If you would like to ask our webinar guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund a question please submit them here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Eng Regulatory News (BKY)

Share Price Information for Berkeley Eng (BKY)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 18.50
Bid: 17.50
Ask: 19.50
Change: -0.30 (-1.60%)
Spread: 2.00 (11.429%)
Open: 18.50
High: 18.50
Low: 18.50
Prev. Close: 18.80
BKY Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

High grade intercepts at Zona 7 & Exploration JV

17 Mar 2017 07:00

RNS Number : 7468Z
Berkeley Energia Limited
17 March 2017
 

 

BERKELEY ENERGIA LIMITED

NEWS RELEASE | 17 March 2017 | AIM/ASX: BKY

 

Further high grade intercepts below Zona 7

Exploration Joint Venture Discussions

 

Berkeley Energia announces additional high grade intersections below the Zona 7 deposit at its 100% owned Salamanca mine in Western Spain.

Results from the final holes drilled in the current programme through the near-surface Zona 7 deposit to a maximum depth of 271 metres have reported grades consistent with, or higher than, the average grade of the Zona 7 resource.

 

Outstanding intercepts include:

· 12 metres @ 1,003 ppm U3O8

incl. 1 metre @ 2,464 ppm U3O8

· 2 metres @ 2,002 ppm U3O8

incl. 1 metre @ 3,761 ppm U3O8

· 2 metres @ 1,357 ppm U3O8

 

This latest drilling supports the results from holes drilled over the past year in which high grade intersections up to 14 metres @ 4,481 ppm U3O8 were reported.

 

These results further demonstrate continuity of mineralisation beneath the current defined resource and potential for it to increase.

 

The Company will conduct additional drilling and resource estimation work at Zona 7 aimed at increasing the mineral resource estimate and unlocking further value in this exceptional deposit.

 

Exploration activity will focus on discovering mineralisation similar to the Zona 7 deposit which is located close to surface and without a strong radiometric anomaly present. Drill targets will be identified using a combination of techniques including ionic leach, ground geochemistry, radon emission and detailed structural mapping.

 

Exploration Joint Venture

 

The orebodies currently being developed cover just 7% of the Company's 1,160km² landholding within a highly prospective uranium region which remains largely underexplored.

 

Given the Company's current focus on the construction of the mine, discussions have commenced with strategic partners to fund an exploration joint venture designed to delineate additional resources to extend the mine life or expand production.

 

The partners would be expected to bring extensive multi commodity exploration experience and the very latest expertise that could be applied to the large body of structural and mineralising events at the project.

 

The exploration joint venture would cover only Berkeley's exploration tenements and would not affect ownership of deposits currently within the mine plan.

 

The Company will make an announcement if an agreement is executed. Alternatively, the Company will continue to pursue its own exploration activities aimed at extending the mine life or expanding production.

 

Managing Director Paul Atherley commented:

 

"These high grade intercepts immediately below Zona 7 are extremely encouraging and point to a potential resource upgrade, indicating that there could be still more upside to come from the Salamanca mine.

 

Given the transformational effect the shallow, high grade Zona 7 deposit has had on the project's economics we have designed the current exploration programme to look for more of the same, with a broader array of exploration techniques.

 

We are also excited about the potential to introduce an exploration joint venture partner who can draw on significant technical and financial resources and work with us to unlock the full potential of our 1,160km² landholding within this heavily mineralised province."

 

 

For further information please contact:

Berkeley Energia Limited

+44 20 7478 3900

Paul Atherley, Managing Director

info@berkeleyenergia.com

Hugo Schumann, Corporate Manager

Peel Hunt LLP (Joint Broker)

+44 20 7418 8900

Matthew Armitt

Ross Allister

Chris Burrows

WH Ireland Limited (Nominated Adviser)

+44 20 7220 1666

Paul Shackleton

Nick Prowting

Jay Ashfield

Buchanan

+44 207 466 5000

Bobby Morse, Senior Partner

BKY@buchanan.uk.com

Anna Michniewicz, Account Director

 

Appendix A: Detailed Results

Drill Programme

During 2016 the Company completed a detailed exploration programme aimed at maintaining annual production at the Salamanca mine at over 4 million pounds a year on an ongoing basis. The programme was designed primarily to test for mineralisation beneath and to the south of Zona 7 ("Zona 7 deeps programme"), as well as to test a number of targets located within a ten kilometre radius of the planned Retortillo plant ("regional targets programme").

 

The overall 2016 exploration campaign comprised 87 reverse circulation ("RC") drill holes, five diamond drill holes ("DDH") and two mixed (started in RC and finished in DDH) drill holes, for 8,200 metres.

The Zona 7 deeps programme included 17 holes. Initial results from the first three holes were reported on 27 January 2016 and a further set of four holes reported on 5 September 2016.

The regional targets programme included 80 holes and were drilled where radiometric anomalies were present. The majority of holes drilled were spaced 50 metres apart along each section, with 400 metres spacing between sections.

Analytical data has now been received from all holes completed during the 2016 Zona 7 deeps programme and the results are presented herein.

Results

 

The holes reported from the Zona 7 deeps programme were drilled through the near-surface Zona 7 deposit and extended to a maximum depth of 271 metres. The assay results confirm the presence of high grade mineralisation below Zona 7.

Significant high grade intersections have been recorded near surface at Zona 7 and at depth (from 3 metres to a maximum depth of 256 metres), with thicknesses up to 48 metres. Selected intercepts from the full Zona 7 deeps programme include:

 

Hole No.

Down Hole Intercept

From Depth

(Down Hole)

Z7R-346(**)

48m @ 1,018 ppm U3O8

1m @ 1,444 ppm U3O8

3m

195m

Z7R-347(**)

19m @ 1,753 ppm U3O8

10m @ 719 ppm U3O8

2m @ 944 ppm U3O8

11m @ 1,105 ppm U3O8

11m

61m

124m

130m

Z7R-348(**)

6m @ 3,247 ppm U3O8

4m @ 1,598 ppm U3O8

14m @ 4,481 ppm U3O8

7m @ 1,438 ppm U3O8

60m

81m

193m

210m

Z7R-357(***)

10m @ 635 ppm U3O8

incl. 1m @ 2,246 ppm U3O8

26m @ 1,103 ppm U3O8

incl. 4m @ 3,973 ppm U3O8

2m @ 461 ppm U3O8

1m @ 762 ppm U3O8

30m

39m

43m

43m

248m

254m

Z7R-358(*)(***)

5m @ 526 ppm U3O8

48m

Z7R-359(*)(***)

10m @ 494 ppm U3O8

47m

Z7R-360(***)

14m @ 597 ppm U3O8

6m @ 457 ppm U3O8

4m @ 639 ppm U3O8

17m @ 563 ppm U3O8

incl. 2m @ 1,160 ppm U3O8

6m @ 480 ppm U3O8

14m @ 1,776 ppm U3O8

incl. 8m @ 2,644 ppm U3O8

12m

29m

39m

63m

66m

113m

207m

212m

Z7M-376

12m @ 1,003 ppm U3O8

10m

incl. 1m @ 2,464ppm U3O8

16m

Z7D-379

2m @ 2,002 ppm U3O8

incl. 1m @ 3,761 ppm U3O8

2m @ 1,357 ppm U3O8

161m

162m

254m

(*) Drill holes failed to reach the target depth due to difficult ground conditions and were terminated

(**) Drill holes reported on 27 January 2016

(***) Drill holes reported on 5 September 2016

Note: Sampling and analysis for drill holes Z7M-195, Z7D-377, Z7D-378, Z7D-379, Z7D-380 and Z7D-381 was focussed on the potential zones of mineralisation below the existing Zona 7 resource. The mineralised zones within the existing resource were not sampled or assayed.

All significant intersections from completed holes from the Zona 7 deeps programme and all intercepts above 200 ppm from the regional targets programme, along with the details of the collar position, drill hole orientation and depth, are summarised in Appendix B.

Planned future exploration activity will be aimed at making new discoveries similar to the Zona 7 deposit which was discovered close to surface and without strong radiometric anomalism present over the bulk of the deposit. New drill targets will be identified using a combination of techniques including ionic leach, ground geochemistry, radon emission and detailed structural mapping.

Geological Setting

Zona 7 is a vein type deposit hosted in a sequence of fine grained metasediments which are overlain by a conglomerate unit and adjacent to a granite intrusive. The mineralised envelope is generally sub-horizontal and the mineralisation is contained within a stockwork of veins. The uranium mineralisation occurs both within the partially weathered zone and fresh rock. In the southern extension the Cenozoic cover ranges between 1 metre and 12 metres.

To view a full version of this announcement including all figures and illustration, please refer to the Company's website at www.berkeleyenergia.com 

 

Competent Persons Statement

The information in this announcement that relates to the Exploration Results for Zona 7 deeps and the regional targets is based on, and fairly represents, information compiled by Mr Malcom Titley, a Competent Person who is a member of the Australasian Institute of Mining and Metallurgy. Mr Titley is employed by Maja Mining Limited, an independent consulting company. Mr Titley has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Titley consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this announcement that relates to the Mineral Resources is extracted from the announcement entitled 'Study confirms the Salamanca project as one of the world's lowest cost uranium producers' dated 14 July 2016, which is available to view on Berkeley Energia Limited's (Berkeley) website at www.berkeleyenergia.com.

Berkeley confirms that: a) it is not aware of any new information or data that materially affects the information included in the original announcement; b) all material assumptions and technical parameters underpinning the Mineral Resources, included in the original announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons' findings are presented in this announcement have not been materially modified from the original announcements.

The information in the original announcement that relates to the Mineral Resources is based on, and fairly represents, information compiled or reviewed by Mr Malcolm Titley, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Titley is employed by Maja Mining Limited, an independent consulting company. Mr Titley has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'.

Forward Looking Statement

Statements regarding plans with respect to Berkeley's mineral properties are forward-looking statements. There can be no assurance that Berkeley's plans for development of its mineral properties will proceed as currently expected. There can also be no assurance that Berkeley will be able to confirm the presence of additional mineral deposits, that any mineralisation will prove to be economic or that a mine will successfully be developed on any of Berkeley's mineral properties.

 

Appendix B

Summary of RC and DDH Drill Intersections- Zona 7 Deeps Programme

(200 ppm U3O8 cut-off)

 

Drill Hole ID

Easting

(m)

Northing

(m)

Elevation

(m)

Azimuth

(o)

Dip

(o)

Depth

(m)

From

(m)

To

(m)

Interval

(m)

U3O8 (ppm)

Z7R-346(**)

714017

4527638

750

360

-90

220

 

3

51

48

1,018

incl.

4

14

10

1,025

incl.

16

25

9

1,969

incl.

27

29

2

2,429

incl.

38

39

1

3,891

incl.

43

45

2

1,166

 

159

162

3

393

 

195

196

1

1,444

 

202

203

1

233

 

217

218

1

210

Z7R-347(**)

713895

4527458

755

360

-90

220

 

11

30

19

1,753

incl.

11

16

5

1,351

incl.

26

28

2

10,452

 

34

35

1

281

 

38

40

2

443

 

45

56

11

511

incl.

47

48

1

1,061

 

61

71

10

719

incl.

61

63

2

1,925

 

75

78

3

744

incl.

77

78

1

1,527

 

84

86

2

842

incl.

84

85

1

1,368

 

91

96

5

254

 

112

118

6

466

 

124

126

2

944

incl.

125

126

1

1,191

 

130

141

11

1,105

incl.

130

132

2

4,109

 

159

165

6

245

 

169

174

5

435

 

177

178

1

476

 

190

191

1

380

 

199

200

1

233

Z7R-348(**)

713944

4527090

765

360

-90

220

 

43

44

1

1,197

 

60

66

6

3,274

incl.

60

65

5

3,769

 

81

85

4

1,598

incl.

81

83

2

2,753

 

185

186

1

531

 

193

207

14

4,481

incl.

194

199

5

11,913

 

210

217

7

1,438

incl.

211

216

5

1,894

Z7R-357(*)(***)

713955

4527376

755

360

-90

271

30

40

10

635

incl.

39

40

1

2,246

43

69

26

1,103

incl.

43

47

4

3,973

incl.

56

57

1

1,256

incl.

65

66

1

4,928

88

89

1

264

248

250

2

461

254

255

1

762

Z7R-358(*)(***)

714044

4527330

764

360

-90

97

38

40

2

539

48

53

5

526

61

62

1

266

Z7R-359(*)(***)

714055

4527281

766

360

-90

99

32

34

2

262

39

41

2

312

47

57

10

494

incl.

49

50

1

1,154

91

92

1

433

Z7R-360(***)

713860

4527196

755

360

-90

251

12

26

14

597

incl.

17

19

2

1,204

incl.

24

25

1

1,117

29

35

6

457

incl.

32

33

1

1,214

39

43

4

639

incl.

42

43

1

1,486

63

80

17

563

incl.

66

68

2

1,160

incl.

70

71

1

1,615

83

92

9

200

113

119

6

480

incl.

116

117

1

1,262

128

130

2

431

136

138

2

323

141

143

2

924

incl.

142

143

1

1,385

157

158

1

381

207

221

14

1,776

incl.

207

210

3

1,004

incl.

212

220

8

2,644

Z7R-361

714004

4527216

766

360

-90

250

30

31

1

274

42

43

1

219

48

49

1

243

52

58

6

215

Z7R-367

713807

4527019

759

360

-90

250

No Significant Intercept

Z7R-375

713690

4527056

762

360

-90

250

 

47

48

1

215

Z7M-376

714063

4527495

756

360

-90

250

 

10

22

12

1,003

incl.

10

14

4

1,445

incl.

16

17

1

2,464

26

33

7

337

39

40

1

304

 

57

61

4

236

Z7D-377

714051

4527303

765

310

-86

263

No Significant Intercept

Z7D-378

713904

4526989

763

295

-86

250

No Significant Intercept

Z7M-195

713908

4527288

755

360

-90

250

No Significant Intercept

Z7D-379

713823

4527331

753

124

-86

265

161

163

2

2,002

incl.

162

163

1

3,761

212

213

1

323

220

225

5

242

229

231

2

464

249

250

1

230

254

256

2

1,357

Z7D-380

713966

4527628

750

126

-86

128

No Significant Intercept

Z7D-381

714237

4527336

768

306

-86

250

No Significant Intercept

(*) drill holes failed to reach the target depth due to difficult ground conditions and were terminated

(**) Drill holes reported on 27 January 2016

(***) Drill holes reported on 5 September 2016

Note: Sampling and analysis for drill holes Z7M-195, Z7D-377, Z7D-378, Z7D-379, Z7D-380 and Z7D-381 was focussed on the potential zones of mineralisation below the existing Zona 7 resource. The mineralised zones within the existing resource were not sampled or assayed.

 

Summary of RC and DDH Drill Intersections- Regional Targets Programme

(200 ppm U3O8 cut-off)

 

Drill Hole ID

Easting

Northing

Elevation

Azimuth

Dip

Depth

From

To

Interval

U3O8 ppm

(m)

(m)

(m)

(o)

(o)

(m)

(m)

(m)

(m)

Z7R-356

713693

4526666

776

360

-90

85

78

79

1

215

VIR-068

718141

4528674

742

360

-90

80

18

19

1

950

26

27

1

236

31

32

1

237

VIR-077

718429

4528365

732

360

-90

60

31

32

1

233

VIR-078

718914

4528442

754

360

-90

60

47

48

1

266

VIR-081

719120

4527936

728

360

-90

58

39

40

1

460

VIR-083

719147

4527985

734

360

-90

80

33

34

1

1,297

38

40

2

245

ERR-005

716948

4531233

729

360

-90

80

18

19

1

205

22

23

1

465

34

35

1

685

 

Appendix C: JORC Code, 2012 Edition - Table 1 report

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria

JORC Code explanation

Commentary

Sampling techniques

Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.

Results reported are from Reverse Circulation (RC) and Diamond (DD) drill samples collected over one metre (1m) intervals. Multiple methods were used to determine uranium mineralisation intervals including down hole gamma analysis, hand held scintillometer measurements and portable XRF analysis. Intervals containing uranium mineralisation were selected and submitted for laboratory assay analysis.

Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

Standards and blanks are inserted into the sample stream to assess the accuracy, precision and methodology of the external laboratories used. In addition, field duplicate samples are inserted to assess the variability of the uranium mineralisation. Approximately 15-20% of all samples relate to quality control. In addition, the laboratories undertake their own duplicate sampling as part of their internal QA/QC processes. Examination of the QA/QC sample data indicates satisfactory performance of field sampling protocols and assay laboratories providing acceptable levels of precision and accuracy.

 

Drill hole collar locations are surveyed by qualified surveyors (Cubica Ingeniería Metrica S.L) using standard differential GPS (DGPS) equipment achieving sub decimetre accuracy in horizontal and vertical position. Down-hole surveys are undertaken using a Geovista down-hole deviation probe. Measurements are taken every 1cm down hole and averaged every 5m. No strongly magnetic rocks are present within the deposit which may affect magnetic based readings.

Aspects of the determination of mineralisation that are Material to the Public Report. In cases where 'industry standard' work has been done this would be relatively simple (eg 'reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.

RC drill samples are collected over 1m intervals, manually homogenised before being split on site using a three tier riffle splitter to provide an approximate 3-5kg sample. In rare cases, wet samples are split using a cone and quarter method. Samples are further split in the core shed using a scoop such that 0.7-1kg

 

Berkeley DD core was sampled using 1m intervals in the mineralised zones and half core was used for sampling.

 

Scintillometer measurements are taken on all samples and this data is used to select the samples to be sent to external laboratories for sample preparation and analysis. Indicative mineralised intervals are determined from this data and the sampling extended up and down hole by at least 2-5m.

 

Samples are sent to the preparation laboratories of ALS (Seville, Spain) and analytical laboratory of ALS (Loughrea, Ireland). Samples are dried, fine crushed down to 70% below 2mm, split to obtain 250g and pulverised with at least 85% of the sample passing 75µm. 10g of sample is used for uranium analysis by pressed powder X-ray fluorescence (XRF) method.

 

Drilling techniques

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc).

Drilling comprised both RC method using a 140mm diameter face sampling hammer and DD (HQ).

For angled DD, oriented core was achieved using DeviCore measurements.

Drill sample recovery

Method of recording and assessing core and chip sample recoveries and results assessed.

 

RC drill samples are collected over 1m intervals through a cyclone. Plastic sample bags are strapped to the cyclone to maximise sample recovery. Individual sample bags are not weighed to assess sample recovery but a visual inspection is made by the Company geologist to ensure all samples are of approximately equivalent size.

DD core is placed in core boxes of 1m by 0.3m size. Each drilling cycle is marked indicating its depth. The recovery is measured by cycle and then recovery percentage is calculated.

Measures taken to maximise sample recovery and ensure representative nature of the samples.

The RC drilling rigs utilised suitably sized compressors to ensure dry samples where possible. Plastic sample bags are strapped to the cyclone to maximise sample recovery. Sample logs record whether the sample is dry, moist or wet.

The DD drilling rigs used face discharge bits to ensure a low contact between the rock and drilling fluids, minimising ore washing. Core was cut using a water lubricated diamond saw with care taken to ensure minimal ore loss.

Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

There is no known relationship between sample recovery and grade. The RC sample recoveries are of an acceptable level and no bias is expected from any sample losses.

 

Due to potential solubility and mobility of the uranium minerals, the use of water in core recovery in DD is controlled.  

Logging

Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

Geological logging of RC chip samples includes recording descriptions of lithology, weathering, alteration and mineralisation. A scintillometer reading of counts per second (cps) is recorded for each 1m sample (quantitative).

 

Geological logging of DD core included recording descriptions of lithology, geological period, colour, oxidation, mineralisation style, alteration, weathering, structure, texture, grain size and mineralogy.

 

Geotechnical logging of DD core included recording descriptions of integrity (recovery and RQD), materials (lithology, rock strength and depth oxide staining), structures (type, angle, contact type, infill, weathering)

 

Structural logging of DD core included recording descriptions of structure type, structural angles, contact type, infill, line type and slip direction.

 

Alteration logging of DD core included recording descriptions of metamorphic textures, alteration mineralogy and mineralisation style.

 

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

Geological logging is qualitative in nature. RC samples and chip trays and DD core boxes are photographed.

The total length and percentage of the relevant intersections logged.

All RC drill holes and DD holes are logged in full by Company geologists.

Sub-sampling techniques

If core, whether cut or sawn and whether quarter, half or all core taken.

DD core is sampled using 1m intervals in the mineralised zones, including areas of internal low grade or waste. In addition, the sampling is extended 3-5m up and down hole from the interpreted mineralised zone. Half core is used for sampling.

 

and sample preparation

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

RC drill samples are collected at 1m intervals. RC intervals are sampled by splitting dry samples in the field to 3-5kg using a three tier riffle splitter and further split in the core shed to 0.7-1kg using a scoop. Where samples are wet they are dried prior to spitting. In rare cases, wet samples are split using a cone and quarter method.

For all sample types, the nature, quality and appropriateness of the sample preparation technique.

Samples are sent to ALS laboratories for preparation. Samples are dried, fine crushed down to 70% below 2mm and pulverised with at least 85% of the sample passing 75µm. 10g of sample is used for uranium analysis by pressed powder XRF method. This is considered appropriate for this style of uranium mineralisation.

Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

Previous field tests have determined that the sample size and method of sampling produce representative RC samples. QA/QC procedures involve the use of standards, duplicates and blanks which are inserted into sample batches at a frequency of approximately 15-20%.

Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

Duplicate splits of RC samples are taken every 10m down hole within the sampled intervals. Duplicate DD samples are taken every 10m sampling the other half portion of core. The results from these duplicates generally show acceptable repeatability.

 

Whether sample sizes are appropriate to the grain size of the material being sampled.

The uranium is typically very fine grained. Previous test work carried out by Berkeley using different sample sizes has demonstrated that the selected sample size is appropriate.

Quality of assay data and laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.

Uranium analysis by pressed powder XRF method. This analytical method reports total uranium content.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

Down-hole gamma logging is undertaken for all probe accessible drill holes to provide eU3O8 ("equivalent" U3O8 grade) data however, it is not currently considered of sufficient quality to replace chemical assay data for the purposes of reporting drilling results at Zona 7. The drill intersections reported in this release are calculated using only chemical assay data.

Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established.

Standards, blanks and duplicates are regularly inserted into the sample stream with approximately 15-20% of all samples related to quality control. The external laboratories used also maintain their own process of QA/QC utilising standards, pulp repeats, sample duplicates and blanks.

 

Review of the Berkeley quality control samples, as well as the external laboratory quality QA/QC reports, has shown no sample preparation issues, acceptable levels of accuracy and precision and no bias in the analytical datasets.

Verification of sampling and assaying

The verification of significant intersections by either independent or alternative company personnel.

 

Reported significant intersections have been checked and verified by Senior Geological management.

The use of twinned holes.

No twinned holes were drilled in the current drilling program.

Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols.

All primary data is recorded in templates designed by Berkeley. Assay data from the external laboratory is received in spreadsheets and downloaded directly into an Access Database managed by the Company. Data is entered into controlled excel templates for validation. The validated data is then loaded into a password secured relational database by a designated Company geologist. Daily backups of all digital data are undertaken. These procedures are documented in the Berkeley Technical Procedures and Protocols manual.

Discuss any adjustment to assay data.

Uranium (ppm) assays received from the external laboratory are converted to U3O8 (ppm) using the stoichiometric factor of 1.179.

Location of data points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.

Drill hole collar locations are surveyed by qualified surveyors (Cubica Ingeniería Metrica S.L) using standard differential GPS (DGPS) equipment achieving sub decimetre accuracy in horizontal and vertical position.

 

Down-hole surveys are undertaken using a Geovista down-hole deviation probe. Measurements are taken every 1cm down hole and averaged every 10m. No strongly magnetic rocks are present within the deposit which may affect magnetic based readings.

Specification of the grid system used.

The grid system is ETRS 1989 UTM Zone 29N.

Quality and adequacy of topographic control.

Topographic control is based on a digital terrain model with sub metric accuracy sourced from the Spanish Geographical Institute (Instituto Geográfico Nacional) and is verified through detailed drill hole collar surveys by a qualified surveyor using a DGPS.

Data spacing and distribution

Data spacing for reporting of Exploration Results.

This drilling program has been designed to cross significant mineralization.

Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.

The data spacing is not considered sufficient to assume geological and grade continuity, and will not allow the estimation of Mineral Resources on deep.

 

Whether sample compositing has been applied.

No compositing of samples in the field has been undertaken.

Orientation of data in relation to geological structure

Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.

Shallow parts of the deposit show that the mineralised zone strikes northeast-southwest and is interpreted to be sub-horizontal (due to post mineralisation supergene processes) to shallowly dipping.

If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.

All of the RC drill holes reported in this release are vertical.

All of the DD holes are inclined -86º to facilitate the core orientation measures. Due to the interpreted flat lying nature of the mineralisation, no sampling bias is considered to have been introduced by the orientation of the drilling.

Sample security

The measures taken to ensure sample security.

Chain of custody is managed by Berkeley. Samples are transported from the drill site by Company vehicle to a sample preparation shed where samples are prepared for dispatch. Samples are sent directly from the sample preparation shed to the laboratory using a certified courier or a Berkeley owned vehicle authorised for radioactive materials transport. No other freight is transported with the samples which are taken directly from the Berkeley facility to the external laboratory. Sample submission forms are sent in paper form with the samples as well as electronically to the laboratory. Reconciliation of samples occurs prior to commencement of sample preparation for assaying.

Audits or reviews

The results of any audits or reviews of sampling techniques and data.

Sampling techniques and procedures, as well as QA/QC data, are reviewed internally an ongoing basis. Mr Malcolm Titley (Geology Consultant, Maja Mining Limited) has independently reviewed the sampling techniques, procedures and data. He has undertaken a site visit to review and inspect the application of procedures. These reviews have concluded that the sampling and analytical results have resulted in data suitable for incorporation into Mineral Resource estimation.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria

JORC Code explanation

Commentary

Mineral tenement and land tenure status

Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.

The Zona 7 Prospect lies on the Alisos Investigation Permit PI 6605-20 which is 100% owned by Berkeley Minera de Espana, a wholly owned subsidiary of Berkeley Energia Limited.

 

An application for a mining license has been applied for at Alisos. The Alisos Investigation Permit, which was due to expire in January 2016, has been automatically extended until the mining license is granted.

 

No historical sites, wilderness or national parks are located within the Permit. The Zona 7 Prospect is located adjacent to the village of Villavieja de Yeltes.

The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.

Tenure in the form of an Investigation Permit has been granted and is considered secure. There are no known impediments to obtaining a licence to operate in this area.

Exploration done by other parties

Acknowledgment and appraisal of exploration by other parties.

Previous exploration at Zona 7 was completed initially by Junta de Energía Nuclear (JEN) and then Empresa Nacional de Uranio S.A. (ENUSA), both Spanish state run companies, from the late 1950's through to the mid 1980's. Work completed by JEN and ENUSA included mapping, radiometric surveys, trenching and diamond (DD) and open-hole (OH) drilling.

 

A detailed data assessment and verification of the historic data supplied by ENUSA has been undertaken. No significant issues with the data were detected.

Geology

Deposit type, geological setting and style of mineralisation.

The uranium mineralisation is hosted within Lower Cambrian metasediments adjacent to granite. The mineralisation typically occurs as a sub-horizontal to shallowly dipping layer occurring between surface and 100m depth, although mineralisation has been recorded to a maximum depth of 255m in the current RC holes. The style of the uranium mineralisation includes veins, stockwork and disseminated mineralisation in joint/fracture filling associated with brittle deformation. Uraninite and coffinite are the primary uranium minerals. Secondary uranium mineralisation is developed in "supergene-like" tabular zones corresponding to the depth of weathering. Most of the mineralisation is hosted within partially weathered and unweathered metasediment. This deposit falls into the category defined by the International Atomic Energy Association (IAEA) as Vein Type, Sub Type Iberian Type.

Drill hole Information

A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:

o easting and northing of the drill hole collar

o elevation or RL (Reduced Level - elevation above sea level in metres) of the drill hole collar

o dip and azimuth of the hole

o down hole length and interception depth

o hole length.

Details of all reported drill holes are provided in Appendix B of this release.

 

 

If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case.

All of this information is Material and has been included in Appendix B of this release.

 

Data aggregation methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated.

Reported drill intersections are based on chemical assay data and are calculated using a 200ppm U3O8 cut-off, no high grade cut, and may include up to 2m of internal dilution.

 

Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.

High grade intervals that are internal to broader zones of uranium mineralisation are reported as included intervals.

The assumptions used for any reporting of metal equivalent values should be clearly stated.

No metal equivalent values are used.

Relationship between mineralisation widths and intercept lengths

These relationships are particularly important in the reporting of Exploration Results. If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported.

All drilling is planned in such a way as to intersect expected mineralisation in a perpendicular manner. The uranium mineralisation is interpreted to be flat lying to shallowly dipping so the majority of the RC holes have been drilled vertically and DD holes have been drilled with -86º for core orientation purposes. The reported down-hole intervals are therefore interpreted to approximate true widths.

If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg 'down hole length, true width not known').

The reported down-hole intervals are interpreted to approximate true widths.

Diagrams

Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.

Appropriate diagrams, including a drill plan and cross sections, are included in the main body of this release.

Balanced reporting

Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.

All results are reported in Appendix B of this release.

Other substantive exploration data

Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples - size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.

Down-hole gamma logging of all holes is undertaken to provide eU3O8 data. Prior comparisons of eU3O8 data with chemical assay data have shown that on average eU3O8 tends to underestimate at higher grades (>600ppm) and overestimate at lower grades (

Further work

The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling).

 

Further work planned for the Zona 7 Prospect includes additional drilling will be focused on extending the mineralisation further deep and infilling the current grid to facilitate future upgrading of the resource classification.

 

Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.

These are shown in the main body of this release.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDLLFVDVIIRLID
Date   Source Headline
26th Apr 20247:00 amRNSBoard Changes
26th Apr 20247:00 amRNSQuarterly Report March 2024
10th Apr 20247:32 amRNSCommencement of Arbitration against Spain
13th Mar 20247:05 amRNSHalf-Year Accounts
30th Jan 20247:00 amRNSQuarterly Report December 2023
2nd Jan 20247:00 amRNSExpiry of Unlisted Options
27th Dec 20237:00 amRNSPermitting update
21st Dec 20237:00 amRNSReport on Payments to Govts
21st Nov 20237:00 amRNSResult of AGM
30th Oct 20237:00 amRNSSeptember 2023 Quarterly
11th Oct 20237:00 amRNSNotice of AGM
22nd Sep 20237:00 amRNSDate of Annual General Meeting
30th Aug 20237:00 amRNS2023 Annual Report
26th Jul 20237:57 amRNSIssue of Unlisted Options
24th Jul 20237:00 amRNSQuarterly Report June 2023
19th Jul 20237:00 amRNSResults of Meeting
19th Jun 20237:00 amRNSNotice of General Meeting
31st May 20237:00 amRNSExpiry of Unlisted Options
28th Apr 20237:00 amRNSQuarterly Report March 2023
3rd Apr 202312:12 pmRNSPermitting Update
14th Mar 20237:00 amRNSHalf-year Report
7th Feb 20234:40 pmRNSSecond Price Monitoring Extn
7th Feb 20234:35 pmRNSPrice Monitoring Extension
7th Feb 20231:12 pmRNSPermitting Update
31st Jan 20237:00 amRNSQuarterly Report December 2022
26th Jan 20234:40 pmRNSSecond Price Monitoring Extn
26th Jan 20234:35 pmRNSPrice Monitoring Extension
3rd Jan 20237:00 amRNSExpiry of Unlisted Options
22nd Dec 20227:00 amRNSReport on Payments to Governments
1st Dec 20227:00 amRNSUnlisted Options
18th Nov 20227:00 amRNSNotification of Investment Dispute
15th Nov 20227:00 amRNSResult of AGM
9th Nov 20227:00 amRNSBerkeley establishes Spanish Advisory Committee
27th Oct 20227:00 amRNSQuarterly Report September 2022
20th Oct 20222:13 pmRNSPublication of a Prospectus
4th Oct 20227:00 amRNSNotice of AGM
23rd Sep 20224:35 pmRNSPrice Monitoring Extension
19th Sep 20227:45 amRNSDate of AGM
31st Aug 202210:00 amRNS2022 Annual Report
29th Jul 20227:00 amRNSQuarterly Report June 2022
5th Jul 20227:00 amRNSChange of Director’s Interest Notice
28th Jun 20227:00 amRNSStrengthening of Board with Spanish Based Director
29th Apr 20227:00 amRNSQuarterly Report March 2022
29th Apr 20227:00 amRNSQuarterly Report March 2022
5th Apr 20228:46 amRNSNotice of Initial Substantial Holder
5th Apr 20227:00 amRNSNotice of Initial Substantial Holder
1st Apr 20227:00 amRNSSettlement of OIA Claim
24th Mar 20224:36 pmRNSPrice Monitoring Extension
24th Mar 20222:00 pmRNSPrice Monitoring Extension
24th Mar 202211:05 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.