PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Eng Regulatory News (BKY)

Share Price Information for Berkeley Eng (BKY)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 19.25
Bid: 19.00
Ask: 19.50
Change: -0.25 (-1.28%)
Spread: 0.50 (2.632%)
Open: 18.75
High: 19.25
Low: 18.75
Prev. Close: 19.50
BKY Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Commencement of Drilling

28 Jun 2010 07:57

RNS Number : 3193O
Berkeley Resources Limited
28 June 2010
 



28 June 2010

 

BERKELEY RESOURCES LIMITED

 

Reverse Circulation Drilling - Salamanca Uranium Project

 

Berkeley is pleased to announce the commencement of the first phase of Reverse Circulation (RC) drilling at the Salamanca Uranium Project in Spain. Three rigs have been mobilized to site and are drilling with another rig to commence shortly. This new programme aims to achieve the following objectives:

·; To upgrade the current resource classifications from Indicated to Measured and from Inferred to Indicated

·; To test for lateral and depth extensions of the current resource in areas where recent diamond drilling has shown the deposits are open

·; To test a number of high priority targets identified by surface mapping and ground radiometrics that are proximal to the existing resource

·; To complete sterilization drilling of the area to the north of Sageras where the conceptual waste dump and crushing facility have been located.

The total number of planned holes are summarised in Table 1 and it is anticipated that the programme will be completed by the end of July.

 

Deposit

Phase 1

Phase 2

Total

Holes

Metres

Holes

Metres

Holes

Metres

Palacios North

10

1,085

10

1,085

Sageras

35

2,260

35

2,005

70

4,265

Alameda South

25

2,770

25

2,770

Total

60

5,030

45

3,090

105

8,120

Table 1 - Planned RC Drilling

Commenting on the start of the RC drilling campaign, the Managing Director of Berkeley Resources Mr. Ian Stalker said:

 

"The RC drilling campaign in addition to upgrading the current resource classifications into indicated and measured categories, will also test the potential extensions of the current resources and additional exploration targets in the area"

 

 

Enquiries - Managing Director: Ian Stalker Tel: +34 608 221 497  

RBC Capital Markets: Martin Eales Tel: +44 20 7029 7881

 

Salamanca Uranium Project

 

The Salamanca Uranium Project (SUP) consists of four areas containing a number of metasedimentary hosted uranium deposits located in the western part of Salamanca Province. These deposits are near surface accumulations of open pittable uranium within close proximity to the Quercus uranium ore processing plant.

 

The SUP study is focused initially on the Águila (Palacios North and Sageras deposits) and Alameda (Alameda South deposit) areas, with possible extension to the Retortillo (Retortillo and Santidad deposits) and Villar areas.

 

Berkeley has already completed an extended diamond drilling campaign designed to confirm the historical data, enable the calculation of Mineral Resource estimates and generate sufficient material for metallurgical test work now underway at SGS in Perth. Following completion of the confirmatory diamond drilling program in March, Berkeley announced initial Mineral Resource Estimates for the Sageras, Palacios North and Alameda South deposits (Table 2).

 

 

Deposit

Resource

Tonnes

U3O8

U3O8

U3O8

Category

Berkeley

U3O8

Name

Category

(Mt)

(ppm)

(t)

(Mlbs)

(%)

(%)

(Mlbs)

Measured

4.7

380

1,779

3.9

46%

90%

3.5

Indicated

2.3

430

977

2.2

25%

90%

1.9

Subtotal M+I

7.0

396

2,755

6.1

71%

90%

5.5

Inferred

2.8

410

1,143

2.5

29%

90%

2.3

Sageras

Total

9.7

400

3,899

8.6

100%

90%

7.7

Measured

0.9

515

483

1.1

23%

90%

1.0

Indicated

2.9

502

1,438

3.2

67%

90%

2.9

Subtotal M+I

3.8

505

1,922

4.2

90%

90%

3.8

Inferred

0.4

531

211

0.5

10%

90%

0.4

Palacios North

Total

4.2

508

2,133

4.7

100%

90%

4.2

Indicated

8.6

480

4,133

9.1

49%

90%

8.2

Inferred

9.8

439

4,280

9.4

51%

90%

8.5

Alameda South

Total

18.4

458

8,413

18.5

100%

90%

16.7

Measured

5.6

403

2,262

5.0

16%

90%

4.5

Indicated

13.7

476

6,548

14.4

45%

90%

13.0

Subtotal M+I

19.4

455

8,810

19.4

61%

90%

17.5

SUP

Inferred

12.9

436

5,635

12.4

39%

90%

11.2

Study

Total

32.3

447

14,445

31.8

100%

90%

28.7

Table 2 - Mineral Resource Estimates

 

Reverse Circulation Drilling

 

Following recent approval by the Salamanca Mines Department, RC drilling commenced in June with one rig located at Sageras and another at Alameda South. The drilling campaign is being conducted in two phases:

 

Phase 1 - This phase is aimed at upgrading the Inferred mineral resources at Sageras and Alameda South into the Measured and Indicated categories. The Mineral Resource Estimates will then be updated followed by detailed pit optimization studies.

 

Phase 2 - This phase is focused on extensions to the current mineral resources at Sageras and Palacios where the confirmatory diamond drilling program demonstrated potential.

 

Diamond drilling at Sageras intersected significant mineralization below the limits of the historical drilling and these areas will now be targeted with angled RC drill holes. Additional potential exists on the western margin of the Sageras deposit (previously referred to as Zona M) where two traverses of holes are planned to test for possible extensions.

 

A further nine RC holes have been planned to test the area immediately to the north of the Sageras deposit where the conceptual design for the waste dumps has been located.

 

At Palacios North, new geological modelling has identified a number of important structural zones potentially connecting the two main mineralized domains that are previously untested by the historical drilling. These targets will be tested with a number of angled RC holes. Potential for continuation of the southerly extensions of the eastern mineralized domain will also be targeted with a number of holes during this campaign.

 

 

A full version of this announcement, including maps and images, is available on the Company's website, www.berkeleyresources.com.au.

 

 

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr. Ross Corben, who is a Member of The Australian Institute of Mining and Metallurgy and an employee of Berkeley Resources Limited. Mr. Corben has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Corben consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLKKFDPABKKQAB
Date   Source Headline
26th Apr 20247:00 amRNSBoard Changes
26th Apr 20247:00 amRNSQuarterly Report March 2024
10th Apr 20247:32 amRNSCommencement of Arbitration against Spain
13th Mar 20247:05 amRNSHalf-Year Accounts
30th Jan 20247:00 amRNSQuarterly Report December 2023
2nd Jan 20247:00 amRNSExpiry of Unlisted Options
27th Dec 20237:00 amRNSPermitting update
21st Dec 20237:00 amRNSReport on Payments to Govts
21st Nov 20237:00 amRNSResult of AGM
30th Oct 20237:00 amRNSSeptember 2023 Quarterly
11th Oct 20237:00 amRNSNotice of AGM
22nd Sep 20237:00 amRNSDate of Annual General Meeting
30th Aug 20237:00 amRNS2023 Annual Report
26th Jul 20237:57 amRNSIssue of Unlisted Options
24th Jul 20237:00 amRNSQuarterly Report June 2023
19th Jul 20237:00 amRNSResults of Meeting
19th Jun 20237:00 amRNSNotice of General Meeting
31st May 20237:00 amRNSExpiry of Unlisted Options
28th Apr 20237:00 amRNSQuarterly Report March 2023
3rd Apr 202312:12 pmRNSPermitting Update
14th Mar 20237:00 amRNSHalf-year Report
7th Feb 20234:40 pmRNSSecond Price Monitoring Extn
7th Feb 20234:35 pmRNSPrice Monitoring Extension
7th Feb 20231:12 pmRNSPermitting Update
31st Jan 20237:00 amRNSQuarterly Report December 2022
26th Jan 20234:40 pmRNSSecond Price Monitoring Extn
26th Jan 20234:35 pmRNSPrice Monitoring Extension
3rd Jan 20237:00 amRNSExpiry of Unlisted Options
22nd Dec 20227:00 amRNSReport on Payments to Governments
1st Dec 20227:00 amRNSUnlisted Options
18th Nov 20227:00 amRNSNotification of Investment Dispute
15th Nov 20227:00 amRNSResult of AGM
9th Nov 20227:00 amRNSBerkeley establishes Spanish Advisory Committee
27th Oct 20227:00 amRNSQuarterly Report September 2022
20th Oct 20222:13 pmRNSPublication of a Prospectus
4th Oct 20227:00 amRNSNotice of AGM
23rd Sep 20224:35 pmRNSPrice Monitoring Extension
19th Sep 20227:45 amRNSDate of AGM
31st Aug 202210:00 amRNS2022 Annual Report
29th Jul 20227:00 amRNSQuarterly Report June 2022
5th Jul 20227:00 amRNSChange of Director’s Interest Notice
28th Jun 20227:00 amRNSStrengthening of Board with Spanish Based Director
29th Apr 20227:00 amRNSQuarterly Report March 2022
29th Apr 20227:00 amRNSQuarterly Report March 2022
5th Apr 20228:46 amRNSNotice of Initial Substantial Holder
5th Apr 20227:00 amRNSNotice of Initial Substantial Holder
1st Apr 20227:00 amRNSSettlement of OIA Claim
24th Mar 20224:36 pmRNSPrice Monitoring Extension
24th Mar 20222:00 pmRNSPrice Monitoring Extension
24th Mar 202211:05 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.