Scancell founder says the company is ready to commercialise novel medicines to counteract cancer. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Eng Regulatory News (BKY)

Share Price Information for Berkeley Eng (BKY)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 19.50
Bid: 19.00
Ask: 20.00
Change: -1.00 (-4.88%)
Spread: 1.00 (5.263%)
Open: 20.50
High: 20.50
Low: 19.50
Prev. Close: 20.50
BKY Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Metallurgical Testing

7 Jun 2010 08:01

RNS Number : 1515N
Berkeley Resources Limited
07 June 2010
 



7 June 2010

 

BERKELEY RESOURCES LIMITED

Salamanca Uranium Project

Metallurgical Test Work Update

 

Berkeley Resources Limited is pleased to announce the commencement of the metallurgical test work and initial results from the Salamanca Uranium Project in Spain. The first round of dynamic leach tests have produced encouraging results with uranium extraction up to 93% generated in acid batch leach tests for bulk samples from Palacios and Sageras. Acid leach is a proven technology and was previously used in the Salamanca Operation (from 1994 to 2003) at the Quercus Processing Plant.

 

The key results from the test work completed to date at the SGS Lakefield Laboratory in Perth, Australia, are summarised below:

 

·; Leach recoveries greater than 93% at Palacios and 87% at Sageras using an acid based process;

·; A relatively coarse grind at a P80 of approximately 750 microns;

·; Rapid leach times - approximately 6 hours at Palacios and 12 hours at Sageras;

·; Leach temperature ambient;

·; Low reagent consumptions at Sageras of 15-20 kg/t and moderate consumption at Palacios;

·; The tests are based on a simplified extraction flow sheet, similar to the operational process steps utilized at the Quercus Plant;

·; Minimal recovery of impurities with the acid leach;

·; Reduction of environmental issues with the generation of "dry" leach residue.

 

It is important to note that these results are preliminary and leach parameters have not yet been optimized.

 

Phase 1 of the metallurgical test work is focusing on a production rate of 2.1 Mlbs (0.95 Kt) of U3O8 per annum using the Palacios and Sageras deposits as the initial feed to the Quercus Plant.

 

However, test work has also commenced on Phase 2 which is reviewing the production options ranging up to 5 Mlbs (2.3 Kt) of U3O8 per annum. Preliminary bottle roll tests for Alameda South are very encouraging with uranium extractions up to 91% and low acid consumption. These extraction levels are consistent with previously reported extractions in excess of 90% from Retortillo column leach tests in 2009.

 

Commenting on the above results, the Managing Director of Berkeley Resources Mr. Ian Stalker said:

 

"These initial non-optimized results from the Palacios and Sageras deposits are encouraging and assist in confirming the potential use of a dynamic leach process using the Quercus Plant.

 

The preliminary bottle roll results from the Alameda South samples are equally promising. This deposit, although not previously treated via the Quercus Plant, has similar mineralogy to the Palacios and Sageras mineralisation and appears likely to assist in maintaining a relatively low level of capital expenditure going forward.

 

We have now commenced detailed metallurgical test work related to Phase 2 which is based on developing both the Retortillo and Alameda South Deposits as separate feed sources of concentrate following initial on-site treatment.

 

It is not anticipated that this additional metallurgical test work will impact on plans to recommence mining operations at Salamanca, currently targeted for the end of 2012."

 

 

 

 

 

 

 

 

Enquiries - Managing Director: Ian Stalker Tel: +34 608 221 497  

RBC Capital Markets: Martin Eales Tel: +44 20 7029 7881

Introduction

 

The Salamanca Uranium Project consists of four separate areas containing a number of metasedimentary hosted uranium deposits located in the western part of the Salamanca Province in Spain. These deposits are near surface accumulations of open pittable uranium within close proximity to the Quercus uranium ore processing plant.

 

Berkeley commenced a Feasibility Study in 2009 which was initially focused on the Águila (Palacios and Sageras deposits) but has now been extended to include the Alameda (Alameda South deposit) and Retortillo (Retortillo and Santidad deposits) areas.

 

In February 2010, 2,000kg of representative samples taken from diamond drill core was sent to the SGS Metallurgical Laboratories in Perth, Australia for a comprehensive metallurgical test work campaign supervised by Aker Solutions and Orway Mineral Consultants (WA) Pty Ltd. The material was selected on the basis of lithology, oxidation and grade from the Sageras, Palacios and Alameda South deposits (Table 1).

 

Metallurgical test work sample composition- PALACIOS - SAGERAS - ALAMEDA

Deposit name

Average grade

Grade of oxidation

Hole ID's

(ppm U3O8)

partially oxidized

primary

TOTAL

%

weight (kg)

%

weight (kg)

%

weight (kg)

PALACIOS

200 - 300

199

33%

75

12%

274

45%

Holes 1-2-5-12

300 - 500

-

-

75

12%

75

12%

> 500

263

43%

-

-

263

43%

462

76%

150

24%

612

100%

SAGERAS

Holes 1-3-5

200 - 300

71

11%

149

21%

220

32%

300 - 500

190

27%

-

190

27%

> 500

141

20%

148

21%

289

41%

402

58%

297

42%

699

100%

ALAMEDA

Hole 3

200 - 300

172

27%

-

-

172

27%

300 - 500

214

33%

-

-

214

33%

> 500

257

40%

-

-

257

40%

643

100%

-

-

643

100%

1508 kg

447 kg

1954 kg

100%

Table 1 - Metallurgical Test Work Samples

 

Current Work

 

The primary objective of the Phase 1 metallurgical test work currently being undertaken at SGS is to optimise the process conditions for treating the uranium ore lithologies at Sageras and Palacios in a tank leach configuration. The results of the current work will be used for the re-commissioning of the Quercus Processing Plant at a capacity of 2.1Mlbs (0.95 Kt) of U3O8 per annum.

Phase 2 of metallurgical test work has also commenced with the objective to undertake test work on uranium ore lithologies from the satellite deposits of Alameda South and Retortillo. This additional test work is examining uranium concentration by either flotation or heap leaching and ion exchange with possible eluate or resin transfer.

 

The Phase 1 test work campaign commenced in March 2010 and is scheduled to be completed in the 3rd quarter 2010 with the following test work in progress:

·; Preliminary mineralogy on the various ore types;

·; Communition (crushing & grinding);

·; Preliminary ore sorting;

·; Flotation;

·; Tank leaching;

·; Heap leaching;

·; Thickening and filtration;

·; Solvent extraction;

·; Geotechnical and geochemical testing of the final process residues, and

·; Effluent neutralisation.

 

 

Initial Results

 

The current dynamic leach test work has delivered uranium extraction rates in excess of 93% at Palacios and 87% at Sageras. All the tests to date have used a coarse grind to the leach feed of P80 (750 microns) with the aim of minimising energy requirements in the comminution circuit.

 

The leach times to achieve these extraction rates are relatively short from 6 hours at Palacios to 12 hours at Sageras.

 

The reagent consumption is low at Sageras which consumes 15 - 20 kg of acid per tonne of ore and approximately double this at Palacios.

 

The tank leach test work completed to date has supported the conceptual flow sheet using a relatively simple acid leach process common to many existing uranium mines.

 

 

The Alameda South static heap leach test work program has commenced with a suite of bottle roll leach tests as a precursor to future column tests. The preliminary results are encouraging with extractions ranging up to 91% and acid consumptions varying between 17 and 24 kg/tonne. These tests are continuing and a comprehensive program of column leaching is planned to determine optimum leach parameters.

 

Future Work

 

Phase 1 of the tank leach test work program is expected to be completed in the 3rd quarter 2010. Future work in the Phase 1 program of test work is aimed at:

 

·; Optimising the ore sorting process.

·; Determining optimal process conditions in dynamic leaching.

·; Confirming the agitation system for a coarse grind to be employed in the leach circuit.

·; Optimising equipment selection for separating the leach residue from the uranium rich leach liquors.

·; Confirming requirements for a pre-concentration of liquors prior to solvent extraction.

Additional representative drill core is currently being selected prior to shipping to SGS for Phase 2 in order to better understand the communition and ore sorting requirements and to provide additional material for column leach and flotation test work.

 

The column leach and flotation test work will extend into 2011 with a view to identifying the optimal concentration process for the satellite deposits of Alameda South and Retortillo.

 

Preliminary engineering design will commence in June 2010 to develop the process engineering data for the study.

 

 

 

A full version of this announcement including images can be downloaded from Berkeley's website at www.berkeleyresources.com.au.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAKKXESXEEEF
Date   Source Headline
12th Dec 20177:00 amRNSFully funded Salamanca to commence construction
6th Dec 20177:00 amRNSInitial Director's Interest Notice
30th Nov 20177:24 amRNSStrategic Investment & Director Appointment
28th Nov 20177:25 amRNSChange of interests of substantial holder
28th Nov 20177:22 amRNSResult of AGM
13th Nov 20177:00 amRNSChange of Director's Interest Notice
3rd Nov 20177:00 amRNSIssue of Equity and Appendix 3B
27th Oct 20177:54 amRNSNotice of AGM
25th Oct 20177:00 amRNSQuarterly Report September 2017
29th Sep 20178:24 amRNS2017 Annual Report
13th Sep 20171:20 pmRNSChange of Interest of Substantial Holder
4th Sep 20175:17 pmRNSHolding(s) in Company
30th Aug 20174:40 pmRNSSecond Price Monitoring Extn
30th Aug 20174:35 pmRNSPrice Monitoring Extension
30th Aug 20177:04 amRNSBerkeley signs US$120 million strategic investment
24th Jul 20177:00 amRNSQuarterly Report June 2017
12th Jul 20177:00 amRNSPrimary crusher delivered to site
7th Jul 201711:57 amRNSNotice - Change of Interests of Substantial Holder
6th Jul 20177:00 amRNSSalamanca Capital costs reduced by 1% to EUR 82.3M
4th Jul 20175:04 pmRNSHolding(s) in Company
16th Jun 20179:32 amRNSInitial Director's Interest Notice
12th Jun 20177:00 amRNSCo-Founder of Majedie appointed as a Director
9th Jun 20177:02 amRNSInitial Director's Interest Notice
9th Jun 20177:00 amRNSFinal Director's Interest Notice
7th Jun 20177:00 amRNSFormer senior Rio Tinto executive appointed
5th Jun 20177:00 amRNSExploration Programme Targeting Zona 7 Deposits
26th May 20178:35 amRNSIssue of Shares and Appendix 3B
28th Apr 20177:00 amRNSMarch 2017 Quarterly Report
24th Apr 20177:00 amRNSPre-construction activities advancing at Salamanca
21st Mar 20177:00 amRNSHolding(s) in Company
21st Mar 20177:00 amRNSEU approval of Salamanca mine offtake contract
20th Mar 20174:05 pmRNSHolding(s) in Company
17th Mar 20177:00 amRNSHigh grade intercepts at Zona 7 & Exploration JV
15th Mar 20177:00 amRNSHalf-year Report
20th Feb 20179:34 amRNSHolding(s) in Company
8th Feb 201710:35 amRNSHolding(s) in Company
7th Feb 20177:00 amRNSDirector/PDMR Shareholding
31st Jan 20177:00 amRNSDecember 2016 Quarterly Report
23rd Dec 20167:00 amRNSIssue of shares and Appendix 3B
20th Dec 20163:58 pmRNSHolding(s) in Company
20th Dec 20167:00 amRNSBerkeley takes another step towards construction
19th Dec 20165:43 pmRNSHolding(s) in Company
16th Dec 20167:00 amRNSAppendix 3B
14th Dec 20167:00 amRNSResult of Meeting
6th Dec 20167:00 amRNSMajor land acquisition completed at Salamanca mine
28th Nov 20167:00 amRNSOfftake Agreement Concluded with Interalloys
22nd Nov 20168:27 amRNSResult of AGM
14th Nov 20163:58 pmRNSHolding(s) in Company
14th Nov 20167:00 amRNSNotice of General Meeting
11th Nov 20167:00 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.