Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Eng Regulatory News (BKY)

Share Price Information for Berkeley Eng (BKY)

Share Price is delayed by 15 minutes
Get Live Data
24.50    0.00 (0.00%)
Bid:
24.00
Ask:
25.00
Spread: 1.00 (4.167%)
Market Cap: £109.34m
BKY Live PriceLast checked at - London Stock Exchange

Intraday Berkeley Eng Share Chart

Resource Update

8 Aug 2008 08:55

RNS Number : 9423A
Berkeley Resources Limited
08 August 2008
Β 

ο»Ώ

8 August 2008

INITIAL RESOURCE OF 9.23 million pounds

at THE GAMBUTA DEPOSITΒ 

The Directors of Berkeley Resources Limited (AIM: BKY.L) are pleased toΒ announceΒ an initial inferred resource estimate of 9.23 million pounds of U3O8,Β at an average grade of 371ppm U3O8Β (at a 200ppm cutoff), for the Gambuta uranium deposit in the CΓ‘ceresΒ ProvinceΒ ofΒ Spain.Β 

The deposit remains open along strike to the north-west however, drilling has ceased during the current fire season.

Β 

It is anticipated that drilling to test the considerable strike potential beneath Tertiary and Quaternary cover to the northwestΒ will resume in early October.Β 

Background

The Gambuta deposit occurs within the Caceres VI license and is located 165kms west-southwest of Madrid, about 20kms south of the Badajoz - Madrid freeway andΒ 6Β kms east ofΒ the village ofΒ Bohonal de Ibor. It is typical of aΒ number of perigranitic, shale hostedΒ uranium mineral occurrencesΒ within the Caceres VI licence, such asΒ El Zarzal and Ojaranzo,Β located in the central and eastern part of theΒ tenement respectively. Additional targets for uranium, exploration have been identified in adjacent areas.Β 

Gambuta is associated with an area of anomalous radiometrics defined by the Junta de Energia Nuclear (JEN) in the 1960's and briefly explored by CISA (a joint venture between COGEMA (now AREVA) and ENUSA (Empresa Nacional Uranio S.A.)) in the early 1990's. Roto percussion drilling by CISA (24 holes) identified a mineralised, north-westerly trending, structural zone with dimensions of approximately 900m x 400m, including a central untested area of Tertiary cover.Β 

A 36 hole program by Berkeley has confirmed the CISA results and defined a continuous, structurally controlled, zone of mineralisation which is 250 - 350m wide, up to 94m below surface (see Figure 3) and is continuous for 1,500m in a west-northwesterly direction. This zone appears to extend beneath Tertiary and Quaternary cover to the north-west and about 1,300m of untested strike potential remains within the license.

Uranium mineralisation occurs within a sequence of strongly deformed Proterozoic spotted and banded grey to black phyllites which have been contact metamorphosed by Hercynian granites. The contacts between the phyllites and the granite to the east and northeast are tectonic. The sequence of host phyllites at Gambuta is similar to that hosting the Retortillo deposit in theΒ SalamancaΒ I license.

As at Retortillo, the Gambuta uranium mineralisation is generally sub-horizontal and associated with the weathering profile; a similar model of formation is envisaged. Most mineralisation occurs in the zone of partial oxidation. Deeper mineralisation is associated with oxidation along steeply dipping shears and fractures, dominantly sub-parallel to the mineralised trends. Uranium mineralisation occurs within the schistosity, particularly in zones of shearing and fracturing. The only visible uranium minerals are secondary autunite and torbernite.

The main mineralised horizon averages 9.4m in thickness and occurs at an average depth of 18.0m, beneath Tertiary cover and shales. A lower mineralised horizon averages 2.1m in thickness and is separated from the main horizon by 16.3m of shales. A central, higher grade (+0.1% U3O8,) zone, about 100m wide, is evident in the north-western half of the deposit and is open along strike.

Resource Calculation

All drilling results for the deposit have been previously reported in Stock Exchange announcements on 10 April, 6 June and 31 July 2008.Β 

Assessment and interpretation of the historical and Berkeley drilling information was undertaken by Company geologists and resource modelling was assisted by McDonald Speijers, a consulting group with more than 15 years experience in resource calculations. Resources were calculated by block modelling methods, using an inverse distance squared method of grade distribution, and cross-checked using kriging methods. The resource classification has been completed in accordance with the JORC Code. Grades were estimated using a calculated U3O8Β value from total uranium as determined by Delayed Neutron Count, determined by Actlabs (Canada) with associated duplicates, blanks and standards.

Of necessity, the block model employed large block sizes (25m x 25m x 2m) consistent with the wide-spaced location of drillholes, within a wireframe defined by the interpretation of geological, radiometric and weathering data. This has resulted in some "spreading" of the grade and subsequent infill drilling is expected to result in a more realistic grade distribution. Incorporation of variable densities was based on measurements on selected core samples from diamond drill core, using the wet dry method.

Initial inferred uranium resources for the Gambuta deposit have been calculated as follows:

At aΒ 200ppm U3O8Β cut-off,Β 

11.29Mt of ore at a grade of 371ppm U3O8Β containing 9.23Mlbs U3O8

At aΒ 150ppm U3O8Β cut-off,Β 

15.49Mt of ore at a grade of 318ppm U3O8Β containing 10.85Mlbs U3O8

At aΒ 100ppm U3O8Β cut-off,Β 

19.46Mt of ore at a grade of 278ppm U3O8Β containing 11.95Mlbs U3O8

.

Future work

The next round of RC and diamond drilling will commence at the end of the high risk fire season, which is anticipated to be early in October. This program will focus on defining the north-westerly extent of the deposit, whereΒ topography indicates potential for extensions beneath Tertiary and Quaternary cover for a further 1.3km.Β 

Infill drilling will be undertaken as required to better define the limits of mineralisation, in particular, the central zone of higher grade mineralisation.Β 

Diamond drilling will initially be directed to acquiring material for metallurgical testwork.

Enquiries - Managing Director: Matt Syme Tel: +61 417 906 717

RBC Capital Markets:Β  Martin Eales Tel: +44 20 7029 7881

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCSSDSWASASEIA
Date   Source Headline
17th Jan 20117:00 amRNSAppointment of Chairman
17th Jan 20117:00 amRNSExpiry of OAO Severstal Subscription Right
30th Dec 20107:00 amRNSUpdate on Offer Proposal and Director Resignation
24th Dec 201010:11 amRNSShare Dealing Code
21st Dec 20107:55 amRNSBlocklisting Interim Review
16th Dec 20109:49 amRNSSalamanca Uranium Project Update
14th Dec 20108:49 amRNSExploitation Plan for Salamanca Uranium Project
10th Dec 20104:20 pmRNSExtension of Subscription Agreement
6th Dec 20107:47 amRNSDrilling Report
29th Nov 20107:47 amRNSResult of AGM
26th Nov 201010:09 amRNSSection 708A
26th Nov 201010:05 amRNSPlacing and Update on Potential Offer
12th Nov 20109:10 amRNSAppendix 3Y
10th Nov 20109:05 amRNSIssue of Equity
29th Oct 201010:35 amRNSPossible Takeover and Interim Funding Agreement
29th Oct 20109:01 amRNSAppendix 5B
29th Oct 20109:00 amRNSQuarterly Report
14th Oct 201012:09 pmRNSBoard Appointment
11th Oct 20108:05 amRNSIssue of Equity
4th Oct 20108:02 amRNSFinal Director's Interest Notice
1st Oct 201011:38 amRNSAnnual Financial Report
1st Oct 201010:16 amRNSBoard Changes
23rd Sep 20107:55 amRNSUpgraded Mineral Resources
7th Sep 20107:58 amRNSBoard Changes
2nd Sep 20107:29 amRNSChange of Registered Address
16th Aug 201011:41 amRNSIssue of Equity
10th Aug 20108:33 amRNSDevelopment and Financing Partnership with KEPCO
6th Aug 20109:14 amRNSIssue of Equity
30th Jul 20108:25 amRNSAppendix 5B
30th Jul 20108:13 amRNSQuarterly Report
7th Jul 20109:06 amRNSHolding(s) in Company
2nd Jul 20108:02 amRNSFinancial advisor
30th Jun 20108:33 amRNSCompany Secretary Change
28th Jun 20107:57 amRNSCommencement of Drilling
18th Jun 20107:59 amRNSIssue of Equity
15th Jun 201010:31 amRNSAppendix 3Y
7th Jun 20108:01 amRNSMetallurgical Testing
25th May 20108:11 amRNSDrilling Report
20th May 20108:35 amRNSBlocklisting Interim Review
19th May 201011:46 amRNSIssue of Equity
30th Apr 201010:12 amRNSQuarterly Report
30th Apr 201010:10 amRNSAppendix 5B
28th Apr 20109:11 amRNSAppointment of CFO
1st Apr 20108:14 amRNSAppendix 3Y
1st Apr 20108:13 amRNSAppendix 3B
1st Apr 20108:10 amRNSResult of EGM
30th Mar 20107:50 amRNSHolding(s) in Company
30th Mar 20107:49 amRNSResources Update
19th Mar 20108:08 amRNSAppendix 3B
18th Mar 20107:00 amRNSDrilling Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.