection)

MW 01

Vriesland

Infill

14.00

1.50m to 11.50m (10.00m intersection)

MW 02

Vliegekraal

Infill

25.20

9.30m to 17.50m (8.20m intersection)

MW 03

Vriesland

Infill

20.00

6.50m to 12.00m & 13.50m to 17.77m (appears to be duplicated by faulting)

 

 

Table 3 (Boreholes drilled into the P-Q layer in the weathered zone):

 

Borehole ID

Farm

Line

Depth

P-Q Intersected

VKW1

Vliegekraal

A

15 m

No

VKW2

Vliegekraal

A

15 m

No

VKW3

Vliegekraal

A

15 m

No

VKW4

Vliegekraal

A

15 m

No

VKW5

Vliegekraal

A

15 m

No

VKW6

Vliegekraal

A

15 m

No

VKW7

Vliegekraal

A

20 m

No

VKW8

Vliegekraal

A

20 m

No

VKW9

Vliegekraal

A

30 m

Yes

VKW10

Vliegekraal

A

40 m

Yes

 

VKW11

Vliegekraal

A

60 m

Yes

 

VKW11.2

Vliegekraal

A

100 m

Yes

VKW12

Vliegekraal

B

15 m

Only upper portion

VKW13

Vliegekraal

B

15 m

Only upper portion

VKW14

Vliegekraal

B

15 m

Only upper portion

VKW15

Vliegekraal

B

15 m

Only upper portion

VKW16

Vliegekraal

B

15 m

Only upper portion

VKW17

Vliegekraal

B

15 m

Only upper portion

VKW18

Vliegekraal

B

20 m

Only upper portion

VKW19

Vliegekraal

B

20 m

Only upper portion

VKW20

Vliegekraal

B

35 m

Only upper portion

VKW21

Vliegekraal

B

45 m

Only upper portion

VKW22

Vliegekraal

B

20 m

Only upper portion

VKW32

Vliegekraal

B

15 m

Yes

Yes

Yes

 

VKW25

Vliegekraal

C

82 m

Yes

 

VKW24

Vliegekraal

C

50 m

Yes

 

VKW23

Vliegekraal

C

20 m

Yes

 

VKW26

Vliegekraal

D

50 m

Yes

 

VKW27

Vliegekraal

D

50 m

Yes

 

VKW28

Vliegekraal

D

20 m

Yes

 

VKW29

Vliegekraal

E

50 m

Yes

 

VKW30

Vliegekraal

E

50 m

Yes

 

VKW31

Vliegekraal

E

30 m

No

 

 

Click on, or paste the following link into your web browser, to view the associated PDF document:

http://www.rns-pdf.londonstockexchange.com/rns/1617Q_-2012-11-1.pdf 

 

http://www.rns-pdf.londonstockexchange.com/rns/1617Q_1-2012-11-1.pdf 

 

http://www.rns-pdf.londonstockexchange.com/rns/1617Q_2-2012-11-1.pdf 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEAPFFEEDAFFF
Date   Source Headline
6th Nov 20184:10 pmRNSExercise of Warrants & Total Voting Rights-Amend
6th Nov 20181:56 pmRNSExercise of Warrants and Total Voting Rights
2nd Nov 20183:52 pmRNSHolding(s) in Company
31st Oct 20189:30 amRNSInvitation to interactive Energy Storage webinar
17th Oct 20187:00 amRNSLemur Q3 Operational Update
1st Oct 20185:35 pmRNSHolding(s) in Company
27th Sep 201812:30 pmRNSUpdate on Black Economic Empowerment Ownership
26th Sep 20187:00 amRNSInterim results for the period ended 30 June 2018
21st Sep 20184:15 pmRNSResolution of Unprotected Industrial Action
13th Sep 20187:00 amRNSAcquisition of Sojitz interest in SMC
12th Sep 20184:15 pmRNSUpdate on Industrial Action
7th Sep 201810:45 amRNSUnprotected Industrial Action
22nd Aug 20182:00 pmRNSBushveld Vanadium Q2 Operational Update
13th Aug 20185:59 pmRNSExercise of Warrants and Total Voting Rights
8th Aug 20185:13 pmRNSResult of Annual General Meeting & Issue of Equity
11th Jul 20187:00 amRNSBushveld Energy Q2 Operating Update
6th Jul 201812:20 pmRNSExercise of Warrants and Total Voting Rights
4th Jul 20187:00 amRNSLemur Q2 Operational Update
29th Jun 20187:01 amRNSFinal Results for Period Ended 31 December 2017
28th Jun 20187:10 amRNSBushveld Vametco - Completion of Phase Two
20th Jun 20185:20 pmRNSHolding(s) in Company
14th Jun 20187:00 amRNSRedemption of Convertible Bonds
22nd May 20189:39 amRNSLemur Concludes Concession Agreement
17th May 20184:37 pmRNSExercise of Warrants and Total Voting Rights
27th Apr 20187:21 amRNSBushveld Vanadium Q1 Operational Update
23rd Apr 201810:00 amRNSTR-1
19th Apr 20187:00 amRNSVanadium 101 Interactive Webinar
11th Apr 20188:30 amRNSBushveld Energy Q1 Operational Update
5th Apr 20182:36 pmRNSExercise of Warrants and Total Voting Rights
5th Apr 201810:30 amRNSLemur Resources Q1 Operational Update
29th Mar 20189:52 amRNSTR-1
28th Mar 20187:00 amRNSAppointment of Michael Kirkwood
26th Mar 20182:59 pmRNSUS$22.2 million equity placing
14th Mar 201812:01 pmRNSExercise of Convertible Bonds
1st Mar 20187:00 amRNSAppointment of Joint Broker
19th Feb 20185:13 pmRNSExercise of Convertible Bonds and TVR
29th Jan 201811:35 amRNSExercise of Warrants and Total Voting Rights
23rd Jan 20181:33 pmRNSExercise of Convertible Bonds and TVR
22nd Jan 20187:00 amRNSQ4 Operational Update
18th Jan 20187:00 amRNSExercise of Convertible Bonds and TVR
10th Jan 20183:36 pmRNSExercise of Warrants and Total Voting Rights
2nd Jan 20181:15 pmRNSChange of Accounting Reference Date
21st Dec 20177:00 amRNSCompletion of Acquisition and Readmission to AIM
20th Dec 20171:45 pmRNSResults of General Meeting
19th Dec 201710:54 amRNSSchedule 1 update - Bushveld Minerals Limited
18th Dec 201710:34 amRNSIssuance of Second tranche of Convertible bonds
1st Dec 20171:13 pmRNSExercise of Convertible Bonds and TVR
30th Nov 201711:00 amRNSSchedule One - Bushveld Minerals Limited
30th Nov 20177:00 amRNSProposed Acquisition of 55% of Bushveld Vametco
29th Nov 20177:00 amRNSInterim Results For Period Ended 31 August 2017

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.