Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBeowulf Mining PLC Regulatory News (BEM)

Share Price Information for Beowulf Mining PLC (BEM)

Share Price is delayed by 15 minutes
Get Live Data
8.00    0.00 (0.00%)
Bid:
7.00
Ask:
9.00
Spread: 2.00 (28.571%)
Market Cap: £5.18m
BEM Live PriceLast checked at - London Stock Exchange

Intraday Beowulf Mining PLC Share Chart

Vardar Minerals Update

2 Nov 2023 07:00

RNS Number : 1162S
Beowulf Mining PLC
02 November 2023
 

 

The information contained within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulation ("MAR") (EU) No. 596/2014, as incorporated into UK law by the European Union (Withdrawal) Act 2018. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

 

 

2 November 2023

Beowulf Mining Plc

 

("Beowulf" or the "Company")

 

Vardar Minerals Update

 

Beowulf (AIM: BEM; Spotlight: BEO), and its 61.1% owned subsidiary Vardar Minerals Limited ("Vardar"), are pleased to provide an update on recent exploration activity on its projects in Kosovo.

 

 

Highlights

 

Shala Central Licence

· Exploration activity including mapping, surface sampling and drone-magnetics highlights significant coincident geochemical and geophysical anomalies.

· Encouraging grab sample results up to 3.3% zinc ("Zn") and 1.02% lead ("Pb") collected from gossans during the mapping.

· Geochemical anomalies extend for approximately two kilometres ("km") of strike with soil samples of up to 1.3% zinc and 0.5% lead with elevated copper and arsenic.

Shala East Licence

· Recent mapping of three primary targets with soil and grab sample results pending.

 

 

Ed Bowie, Chief Executive Officer of Beowulf, commented:

 

"The exploration team has been busy over the summer period, mapping, surface sampling and subsequently flying drone magnetics over part of the Shala Central licence, contiguous with the Company's Mitrovica licence package in northern Kosovo.

 

"The significant extent and tenor of the metal-in-soil anomaly and its coincidence with the magnetic high, makes it an extremely encouraging target warranting further follow-up."

 

 

Exploration activity and results

 

The Shala Central licence is 87km2 in area; it is situated to the north and is contiguous with the Company's Mitrovica licence package. The licence was awarded in 2021 with limited reconnaissance work completed during 2022 prior to the current exploration programme. Initial activity focused on the eastern portion of the licence with further work carried out in the north, as highlighted in the map below. This initial work consisted of mapping and rock-chip and grab sampling.

 

Figure 1: Vardar's Mitrovica licence package

 

The geology of the Shala Central licence is dominated by the Jurassic and Cretaceous ophiolite sequence with mafic, ultramafic and serpentinite-listwanite units identified. Locally, Oligo-Miocene volcanoclastic and intrusive bodies are observed. Silicification, argillic and advanced argillic alteration was extensively observed and mapped. Major north west-south east striking faults are mapped bisecting the licence and appear to off-set alteration and mineralisation.

Figure 2: Geology of the Shala Central licence dominated by ophiolite sequence

 

Extensive outcrop occurs across the eastern portion of the licence enabling historic regional scale mapping to be corroborated and enhanced. In total, 2,444 field observation points have been recorded and 516 outcrop and float samples collected and analysed using the Company's handheld XRF device. Of particular note is significant gossanous outcrop identified during the mapping, indicative of potential significant sulphide mineralisation and containing elevated metal values.

 

Figure 3: Gossanous outcrop mapped in the eastern portion of the Shala Central licence

 

The mapping was followed up with systematic soil sampling, initially on a 200 metre ("m") by 50m grid with further infill sampling on 50m by 50m. Samples were prepared and analysed with a handheld XRF device by Vardar geologists and, as with the rock-chip and float samples, standard QAQC procedures were followed including the use of blanks, standards and duplicates.

 

The geochemical data shows a highly anomalous zone, offset from a major structural fault lying to the south and trending north west-south east. This fault appears to be a significant controlling structure with no magnetic signature and alteration to its south. The geochemical anomaly also wraps around an intrusive body, identified both from mapping and geophysics.

 

Supplementing the geochemical data, the Vardar team also flew a close spaced drone magnetic survey over the eastern portion of the Shala Central tenement. The survey was broken into 18 blocks each 700m by 700m in area with lines flown on 25m spacing and at 50m above ground level for a total of 27km per block. Additionally, tie lines were flown on 250m spacing to ensure data from each line and block could be linked appropriately with its neighbours. In total, 489km were flown covering approximately 25% of the total Shala Central licence area.

 

 

Figure 4: Drone-magnetic survey lines - single block

 

The magnetic data highlighted a number of interesting features, including the round magnetic high in the centre of the survey, postulated to be an intrusive body around which the geochemical anomalies appear to wrap, and which has important implications as a heat source and potential mechanism for concentrating metals. Furthermore, a strongly magnetic feature, sub-parallel to the north west-south east fault, is coincident with the geochemical anomaly highlighted above.

 

Figure 5: Coincident geochemical zinc-in soil anomaly with magnetic high

 

Current and future work programme

 

Following the success of the current programme in the eastern portion of the Shala Central licence, further follow-up and infill sampling will be completed and extended into the western portion of the licence.

 

In addition, a mapping and sampling programme was initiated in the Shala East licence focusing on three areas identified as intrusive centres from historic regional-scale mapping (see Figure 1). Access to this licence has improved significantly with a paved road built for the installation and servicing of a wind farm. In addition to improved access, the road-cuts provide significant fresh outcrop for mapping and sampling. Systematic soil, float and rock-chip sampling is being carried out and results will be released in due course.

 

 

Enquiries:

Beowulf Mining plc

Ed Bowie, CEO

ed.bowie@beowulfmining.com

SP Angel

(Nominated Adviser & Broker)

Ewan Leggat / Stuart Gledhill / Adam Cowl

Tel: +44 (0) 20 3470 0470

BlytheRay

Tim Blythe / Megan Ray 

Tel: +44 (0) 20 7138 3204

 

About Beowulf Mining plc

 

Beowulf Mining is a mining company with main activities in exploration and development in Sweden, Finland and Kosovo. Beowulf's portfolio is diversified by commodity, geography and stage of development of the projects and consists primarily of iron ore, graphite, gold and base metals. Beowulf Mining is headquartered in London, England.

 

 

Cautionary Statement

 

Statements and assumptions made in this document with respect to the Company's current plans, estimates, strategies and beliefs, and other statements that are not historical facts, are forward-looking statements about the future performance of Beowulf. Forward-looking statements include, but are not limited to, those using words such as "may", "might", "seeks", "expects", "anticipates", "estimates", "believes", "projects", "plans", strategy", "forecast" and similar expressions. These statements reflect management's expectations and assumptions in light of currently available information. They are subject to a number of risks and uncertainties, including, but not limited to , (i) changes in the economic, regulatory and political environments in the countries where Beowulf operates; (ii) changes relating to the geological information available in respect of the various projects undertaken; (iii) Beowulf's continued ability to secure enough financing to carry on its operations as a going concern; (iv) the success of its potential joint ventures and alliances, if any; (v) metal prices, particularly as regards iron ore. In the light of the many risks and uncertainties surrounding any mineral project at an early stage of its development, the actual results could differ materially from those presented and forecast in this document. Beowulf assumes no unconditional obligation to immediately update any such statements and/or forecast.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDBBBBTMTJMTTJ
Date   Source Headline
5th Feb 20247:00 amRNSProject Director appointed for Kallak
24th Jan 20247:00 amRNSUpdated Corporate Presentation
22nd Jan 20247:00 amRNSUpdate on the Kallak Iron Ore Project
17th Jan 20247:00 amRNSUpdate for the development of GAMP in GigaVaasa
28th Dec 20237:00 amRNSAppointment of Joint UK Broker
29th Nov 20237:00 amRNSUnaudited Financial Results
2nd Nov 20237:00 amRNSVardar Minerals Update
31st Oct 20237:00 amRNSRenewal of exploration licence at Kallak Project
27th Oct 20237:00 amRNSChinese Export Controls on Graphite Products
24th Oct 20237:00 amRNSDevelopment plan for the Kallak Iron Ore Project
26th Sep 20237:00 amRNSPreliminary Roadmap for the GAMP development
4th Sep 20237:00 amRNSGrafintec Strategy Update
31st Aug 20237:00 amRNSUnaudited Financial Results
16th Aug 20237:00 amRNSManagement changes at Jokkmokk Iron Mines AB
27th Jul 20237:00 amRNSCompromise Agreement with former CEO
20th Jul 20237:00 amRNSPFS results support GAMP development in GigaVaasa
10th Jul 20237:00 amRNSAppointment of Non-Executive Director
30th Jun 20237:00 amRNSExtension of Site Reservation in GigaVaasa Area
29th Jun 20239:00 amRNSResult of Annual General Meeting
28th Jun 20237:00 amRNSAppointment of Ed Bowie as Chief Executive Officer
6th Jun 20237:00 amRNSPosting of Annual Report and Notice of AGM
2nd Jun 20232:50 pmRNSAudited Results for year ended 31 December 2022
31st May 20237:00 amRNSUnaudited Results for Period Ended 31 March 2023
25th May 20237:00 amRNSRetraction Statement - Kallak
3rd May 20236:15 pmRNSBoard Changes
3rd May 20237:00 amRNSFastmarkets International Iron Ore 2023 Attendance
28th Apr 20237:00 amRNSCollaboration on Sustainable Graphite Technology
24th Apr 20237:00 amRNSMining Journal Select Interviews
3rd Apr 20237:00 amRNSMining Journal Select Interview
31st Mar 20237:00 amRNSTotal Voting Rights
16th Mar 20237:00 amRNSLast day of trading in Paid Subscribed SDRs
7th Mar 20237:00 amRNSRights Issue of SDRs raises additional funds
28th Feb 20237:15 amRNSBeowulf announces outcome of Capital Raise
28th Feb 20237:00 amRNSUnaudited Preliminary Financial Results
22nd Feb 20237:00 amRNSJokkmokk Iron – Kallak Update
21st Feb 20237:00 amRNSNew Site Reserved in the GigaVaasa Area
20th Feb 20231:27 pmRNSAktieportföljen Live Presentation
20th Feb 20239:05 amRNSSecond Price Monitoring Extn
20th Feb 20239:00 amRNSPrice Monitoring Extension
16th Feb 202310:20 amRNSReplacement: CEO Interview
15th Feb 20237:00 amRNSCEO Interview
13th Feb 20231:00 pmRNSInterview with Kurt Budge and Ulla Sandborgh
9th Feb 20237:01 amRNSPrimary Bid UK Offer - Subscription Period Begins
9th Feb 20237:00 amRNSSDR Rights Issue – Subscription Period Commences
2nd Feb 20231:30 pmRNSPublication of Prospectus
31st Jan 20234:40 pmRNSSecond Price Monitoring Extn
31st Jan 20234:35 pmRNSPrice Monitoring Extension
31st Jan 20232:05 pmRNSSecond Price Monitoring Extn
31st Jan 20232:00 pmRNSPrice Monitoring Extension
31st Jan 202311:05 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.