Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Eng Regulatory News (BKY)

Share Price Information for Berkeley Eng (BKY)

Share Price is delayed by 15 minutes
Get Live Data
26.50    0.00 (0.00%)
Bid:
26.00
Ask:
27.00
Spread: 1.00 (3.846%)
Market Cap: £118.27m
BKY Live PriceLast checked at - London Stock Exchange

Intraday Berkeley Eng Share Chart

Drilling Report

5 Nov 2009 08:32

RNS Number : 0128C
Berkeley Resources Limited
05 November 2009
 



5 November 2009

BERKELEY RESOURCES LIMITED

Initial High Grade Drilling Results at the 

Salamanca Uranium Project

Berkeley is pleased to announce the initial results from the confirmatory diamond drilling program at the Mina D deposit in Spain.

All of the completed holes to date have intercepted their intended targets, with the thickness and grade of the intercepts providing strong confidence in the historic ENUSA results upon which Berkeley has based its exploration targets.

Three rigs mobilised to site on 14 October and the results of the first 4 holes are reported in Table 1 (NB. MDD-003 is still drilling). The results are based on down-hole gamma logging undertaken by Berkeley and are presented as equivalent U3O8 ppm grades or eU3O8. All of the mineralised intervals will be chemically assayed at a later stage.

Table 1 - Drill Hole Intersections

Hole ID

Northing

Easting

Elevation

Depth

From

To

Interval

eU3O8

 

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(ppm)

MDD-001

701418

4500972

628.2

72

33.73

36.02

2.29

275

MDD-001

 

 

 

 

46.85

56.24

9.39

6,070

MDD-002

701395

4500984

627.7

84

41.25

44.42

3.17

332

MDD-002

 

 

 

 

52.19

54.95

2.76

278

MDD-002

 

 

 

 

56.92

68.44

11.52

881

MDD-003

701392

4500556

659.2

100

Drilling

MDD-004

701176

4500783

655.2

90

38.68

39.82

1.14

317

MDD-004

 

 

 

 

55.19

63.24

8.05

1,863

MDD-004

 

 

 

 

75.12

76.25

1.13

577

MDD-005

701440

4500644

640.6

65

29.26

31.26

2.00

315

MDD-005

 

 

 

 

36.40

41.42

5.02

1,583

Enquiries - Managing Director: Matt Syme Tel: +61 417 906 717

RBC Capital Markets:  Martin Eales Tel: +44 20 7029 7881

All of the intersections correlated well in both grade and thickness with nearby ENUSA roto-percussion and diamond drill holes.

Mineralisation is hosted in fractured phyllites and occurs as pitchblende in veinlets and on fracture surfaces. 

Mina D was previously mined by ENUSA and the unmined portions of the deposit are the first target for Berkeley's confirmatory drilling campaign. In addition to confirming the historic drilling results, this campaign is intended to provide a better understanding of the ENUSA Uranium Deposits and allow Berkeley to estimate JORC compliant resources. Further confirmatory drilling is expected to commence at the Sageras and Alameda South deposits in November.

Notes

The uranium grades reported in this release are annotated with a sub-prefix "e" because they have been reported as uranium equivalent grades derived from down-hole gamma ray logging results and so they should be regarded as approximations only. Equivalent U3O8 results may be affected by local disequilibrium caused by the mobility of uranium or the presence of radon.

The down hole gamma probe used is a digital GeoVista Natural Gamma Ray probe calibrated on a bi-monthly basis at the ENUSA custom built calibration test pit.

Down-hole gamma logging of drill holes provides a powerful tool for uranium companies to explore for and evaluate uranium deposits. This method measures the natural gamma rays emitted from the material surrounding a drill hole.

Drill hole co-ordinates are in UTM 29 ED 50 Datum grid and have been surveyed using a DGPS. 

Drill intersections are calculated using a 200 ppm eU3O8 lower cut-off with a minimum 1 metre intersection.

The geological units at Mina D are dipping at approximately 30º and the drill holes have been inclined to intersect the mineralisation at right angles so the intervals are approximately true thickness.

As a check on the down-hole gamma logging data, hand held scintillometer readings were taken along the mineralised sections of the core and averaged out every 50cm. These showed good correlation with the down-hole gamma readings and were used to identify sections which may have been affected by radon. The down-hole gamma results also confirmed visual observations of significant uranium mineralisation in all of the holes.

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr. Ross Corben, who is a Member of The Australian Institute of Mining and Metallurgy and an employee of Berkeley Resources Limited. Mr. Corben has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Corben consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFSWSAISUSEEF
Date   Source Headline
17th Jan 20117:00 amRNSAppointment of Chairman
17th Jan 20117:00 amRNSExpiry of OAO Severstal Subscription Right
30th Dec 20107:00 amRNSUpdate on Offer Proposal and Director Resignation
24th Dec 201010:11 amRNSShare Dealing Code
21st Dec 20107:55 amRNSBlocklisting Interim Review
16th Dec 20109:49 amRNSSalamanca Uranium Project Update
14th Dec 20108:49 amRNSExploitation Plan for Salamanca Uranium Project
10th Dec 20104:20 pmRNSExtension of Subscription Agreement
6th Dec 20107:47 amRNSDrilling Report
29th Nov 20107:47 amRNSResult of AGM
26th Nov 201010:09 amRNSSection 708A
26th Nov 201010:05 amRNSPlacing and Update on Potential Offer
12th Nov 20109:10 amRNSAppendix 3Y
10th Nov 20109:05 amRNSIssue of Equity
29th Oct 201010:35 amRNSPossible Takeover and Interim Funding Agreement
29th Oct 20109:01 amRNSAppendix 5B
29th Oct 20109:00 amRNSQuarterly Report
14th Oct 201012:09 pmRNSBoard Appointment
11th Oct 20108:05 amRNSIssue of Equity
4th Oct 20108:02 amRNSFinal Director's Interest Notice
1st Oct 201011:38 amRNSAnnual Financial Report
1st Oct 201010:16 amRNSBoard Changes
23rd Sep 20107:55 amRNSUpgraded Mineral Resources
7th Sep 20107:58 amRNSBoard Changes
2nd Sep 20107:29 amRNSChange of Registered Address
16th Aug 201011:41 amRNSIssue of Equity
10th Aug 20108:33 amRNSDevelopment and Financing Partnership with KEPCO
6th Aug 20109:14 amRNSIssue of Equity
30th Jul 20108:25 amRNSAppendix 5B
30th Jul 20108:13 amRNSQuarterly Report
7th Jul 20109:06 amRNSHolding(s) in Company
2nd Jul 20108:02 amRNSFinancial advisor
30th Jun 20108:33 amRNSCompany Secretary Change
28th Jun 20107:57 amRNSCommencement of Drilling
18th Jun 20107:59 amRNSIssue of Equity
15th Jun 201010:31 amRNSAppendix 3Y
7th Jun 20108:01 amRNSMetallurgical Testing
25th May 20108:11 amRNSDrilling Report
20th May 20108:35 amRNSBlocklisting Interim Review
19th May 201011:46 amRNSIssue of Equity
30th Apr 201010:12 amRNSQuarterly Report
30th Apr 201010:10 amRNSAppendix 5B
28th Apr 20109:11 amRNSAppointment of CFO
1st Apr 20108:14 amRNSAppendix 3Y
1st Apr 20108:13 amRNSAppendix 3B
1st Apr 20108:10 amRNSResult of EGM
30th Mar 20107:50 amRNSHolding(s) in Company
30th Mar 20107:49 amRNSResources Update
19th Mar 20108:08 amRNSAppendix 3B
18th Mar 20107:00 amRNSDrilling Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.