Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

Share Price is delayed by 15 minutes
Get Live Data
5.10    0.25 (5.15%)
Bid:
5.00
Ask:
5.20
Spread: 0.20 (4.00%)
Market Cap: £3.31m
AYM Live PriceLast checked at - London Stock Exchange

Intraday Anglesey Mining Share Chart

LIM Completes 2012 Exploration Program

18 Dec 2012 12:05

ANGLESEY MINING PLC - LIM Completes 2012 Exploration Program

ANGLESEY MINING PLC - LIM Completes 2012 Exploration Program

PR Newswire

London, December 17

Anglesey Mining plc LSE:AYM

17 December 2012

Labrador Iron Mines Completes 2012 Exploration Program

On track to complete resource estimates and resource conversions by March 31, 2013

Anglesey Mining plc ("Anglesey") is pleased to report that its 19.7% ownedassociate Labrador Iron Mines Holdings Limited ("LIM") has announced thecompletion of its 2012 exploration field program totalling 14,000 metres ("m")of diamond and reverse circulation ("RC") drilling. This represents thelargest exploration program ever completed by LIM. LIM's field crew is nowworking on several of its Schefferville area iron ore projects in bothNewfoundland and Labrador and Québec towards the completion of geological corelogging and sampling in early 2013 and anticipates several new and updatedNational Instrument 43-101 ("NI 43-101") compliant resource estimates on itsdeposits for completion by the end of its fiscal year.

Exploration Program Highlights

- During the 2012 field season, LIM completed 14,000 m of diamond and RCdrilling, a 40% increase over the planned 10,000 m.

- LIM is on track to complete by March 31, 2013, updated resource estimatesfor two major deposits: i) the James Deposit (currently in production),including the James South Extension and, ii) the Houston deposits (currently22.9 million tonnes of Measured and Indicated mineral resources - see pressrelease dated May 31, 2012).

- LIM is also on track to complete new and initial mineral resource estimateson the Malcolm deposit (nearby Houston), the historic crushed ore stockpilesin both Québec and Labrador and its first inferred mineral resource estimateon the Elizabeth Lake Taconite.

- Drill results at Malcolm-1 returned ore-type intersections (grading >50%Iron ("Fe")) in 11 of the 14 holes. Highlights include hole RC-M026, whichintersected 21 m at 60.8% Fe and hole RC-M018, which intersected 18 m at 58.8%Fe.

- During the 2012 exploration program, LIM also acquired geologicalinformation through the use of diamond drilling, which successfully recoveredcore samples for the first time. These samples will now provide better bulkdensity, geotechnical, metallurgical and hydrogeological interpretationsrequired for detailed mine planning.

"In our 2012 drilling season, our exploration team demonstrated theirexperience and competence by successfully delivering the most ambitiousprogram in LIM's history" commented Rod Cooper, LIM's President and COO. "As aresult, we are on track to complete several new and updated resource estimatesby the end of our fiscal year. Equally as important, the field informationcollected this year will not only contribute to the development anddelineation of our resource base, but will also provide valuable technicalinformation for strategic mine planning. Preparation work has now commencedfor another ambitious exploration program in fiscal 2014, scheduled tocommence in April 2013."

2012 Exploration Work Program Details

LIM used two exploration drill contractors during the 2012 field season: CaboDrilling Corp. carried out the RC drilling and Major Drilling GroupInternational Inc. carried out the diamond drill work. In previous seasons,LIM used RC drilling exclusively. The 2012 exploration program was successfulin generating core samples through the use of traditional diamond drilling, asignificant technical achievement. LIM obtained a high level (85%+) of corerecovery with the use of highly-skilled personnel and special drillingadditives and more than 8,300 m of HQ3 core (61.1 mm diameter) were recoveredby the end of the program in mid-November. Logging and core splitting isongoing on site and the exploration team is expected to complete its samplingin early 2013 to allow the inclusion of all new data and assay results in thenext series of mineral resource estimates.

LIM is anticipating new mineral resource estimations on the James Deposit(including the James South Extension), Malcolm-1, Houston 1, 2 and 3 and onthe historic crushed ore stockpiles. An initial mineral resource estimationwill also be provided on the Elizabeth Lake Taconite.

The 2012 exploration program also successfully tested a system for geophysicaldown-hole bulk density determinations in the James and Houston orebodies,which promises to yield a valuable contribution to the resource estimationefforts in the future.

Malcolm-1 Drill Results

The Malcolm-1 area lies approximately 3 kilometres northwest from the Houstonorebodies. Initial work on this property was carried out by LIM in 2011 andreturned ore-type intersections in 14 of 18 holes drilled (see to pressrelease dated May 31, 2012). In 2012, RC drilling on the Malcolm-1 propertyconsisted of 14 holes totalling 1,600 m and 11 of the 14 holes returnedore-type intersections. Figure 1 outlines the hole locations from the 2011 and2012 drill programs, as well as the historical resource previously identifiedby the Iron Ore Company of Canada ("IOC"). The historical (non NI 43-101compliant) mineral resource is 2.9 million tonnes grading 56.2@ Fe. Amanganese resource was also identified by IOC, totalling 422,000 tonnes at agrade of 51.4% Fe. LIM expects to report a new NI 43-101 compliant mineralresource for the Malcolm-1 deposit by the end of its fiscal year.

Table 1 below summarizes the intercepts from the 2012 drill program. Truethickness (ETT) is estimated using an average bedding dip of 45 degrees andvertical drilling dips for every RC hole.

Table 1: 2012 Malcolm-1 Drill Hole Intercepts

Hole_ID From To Length (m) ETT Fe Mn P SiO2 Al2O3 (m) (m) (m) (%) (%) (%) (%) (%)RC-M018-2012 3 21 18 13 58.8 1.9 0.06 3.3 0.5RC-M019-2012 3 36 33 23 52.0 0.5 0.08 12.4 2.5 42 51 9 6 58.9 0.8 0.07 5.9 0.5RC-M022-2012 21 33 12 8 50.1 0.0 0.01 27.8 0.0RC-M023-2012 12 27 15 11 54.1 0.1 0.05 16.5 0.0RC-M024-2012 24 30 6 4 50.6 1.3 0.09 15.8 0.1RC-M025-2012 18 30 12 8 53.1 0.1 0.06 16.6 0.1RC-M026-2012 42 75 33 23 56.2 0.5 0.06 12.1 0.2RC-M027-2012 27 36 9 6 56.7 0.6 0.04 14.8 0.1RC-M029-2012 33 54 21 15 50.1 0.2 0.06 26.0 0.4 99 108 9 6 52.2 4.9 0.04 17.5 0.0 120 129 9 6 52.3 4.0 0.17 13.8 0.8RC-M030-2012 93 102 9 6 51.1 0.4 0.03 25.0 0.7RC-M031-2012 147 156 9 6 51.0 3.1 0.12 10.5 2.7

Other Exploration Work Program Details

LIM was also able to increase the capacity of the mine site sample preparationfacilities to allow a better turnaround time in the receipt of assays fromoff-site laboratories. Actlabs remained as independent managers of the sitepreparation laboratory and all reduced and pulverized exploration samples wereairfreighted to its analytical laboratory in Ancaster, Ontario formulti-element X-ray fluorescent (XRF) assays including Actlabs internalQuality Assurance / Quality Control (QA/QC) procedures.

Ground Geophysical Surveys: Geosig Inc., a Quebec-based geophysical consultingfirm carried out a series of ground magnetometer and gravity surveys overseveral main targets including the Gagnon and Elizabeth taconites and over theJames, the Houston, the Malcolm-1 and the Howse direct shipping (DSO) iron oredeposits. The gravity survey covered 48 line-kilometres (line-km) and 1,130gravity stations were collected. The magnetic survey covered 31.4 line-km and40,326 measurements were recovered. These surveys have confirmed the validityof airborne gravity anomalies, located the extensions of known ore bodies andsuggested the presence of new exploration targets.

Table 2: 2012 Total Metres Drilled

A summary table for the 2012 exploration drill program is shown below:

Province Property Diamond RC Total Drilling Drilling Drilling (m) (m) (m)Newfoundland James Mine + South 2,086 - 2,086& Labrador (NL) Houston 1-2-3 4,504 1,468 6,121 NL Stockpiles - 2,552 2,552 Elizabeth Taconite 1,728 - 1,728Quebec (QC) Malcolm 1 - 1,599 1,599 TOTAL 8,318 5,619 13,937Experienced Technical Team

The exploration program has been carried out by LIM's experienced geologicalteam led by Chief Project Geologist Howard Vatcher, supported by SeniorResource Geologist Erick Chavez, Senior Field Geologist Tara Schrama, SeniorProject Geologist Adewara Odewande, Project Geologist Shawn Duquet, all underexecutive supervision of Michel Cormier, Vice President, Exploration.

For further details of figures 1: Compilation surface plan of Malcolm-1property and 2: Location Map for 2012 Exploration Program please visitLIM's website at www.labradorironmines.ca

About Anglesey Mining plc

Anglesey holds 19.7% of Toronto-listed Labrador Iron Mines Holdings Limited(TSX:LIM) which is producing high grade hematite from its James pit, one ofLIM's twenty direct shipping iron ore deposits in western Labrador andnorth-eastern Quebec. Production is targeted to grow from 1.7mt in 2012 to 2mtin 2013.

Anglesey is also carrying out exploration and development work at its 100%owned Parys Mountain zinc-copper-lead deposit in North Wales, UK where a JORCCode-compliant resource of 2.1mt at 6.9% combined base metals in the indicatedcategory and 4.1mt at 5.0% combined in the inferred category was published inNovember 2012.

For further information, please contact:Bill Hooley, Chief Executive +44 (0)1492 541981;Ian Cuthbertson, Finance Director +44 (0)1248 361333;Samantha Harrison / Klara Kaczmarek: RFC Ambrian +44 (0)20 3440 6800;Emily Fenton / Jos Simson: Tavistock Communications +44 (0)20 7920 3155
Date   Source Headline
13th Sep 20117:00 amPRNLIM added to S & P / TSX smallcap index
8th Sep 20119:11 amPRNResult of AGM
6th Sep 201111:00 amPRNLIM production update - second ore train operating
25th Aug 20111:42 pmPRNAnnual Report and Accounts
19th Aug 20113:00 pmPRNInterim Management Statement & LIM update
19th Aug 20112:12 pmPRNInterim Management Statement
15th Aug 201112:09 pmPRNLIM signs iron ore sales agreement
28th Jul 20117:00 amPRNFinal Results
5th Jul 201112:16 pmPRNTransfer of part of director's shareholding
30th Jun 201112:12 pmPRNLIM operations update & annual financial results
7th Jun 20112:42 pmPRNLIM agreement with Innu Matimekush
27th May 20111:23 pmPRNLIM mining & plant commissioning underway
19th May 20111:17 pmPRNChange of Adviser - Ambrian appointed as broker
28th Apr 20111:13 pmPRNLIM rail agreement with Genesee
27th Apr 20117:08 amPRNLIM equity financing C$110m completed
21st Apr 20112:30 pmPRNHolding(s) in Company
5th Apr 20115:03 pmPRNLIM equity financing of C$110 million
5th Apr 20113:56 pmPRNIssue of equity & director's share dealing
5th Apr 20112:55 pmPRNApplication for Block Listing
5th Apr 201110:02 amPRNEquity financing for Labrador Iron
29th Mar 201112:15 pmPRNLIM's Houston deposit shows increased resources
18th Mar 20117:00 amPRNLIM technical report on iron ore projects
10th Mar 201112:26 pmPRNLIM Signs Rail Transportation Agreement
4th Mar 20115:14 pmPRNNew resource estimate at LIM's Denault deposit
25th Feb 20117:00 amPRNLIM Railway Agreement
18th Feb 20115:02 pmPRNInterim Management Statement
15th Feb 20113:52 pmPRN3rd Quarter Results for LIM and outlook
11th Feb 20113:05 pmPRNDrilling Report - LIM’s Houston Deposits
10th Jan 20118:01 amPRNIssue of Equity - share placing
21st Dec 20102:06 pmPRNLIM’s Mine Construction Nearing Completion
20th Dec 201012:11 pmPRNLIM signs Agreement with Uashaunnuat Innu
26th Nov 20107:00 amPRNHalf-Yearly Report
26th Nov 20107:00 amPRNHalf-Yearly Report
15th Nov 201011:23 amPRNHalf-yearly Report LIM
22nd Oct 201012:25 pmPRNLIM on Target to Complete Plant Construction by Year End
24th Sep 20103:42 pmPRNResult of AGM and Total Voting Rights
20th Sep 20104:23 pmPRNHolding(s) in Company
16th Sep 20107:00 amPRNTrading Statement - Labrador AGM
14th Sep 20103:00 pmPRNTrading Statement - Labrador Iron Operations Approved
10th Sep 20107:00 amPRNTrading Statement - Agreement with Naskapi Nation
3rd Sep 201010:00 amPRNTrading Statement - Labrador barriers to be removed
27th Aug 201011:53 amPRNInterim Management Statement
16th Aug 201012:05 pmPRNTrading Statement - Labrador Q1 results and update
29th Jul 20107:00 amPRNon Labrador Iron operations
22nd Jul 20101:32 pmPRNFinal Results
12th May 20094:41 pmRNSSecond Price Monitoring Extn
12th May 20094:35 pmRNSPrice Monitoring Extension
7th Nov 20077:01 amRNSNotice of AGM and EGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.