Ben Richardson, CEO at SulNOx, confident they can cost-effectively decarbonise commercial shipping. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Eng Regulatory News (BKY)

Share Price Information for Berkeley Eng (BKY)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 18.50
Bid: 17.50
Ask: 19.50
Change: 0.25 (1.37%)
Spread: 2.00 (11.429%)
Open: 18.50
High: 18.50
Low: 18.50
Prev. Close: 18.25
BKY Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

December 2012 Quarterly Report

31 Jan 2013 08:44

RNS Number : 7856W
Berkeley Resources Limited
31 January 2013
 



 

 

 

BERKELEY RESOURCES LIMITED

AIM RELEASE | 31 JANUARY 2013  | ASX/AIM:BKY

DECEMBER 2012 QUARTERLY REPORT

Berkeley Resources Limited ('Berkeley' or the 'the Company') is pleased to present its quarterly report for the period ended 31 December 2012.

 

Highlights:

·; A positive Scoping Study was completed in November and confirmed the technical and economic viability of the Salamanca Project, including:

Ø Initial mine life of 11 years, including 7 years steady state operation, with strong potential to increase;

Ø Steady state annual production of 3.2 million pounds U3O8, with average annual production of 2.6 million pounds U3O8 over the life of mine;

Ø Life of mine average operating costs of US$25.65 per pound of U3O8;

Ø Upfront capital cost of US$83.6 million to deliver initial production. A further US$95.0 million, incurred in the second year of production and largely funded from operating cashflow, to achieve steady state operation.

·; Pre-Feasibility Study commenced, targeting completion in mid 2013. The study was awarded to Johannesburg based SENET, who will be assisted by SRK Consulting for mine design, Knight Piesold for heap design and Duro Felguera for the in-country project cost estimates.

·; The permitting process for Retortillo continued to advance with the Company's responses to the submissions received during the 30 day Public Information Period being delivered to the relevant authorities for their review and evaluation. The Nuclear Safety Council has also confirmed that all required information for the preparation of their compulsory report regarding the mining activities, and for the Initial Authorization of the process plant as a radioactive facility has been submitted.

·; The permitting process for Alameda was initiated with the submission to the relevant authorities of the Environmental Scoping Document and documentation associated with the application for reclassification (from rural to industrial use) of the affected surface land area.

 

The Directors are encouraged by the positive results of the Scoping Study, which clearly demonstrate the potential of the Salamanca Project to support a significant scale, long life uranium mining operation. Accordingly, the Company continues to focus on pursuing the ongoing exploration, appraisal and development of the Project in order to fulfil its strategic objective of becoming the next European uranium producer.

 

Enquiries: Robert Behets

Berkeley Resources

+61 8 9322 6322

 

OPERATIONS

Berkeley Resources Limited ('Berkeley' or 'the Company') is a uranium exploration and development company with a quality resource base in Spain. Berkeley is currently focused on advancing its wholly owned flagship Salamanca Project.

 

Salamanca Project

The Salamanca Project ('the Project') comprises the Retortillo, Alameda and Gambuta deposits plus a number of other Satellite deposits located in western Spain.

 

The results of a Preliminary Feasibility Study completed in early 2012 confirmed the technical and economic viability of a stand-alone project exploiting Retortillo, whilst Alameda formed part of a separate Feasibility Study completed in 2011.

 

In November 2012, the Company completed an initial assessment of the integrated development of Retortillo and Alameda and reported the results of the Scoping Study ('the Study').

 

The Study was managed by Berkeley with input from a number of industry-recognised specialist consultants covering the key disciplines. The Study incorporated all of the information generated from the previous studies conducted on Retortillo and Alameda, as well as new, more recently completed drilling and metallurgical testwork data.

 

Scoping Study Results

Using only the current Mineral Resource Estimates for Retortillo and Alameda, which total 33.9 million pounds U3O8 (35.9 million tonnes at 429 ppm; 200 ppm U3O8 cut-off grade), as a base case scenario, the Project can support an average annual production of 3.2 million pounds of U3O8 during the seven years of steady state operation and 2.6 million pounds of U3O8 over a minimum eleven year mine life. There is strong potential to increase the production profile and mine life through the exploitation of additional resources held by the Company (totalling 27.1 million pounds U3O8) and with ongoing exploration work.

 

The Study was based on open pit mining, heap leaching, a centralised process plant at Retortillo, and a remote ion exchange operation at Alameda, with loaded resin trucked to the centralised plant for final extraction and purification. The Company currently favours a contractor mining scenario. The average annual ore processing rate during steady state operation is 5.5 million tonnes. Operating cost estimates average US$25.65 per pound U3O8 over the life of mine.

 

The initial capital cost (nominally ± 30% accuracy) for the Project is estimated at US$83.6 million. This cost is inclusive of all mine, processing, infrastructure and indirect costs required to develop and commence production at Retortillo. A further US$95.0 million of capital, incurred in the second year of production and largely funded from operating cashflow, is required to develop Alameda and achieve steady state operation. The Project's capital cost reflects the excellent existing infrastructure, use of heap leaching as the preferred processing route, and the favoured mining contractor scenario (no mining fleet capital expenditure).

 

The Directors are encouraged by the positive results of the Scoping Study which clearly demonstrate the potential of the integrated Salamanca Project to support a significant scale, long life uranium mining operation. Further details on the Study are available in the Company's ASX Announcement dated 29 November 2012.

 

Pre-Feasibility Study

Following completion of the Scoping Study, Berkeley has commenced a Pre-Feasibility Study ('PFS') for the Salamanca Project. The PFS was awarded to the Johannesburg based company SENET, which will develop the study assisted by SRK Consulting for the mine design, Knight Piesold for the heaps design and Duro Felguera for the in-country project cost estimates.

 

The Company will undertake a more detailed mine scheduling and materials movement optimisation study, metallurgical testwork program and infrastructure assessment during the PFS phase, with the aim of identifying opportunities to further enhance the Project economics through capital and operating cost reductions. Resource infill and exploration drilling programs aimed at upgrading the resource classification and increasing the overall resource base are also underway.

 

The PFS will be carried out with a confidence level of ±20% for both the capital and operating cost estimates and will include the design details required to be submitted to the Spanish Nuclear Safety Council as part of the Authorization for Construction process for the processing plant.

 

Further metallurgical testwork will be carried out at the Mintek laboratories in Johannesburg and the Australian Nuclear Science and Technology Organisation ('ANSTO') facilities in Sydney.

 

The testwork program at Mintek aims to confirm the leaching efficiency for each phase of the mine schedule and test ore variability with respect to size distribution and geo-mechanical behaviour. The ANSTO testwork program is designed to facilitate the selection of the optimal backend of the process, with the performance of direct Solvent Extraction ('SX') and ammonium diuranate ('ADU') precipitation being compared to ion exchange ('IX') and UO4 precipitation.

 

Drilling and Mineral Resource Estimation

Drilling activity during the quarter included diamond drilling ('DD') at Retortillo and Alameda for resource definition, to provide drill core for metallurgical testwork and to provide drill core for geotechnical testwork. Details of the 1,836 metres of DD completed are summarised in Table 1.

 

Table 1: 2012 Drilling Summary

Project

RC Q1 2012

RC Q2 2012

RC Q3 2012

RC Q4 2012

RC TOTAL 2012

Holes

Metres

Holes

Metres

Holes

Metres

Holes

Metres

Holes

Metres

Retortillo

74

4,459

74

4,459

Villares

59

3,331

59

3,331

Gambuta

16

1,229

16

1,229

Total

133

7,790

16

1,229

0

0

0

0

149

9,019

DD Q1 2012

DD Q2 2012

DD Q3 2012

DD Q4 2012

DD Total 2012

Holes

Metres

Holes

Metres

Holes

Metres

Holes

Metres

Holes

Metres

Retortillo

12

735

6

508

1

70

19

963

38

2,276

Gambuta

3

269

3

269

Alameda

1

44

18

872

19

916

Total

12

735

9

777

2

114

37

1,836

60

3,462

 

Retortillo and Alameda

Diamond drilling continued during the December quarter at Retortillo and Alameda. This resource infill drilling is planned to facilitate further resource definition and to provide drill core for the next phases of metallurgical testwork being conducted as part of the feasibility studies. In addition, short diamond drill holes were drilled in areas of potential infrastructure sites to test the geotechnical characteristics of these areas.

 

The infill drilling at Retortillo was focussed on the first three phases of the current planned open pit mining schedule. The drilling results indicate that the mineralisation intersected was largely in line with the resource model predictions however, some drilling in the phase one mining area showed the mineralisation to be more erratic than predicted.

 

The results are based on down-hole gamma logging data and are presented as "equivalent" U3O8 grades or eU3O8. Some of the better results reported include 26 metres at 576 ppm eU3O8 from 37 metres depth in RTD341, 23 metres at 490 ppm eU3O8 from 32 metres depth in RTD343 and 16 metres at 1,079 ppm eU3O8 from 1 metre depth in RTD355 (Table 2).

 

Table 2: Retortillo Drilling - Significant Intersections (200ppm eU3O8 cut-off)

Retortillo

From

To

Thickness

eU3O8

(m)

(m)

(m)

(ppm)

RTD-341

26.0

33.0

7.0

1,061

37.0

63.0

26.0

576

66.0

80.0

14.0

779

RTD-343

32.0

55.0

23.0

490

RTD-350

23.0

28.0

5.0

1,023

RTD-351

34.0

49.0

15.0

458

82.0

94.0

12.0

808

RTD-354

7.0

17.0

10.0

900

RTD-355

1.0

17.0

16.0

1,079

 

At Alameda drilling was focused on the first two phases of the current planned open pit mining schedule. The drilling results indicate that the mineralisation intersected was in line with the resource model predictions. The drilling was also successful in demonstrating potential extensions to the current resource. Some of the better results reported include 14 metres at 924 ppm eU3O8 from 3 metres in ASD139, 11 metres at 2,469 ppm eU3O8 from 70 metres in ASD141 and 27 metres at 1,184 ppm eU3O8 from 85 metres in ASD143 (Table 3).

 

Table 3: Alameda Drilling - Significant Intersections (200ppm eU3O8 cut-off)

Alameda

From

To

Thickness

eU3O8

(m)

(m)

(m)

(ppm)

ASD-136

13.0

23.0

10.0

723

ASD-138

6.0

21.0

15.0

404

ASD-139

3.0

17.0

14.0

924

ASD-141

70.0

81.0

11.0

2,469

ASD-143

43.0

61.0

18.0

688

70.0

78.0

8.0

604

85.0

112.0

27.0

1,184

 

Regional Tenements

A program of regional water sampling has commenced in the region surrounding Retortillo. Preliminary results have highlighted the potential for this sampling methodology to detect areas of anomalous uranium associated with mineralisation. Further sampling and evaluation is underway to determine the effectiveness of this exploration method.

 

Gambuta

A Desktop Study undertaken on the Gambuta deposit, following the recent Mineral Resource Estimate ('MRE') update, has highlighted the significant potential of the deposit. Gambuta, which is located approximately 145 kilometres southeast of Retortillo, has an Inferred MRE of 12.7 million tonnes at 394 ppm U3O8 for a total of 11.1 million pounds of U3O8 at a 200 ppm U3O8 cut-off grade (Refer September 2012 Quarterly Report). Following the positive results of the Desktop Study, initial metallurgical testwork will be undertaken during the March quarter to determine the leaching characteristics of the mineralisation.

 

Permitting

The permitting process at Retortillo continues to advance. During the quarter, the Company's responses to the submissions received during the 30 day Public Information Period (completed in mid September) were delivered to the relevant authorities for their review and evaluation. Follow-up discussions regarding appropriate mitigation measures have been held with the authorities. It is anticipated that the Project will be raised for mining and environmental approval within the first half of 2013.

 

The Initial Authorisation for the process plant as a radioactive facility is well advanced. The Nuclear Safety Council has informed Berkeley that they have all required information for the preparation of their compulsory report regarding the mining activities, and also for the Initial Authorization of the process plant as a radioactive facility. Both are anticipated during the June quarter of 2013.

 

Ancillary permits, such as those associated with water and roads, are also currently being advanced. Discussions have been held with the relevant authorities (including the Water Authority and Roads Department) and the required documentation submitted.

 

At Alameda, the Environmental Scoping Document and the documentation associated with the change of the zoning of rural land into that suitable for industrial purposes were submitted in November and December, respectively. The Exploitation Plan, Rehabilitation and Closure Plans and documents related to Radiological Protection will be prepared based on the design developed as part of the PFS, targeting submission of these documents by mid 2013.

 

CORPORATE

At 31 December 2012 the Company had cash reserves of A$32.5 million.

 

In November 2012, Señor Jose Ramon Esteruelas retired as a Non-Executive Director. Señor Esteruelas had been a Director of Berkeley since November 2006 and played a key role as the Company moved from explorer to developer in Spain.

 

 

Competent Persons Statement

The information in this announcement that relates to Exploration Results and Mineral Resources is based on information compiled by Craig Gwatkin, who is a Member of The Australian Institute of Mining and Metallurgy and is an employee of Berkeley Resources Limited. Mr. Gwatkin has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. Gwatkin consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

Forward Looking Statement

Statements regarding plans with respect to the Company's mineral properties are forward-looking statements. There can be no assurance that the Company's plans for development of its mineral properties will proceed as currently expected. There can also be no assurance that the Company will be able to confirm the presence of additional mineral deposits, that any mineralisation will prove to be economic or that a mine will successfully be developed on any of the Company's mineral properties.Appendix A: Summary of Diamond Drill Intersections

 

Retortillo Drilling (e-grades only)

Drill Intersections > 200ppm eU3O8

Hole ID

Easting

Northing

Elev.

Depth

Azim

Dip

From

To

Thick

eU3O8

(m)

(m)

(m)

(m)

(º)

(º)

(m)

(m)

(m)

(ppm)

RTD-340

719460

4520377

752.1

70.40

360

-90

No significant mineralisation

RTD-341

719367

4520737

734.2

90.45

163

-60

26.0

33.0

7.0

1,061

37.0

63.0

26.0

576

66.0

80.0

14.0

779

RTD-342

719671

4520294

741.1

68.50

343

-60

43.0

49.0

6.0

249

62.0

65.0

3.0

545

RTD-343

719548

4520330

748.0

62.90

343

-60

32.0

55.0

23.0

490

RTD-344

719792

4520202

740.4

60.30

298

-60

39.0

41.0

2.0

320

RTD-345

719923

4520076

743.1

61.95

343

-60

33.0

43.0

10.0

247

47.0

54.0

7.0

788

RTD-346

719913

4520154

745.3

61.50

307

-60

29.0

32.0

3.0

448

41.0

46.0

5.0

285

RTD-347

719199

4520741

721.6

50.35

360

-90

No significant intersection

RTD-348

719152

4520652

722.0

30.00

118

-60

No significant intersection

RTD-349

719366

4520736

733.8

49.00

208

-60

5.0

7.0

2.0

369

RTD-350

719260

4520618

734.7

46.80

118

-60

23.0

28.0

5.0

1,023

RTD-351

719194

4520517

736.0

106.25

118

-60

3.0

6.0

4.0

418

25.0

28.0

3.0

281

34.0

49.0

15.0

458

57.0

59.0

2.0

492

63.0

72.0

9.0

341

77.0

79.0

2.0

537

82.0

94.0

12.0

808

RTD-352

719277

4520614

738.1

45.50

360

-90

No significant intersection

RTD-353

719162

4520614

723.4

28.55

360

-90

No significant intersection

RTD-354

719231

4520639

728.6

39.45

360

-90

1.0

2.0

1.0

260

7.0

17.0

10.0

900

RTD-355

719231

4520639

728.6

32.15

360

-90

1.0

17.0

16.0

1,079

RTD-356

719423

4520895

724.0

68.50

28

-60

8.0

9.0

1.0

270

12.0

19.0

7.0

663

23.0

30.0

7.0

451

RTD-357

719130

4520291

750.5

20.50

360

-90

No significant Intersection

RTD-358

719369

4520089

754.4

20.00

360

-90

No significant Intersection

RTD-359

719400

4519800

744.6

20.00

360

-90

No significant Intersection

 

Alameda Drilling (e-grades only)

Drill Intersections > 200ppm eU3O8

Hole ID

Easting

Northing

Elev.

Depth

Azim

Dip

From

To

Thick

e-U3O8

(m)

(m)

(m)

(m)

(º)

(º)

(m)

(m)

(m)

(ppm)

ASD-135

688954

4501653

733.0

43.75

30

-60

18.0

20.0

2.0

320

26.0

28.0

2.0

332

ASD-136

688895

4501738

731.0

42.35

30

-60

13.0

23.0

10.0

723

31.0

33.0

2.0

575

ASD-137

688750

4501787

728.0

64.35

30

-60

5.0

14.0

9.0

196

ASD-138

688644

4501805

726.0

41.25

30

-60

6.0

21.0

15.0

404

ASD-139

689147

4500675

727.0

39.70

250

-60

3.0

17.0

14.0

924

20.0

24.0

4.0

575

ASD-140

688975

4500651

725.0

90.65

360

-90

21.0

36.0

15.0

239

43.0

48.0

5.0

587

64.0

66.0

2.0

573

73.0

75.0

2.0

756

ASD-141

688915

4500614

723.0

89.85

250

-60

16.0

27.0

11.0

259

42.0

46.0

4.0

431

70.0

81.0

11.0

2,469

ASD-142

688937

4500732

724.3

112.50

360

-90

20.0

28.0

8.0

251

41.0

48.0

7.0

283

96.0

98.0

2.0

476

ASD-143

689028

4500819

733.8

130.15

360

-90

23.0

27.0

4.0

560

31.0

36.0

5.0

452

43.0

61.0

18.0

688

70.0

78.0

8.0

604

85.0

112.0

27.0

1,184

ASD-144

689204

4500831

744.5

76.45

283

-60

27.0

31.0

4.0

719

ASD-145

689745

4501520

749.0

25.75

360

-90

No Significant Intersection

ASD-146

690029

4501290

749.0

21.65

360

-90

No Significant Intersection

ASD-147

689404

4499490

734.0

20.10

360

-90

No Significant Intersection

ASD-148

690004

4499990

747.0

15.50

360

-90

No Significant Intersection

ASD-149

689757

4499510

739.0

20.50

360

-90

No Significant Intersection

ASD-150

689300

4500060

743.0

20.00

360

-90

No Significant Intersection

ASD-151

689631

4500704

743.0

20.20

360

-90

No Significant Intersection

ASD-152

689968

4500531

743.0

20.60

360

-90

No Significant Intersection

ASD-153

689458

4501780

743.0

20.80

360

-90

No Significant Intersection

 

Notes:

1. All results based on down hole equivalent grades

2. Coordinates are in UTM Grid (ED1950 Zone 29N) and have been measured by a DGPS (+/- 1m accuracy)

3. The mineralisation is hosted by metasediment, typically in the first 90m below surface and is interpreted to be flat lying. Thus reported intervals approximate true widths.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IMSWGURWGUPWURG
Date   Source Headline
26th Apr 20247:00 amRNSBoard Changes
26th Apr 20247:00 amRNSQuarterly Report March 2024
10th Apr 20247:32 amRNSCommencement of Arbitration against Spain
13th Mar 20247:05 amRNSHalf-Year Accounts
30th Jan 20247:00 amRNSQuarterly Report December 2023
2nd Jan 20247:00 amRNSExpiry of Unlisted Options
27th Dec 20237:00 amRNSPermitting update
21st Dec 20237:00 amRNSReport on Payments to Govts
21st Nov 20237:00 amRNSResult of AGM
30th Oct 20237:00 amRNSSeptember 2023 Quarterly
11th Oct 20237:00 amRNSNotice of AGM
22nd Sep 20237:00 amRNSDate of Annual General Meeting
30th Aug 20237:00 amRNS2023 Annual Report
26th Jul 20237:57 amRNSIssue of Unlisted Options
24th Jul 20237:00 amRNSQuarterly Report June 2023
19th Jul 20237:00 amRNSResults of Meeting
19th Jun 20237:00 amRNSNotice of General Meeting
31st May 20237:00 amRNSExpiry of Unlisted Options
28th Apr 20237:00 amRNSQuarterly Report March 2023
3rd Apr 202312:12 pmRNSPermitting Update
14th Mar 20237:00 amRNSHalf-year Report
7th Feb 20234:40 pmRNSSecond Price Monitoring Extn
7th Feb 20234:35 pmRNSPrice Monitoring Extension
7th Feb 20231:12 pmRNSPermitting Update
31st Jan 20237:00 amRNSQuarterly Report December 2022
26th Jan 20234:40 pmRNSSecond Price Monitoring Extn
26th Jan 20234:35 pmRNSPrice Monitoring Extension
3rd Jan 20237:00 amRNSExpiry of Unlisted Options
22nd Dec 20227:00 amRNSReport on Payments to Governments
1st Dec 20227:00 amRNSUnlisted Options
18th Nov 20227:00 amRNSNotification of Investment Dispute
15th Nov 20227:00 amRNSResult of AGM
9th Nov 20227:00 amRNSBerkeley establishes Spanish Advisory Committee
27th Oct 20227:00 amRNSQuarterly Report September 2022
20th Oct 20222:13 pmRNSPublication of a Prospectus
4th Oct 20227:00 amRNSNotice of AGM
23rd Sep 20224:35 pmRNSPrice Monitoring Extension
19th Sep 20227:45 amRNSDate of AGM
31st Aug 202210:00 amRNS2022 Annual Report
29th Jul 20227:00 amRNSQuarterly Report June 2022
5th Jul 20227:00 amRNSChange of Director’s Interest Notice
28th Jun 20227:00 amRNSStrengthening of Board with Spanish Based Director
29th Apr 20227:00 amRNSQuarterly Report March 2022
29th Apr 20227:00 amRNSQuarterly Report March 2022
5th Apr 20228:46 amRNSNotice of Initial Substantial Holder
5th Apr 20227:00 amRNSNotice of Initial Substantial Holder
1st Apr 20227:00 amRNSSettlement of OIA Claim
24th Mar 20224:36 pmRNSPrice Monitoring Extension
24th Mar 20222:00 pmRNSPrice Monitoring Extension
24th Mar 202211:05 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.