Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Eng Regulatory News (BKY)

Share Price Information for Berkeley Eng (BKY)

Share Price is delayed by 15 minutes
Get Live Data
25.70    -1.00 (-3.77%)
Bid:
24.40
Ask:
27.00
Spread: 2.60 (10.656%)
Market Cap: £113.80m
BKY Live PriceLast checked at - London Stock Exchange

Intraday Berkeley Eng Share Chart

Drilling Report

5 Nov 2009 08:32

RNS Number : 0128C
Berkeley Resources Limited
05 November 2009
Β 

ο»Ώ

5 NovemberΒ 2009

BERKELEY RESOURCES LIMITED

Initial High Grade Drilling Results at theΒ 

SalamancaΒ Uranium Project

BerkeleyΒ is pleased to announce the initial results from the confirmatory diamond drilling programΒ at the Mina D deposit inΒ Spain.

All of the completedΒ holesΒ to dateΒ have intercepted their intended targets, with the thickness and grade of the interceptsΒ providing strongΒ confidenceΒ inΒ the historic ENUSA results upon whichΒ BerkeleyΒ has based its exploration targets.

Three rigs mobilisedΒ to site onΒ 14 October andΒ the results of the firstΒ 4Β holes are reported in Table 1Β (NB. MDD-003 is still drilling). The results are basedΒ on down-hole gamma loggingΒ undertaken byΒ BerkeleyΒ and are presented as equivalent U3O8Β ppmΒ grades or eU3O8. All of the mineralisedΒ intervals will be chemicallyΒ assayedΒ at a later stage.

Table 1 - Drill Hole Intersections

Hole ID

Northing

Easting

Elevation

Depth

From

To

Interval

eU3O8

Β 

(m)

(m)

(m)

(m)

(m)

(m)

(m)

(ppm)

MDD-001

701418

4500972

628.2

72

33.73

36.02

2.29

275

MDD-001

Β 

Β 

Β 

Β 

46.85

56.24

9.39

6,070

MDD-002

701395

4500984

627.7

84

41.25

44.42

3.17

332

MDD-002

Β 

Β 

Β 

Β 

52.19

54.95

2.76

278

MDD-002

Β 

Β 

Β 

Β 

56.92

68.44

11.52

881

MDD-003

701392

4500556

659.2

100

Drilling

MDD-004

701176

4500783

655.2

90

38.68

39.82

1.14

317

MDD-004

Β 

Β 

Β 

Β 

55.19

63.24

8.05

1,863

MDD-004

Β 

Β 

Β 

Β 

75.12

76.25

1.13

577

MDD-005

701440

4500644

640.6

65

29.26

31.26

2.00

315

MDD-005

Β 

Β 

Β 

Β 

36.40

41.42

5.02

1,583

Enquiries - Managing Director: Matt Syme Tel: +61 417 906 717

RBC Capital Markets:Β  Martin Eales Tel: +44 20 7029 7881

All of the intersections correlated well in both grade and thickness with nearby ENUSAΒ roto-percussion and diamondΒ drill holes.

Mineralisation is hosted in fractured phyllites and occurs as pitchblende in veinlets and on fracture surfaces.Β 

Mina D was previously mined by ENUSA and the unmined portions of the deposit are the first target forΒ Berkeley's confirmatory drilling campaign. In addition to confirming the historic drilling results, this campaign is intended to provide a better understanding of the ENUSA Uranium Deposits and allowΒ BerkeleyΒ to estimate JORC compliant resources. Further confirmatory drilling is expected to commenceΒ at the Sageras and Alameda South deposits in November.

Notes

The uranium grades reported in this release are annotated with a sub-prefix "e" because they have been reported as uranium equivalent grades derived from down-hole gamma ray logging results and so they should be regarded as approximations only. Equivalent U3O8Β results may be affected by local disequilibrium caused by the mobility of uranium or the presence of radon.

The down hole gamma probe used is a digital GeoVista Natural Gamma Ray probe calibrated on a bi-monthly basis at the ENUSA custom built calibration test pit.

Down-hole gamma logging of drill holes provides a powerful tool for uranium companies to explore for and evaluate uranium deposits. This method measures the natural gamma rays emitted from the material surrounding a drill hole.

Drill hole co-ordinates are in UTMΒ 29 ED 50 DatumΒ grid and have beenΒ surveyedΒ using aΒ DGPS.Β 

Drill intersections are calculated using a 200Β ppmΒ eU3O8Β lower cut-offΒ with a minimum 1 metre intersection.

The geological units at Mina D are dipping at approximately 30ΒΊ and the drill holes have been inclined to intersect the mineralisation at right angles so the intervals are approximately true thickness.

As a check on the down-hole gamma logging data, hand held scintillometer readings were taken along the mineralised sections of the core and averaged out every 50cm. These showed good correlation with the down-hole gamma readings and were used to identify sections which may have been affected by radon. The down-hole gamma results also confirmed visual observations of significant uranium mineralisation in all of the holes.

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr. Ross Corben, who is a Member of The Australian Institute of Mining and Metallurgy and an employee of Berkeley Resources Limited. Mr. Corben has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the β€˜Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Corben consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLFSWSAISUSEEF
Date   Source Headline
20th Sep 201310:01 amRNSAnnual Financial Report
7th Aug 20137:11 amRNSDrilling Report
30th Jul 20137:10 amRNSAppendix 5B
30th Jul 20137:10 amRNSQuarterly Report
20th May 20137:25 amRNSCompany Presentation
17th May 20138:25 amRNSBlocklisting Interim Review
17th May 20138:25 amRNSDirector/PDMR Shareholding
17th May 20138:22 amRNSIssue of Equity
3rd May 20137:42 amRNSAppendix 3Y 2 of 2
3rd May 20137:42 amRNSAppendix 3Y 1 of 2
3rd May 20137:40 amRNSAppendix 3B
29th Apr 20137:22 amRNS3rd Quarter Results
29th Apr 20137:22 amRNSAppendix 5B
16th Apr 20137:43 amRNSExpiry of Listed Options
12th Apr 20139:24 amRNSResult of Meeting
14th Mar 20137:39 amRNSHalf Yearly Report
12th Mar 20137:45 amRNSNotice of General Meeting
8th Feb 20138:41 amRNSHolding(s) in Company
31st Jan 20138:46 amRNSAppendix 5B - Mining exploration entity quarterly
31st Jan 20138:44 amRNSDecember 2012 Quarterly Report
29th Nov 20128:59 amRNSAppendix 3Z
29th Nov 20128:57 amRNSResult of AGM
29th Nov 20127:39 amRNSScoping Study
9th Nov 20127:30 amRNSAppendix 3B
7th Nov 20128:50 amRNSHolding(s) in Company
31st Oct 20128:04 amRNS1st Quarter Results
31st Oct 20127:50 amRNSAppendix 5B
26th Oct 20127:16 amRNSNotice of AGM
27th Sep 20128:45 amRNSFinal Results
14th Aug 20127:26 amRNSBlocklisting Interim Review
10th Aug 20127:24 amRNSAppendix 3B
8th Aug 20129:33 amRNSHolding(s) in Company
2nd Aug 20128:25 amRNSAppendix 3Z
2nd Aug 20128:24 amRNSDirectorate Change
31st Jul 20128:41 amRNSQuarterly Cashflow Report
31st Jul 20128:38 amRNSQuarterly Activities Report
24th Jul 20127:33 amRNSAgreement with ENUSA
6th Jul 201210:09 amRNSASX Price and Volume Query
18th May 20128:08 amRNSChange of Senior Management and Registered Office
10th May 20127:42 amRNSAppendix 3Z
10th May 20127:33 amRNSDirectorate Change
30th Apr 20129:49 amRNSQuarterly Cashflow Report
30th Apr 20129:44 amRNSQuarterly Activities Report
27th Apr 201210:25 amRNSAppendix 3B
27th Apr 201210:03 amRNSAppendix 3Z
26th Apr 20127:49 amRNSBoard Changes and Share Placement
24th Apr 20127:39 amRNSDrilling Results at Villares Salamanca I
13th Apr 20127:19 amRNSDirectorate Change
11th Apr 20127:37 amRNSAppendix 3B
13th Mar 20122:24 pmRNSCompany Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.