Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Eng Regulatory News (BKY)

Share Price Information for Berkeley Eng (BKY)

Share Price is delayed by 15 minutes
Get Live Data
24.70    0.00 (0.00%)
Bid:
24.00
Ask:
25.40
Spread: 1.40 (5.833%)
Market Cap: £110.23m
BKY Live PriceLast checked at - London Stock Exchange

Intraday Berkeley Eng Share Chart

Drilling Report

15 Jan 2007 08:21

Berkeley Resources Limited15 January 2007 15 January 2007 FIRST DRILL HOLE CONFIRMS RETORTILLO MINERALISATION Including 13.8m grading 0.216% U3O8 from 19.4m The Directors of Berkeley Resources Limited (AIM: BKY.L) are pleased to advisethe results of the first confirmatory drill hole at the Company's Retortillodeposit in Salamanca Province, Spain. Vertical diamond core hole RTO-001 is located within the best area ofmineralisation, approximately equidistant from four diamond holes drilled byprevious explorers on a 50m x50m grid. It was completed to a depth of 97mimmediately prior to the Christmas/New Year break. Assay results include the following intersections at a 0.02% U3O8 cut-off: 19.4m to 33.2m - 13.8m @ 0.216% U3O8 46.8m to 52.0m - 5.2m @ 0.073% U3O8 67.0m to 73.0m - 6.0m @ 0.095% U3O8 These results are an encouraging start to the validation of previous diamond andRC drilling of the deposit and appear to better those from the surrounding fourholes. However, they should not be considered representative of mineralisationthroughout the deposit. SUBSTANTIAL FURTHER DRILLING IS REQUIRED TO TEST THE EXTENT, CONTINUITY ANDTENOR OF MINERALISATION, AND THE DIRECTORS STRONGLY ADVISE CAUTION ININTERPRETING THESE INITIAL RESULTS. A drill plan follows setting out the location of hole RTO-001, as well asmineralised and non-mineralised diamond and RC holes from previous explorationat Retortillo. Hole details include: β€’ Collar Coordinates: 719318mE, 4520538mN 743mRL (UTM 29N ED50 datum) β€’ Inclination: -90degrees β€’ Final Depth: 97.0m β€’ Water Table: 20.3m The hole was geologically and radiometrically logged before being sampled (1/4core) at approximately 1m intervals (intervals varying from 0.5 to 1.5m based ongeology) for the zone between 1.6m and 97m downhole. Duplicate 1/4 core samplesand blank samples were included in the samples which were assayed for totaluranium by the Delayed Neutron Count (DNC) method at Activation LaboratoriesLimited in Ontario, Canada. Measured recoveries were good and averaged 92% over the entire hole. The geology consisted of: 0.00 - 1.60m Tertiary cover 1.60 - 16.60m Strongly weathered shales 16.60 - 39.80m Weathered grey shales with FeOx throughout + py from 24.6m. Visible torbenite, meta-autinite, pitchblende on fractures 39.80 - 62.00m Grey-black sheared (sericite) shales with disseminated and vein pyrite - fault at 52.0 - 53.7m 62.00 - 67.00 Late fractured grey-black shales as above 67.00 - 88.00m Competent shales with quartz-chlorite +/- pyrite 88.00 - 97.00m As above with late fractures and talc on fractures The mineralisation appears to be associated with current and past water tablesand with the more carbonaceous shale units. Subsequent to the New Year, two diamond drill rigs are now operating, with over5,000m of drilling planned at and around Retortillo in this campaign. The technical content of this report has been reviewed and approved by MrPeter Ellis, a Member of The Australian Institute of Mining and Metallurgy andan employee of Berkeley Resources Limited. Mr Ellis has sufficient experiencewhich is relevant to the style of mineralisation and type of deposit underconsideration and to the activity which he is undertaking to qualify as aCompetent Person as defined in the 2004 Edition of the 'Australasian Code forReporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Ellisconsents to the inclusion in the report of the matters based on his informationin the form and context in which it appears. Enquiries - Matt Syme Telephone: +61 417 906 717 Managing Director Facsimile: +61 8 9322 6558 Email: info@berkeleyresources.com.au This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
1st Mar 20127:00 amRNSUpdate on Enusa Negotiations
24th Feb 20127:47 amRNSUpdate on Enusa Negotiations
20th Feb 20127:37 amRNSAppendix 3B
14th Feb 20128:30 amRNSProposed issue of options to non-exec director
31st Jan 20127:50 amRNSQuarterly Cashflow Report
31st Jan 20127:49 amRNSQuarterly Activities Report
30th Jan 20127:53 amRNSPFS Results for Salamanca 1 Project
25th Jan 20127:50 amRNSEnusa JV Uranium Project Update
3rd Jan 20128:03 amRNSAppendix 3Z
30th Dec 201110:46 amRNSBoard Change
15th Dec 20118:06 amRNSUpdate on Enusa JV
12th Dec 20118:39 amRNSAppointment of Chief Financial Officer
9th Dec 201112:34 pmRNSPosting of Annual Report
1st Dec 20118:33 amRNSDirector's Final Interest Notice
29th Nov 20118:02 amRNSResults of AGM
31st Oct 20117:38 amRNSQuarterly Cashflow Report
31st Oct 20117:31 amRNSQuarterly Activities Report
27th Oct 201110:22 amRNSNotice of AGM
27th Oct 20119:01 amRNSSalamanca Operations Update
27th Oct 20118:35 amRNSBoard Change
13th Oct 20117:00 amRNSSalamanca 1 Uranium Project
28th Sep 201110:22 amRNSAnnual Financial Report
23rd Sep 20119:16 amRNSAppendix 3B
23rd Sep 20119:14 amRNSAppendix 3Y
20th Sep 20112:46 pmRNSResult of General Meeting
25th Aug 20119:25 amRNSAppointment of Laurie Marsland as a Director
19th Aug 20118:30 amRNSNotice of General Meeting
29th Jul 20117:18 amRNSQuarterly Activities Report
29th Jul 20117:18 amRNSQuarterly Cashflow Report
30th Jun 20119:22 amRNSDirectorate Change
6th Jun 20117:50 amRNSCommencement of Brendan James
31st May 20117:45 amRNSUpdate on ENUSA
24th May 201110:52 amRNSStatement re ENUSA
5th May 20119:04 amRNSAppointment of Project Manager
3rd May 20117:00 amRNSAppendix 5B
3rd May 20117:00 amRNSQuarterly Report
25th Mar 20118:24 amRNSSalamanca Uranium Project Update
18th Mar 20118:35 amRNSAppendix 3B
15th Mar 20118:01 amRNSHalf Yearly Report
11th Mar 20119:34 amRNSAppointment of Chief Executive Officer
7th Mar 201110:01 amRNSCompletion of 2nd Tranche of Placement
2nd Mar 20119:20 amRNSResult of General Meeting
31st Jan 201110:33 amRNSNotice of General Meeting
31st Jan 201110:31 amRNSAppendix 5B
31st Jan 201110:30 amRNSQuarterly Activities Report - December 2010
27th Jan 20118:30 amRNSSection 708A(5)(e) Corporations Act Notice
19th Jan 20118:21 amRNSMajor Milestones in Salamanca Uranium Project
19th Jan 20118:16 amRNSFully Underwritten A$55 million Placement
17th Jan 20117:00 amRNSAppointment of Chairman
17th Jan 20117:00 amRNSAppendix 3Y

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.