focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.50
Bid: 1.40
Ask: 1.60
Change: 0.00 (0.00%)
Spread: 0.20 (14.286%)
Open: 1.50
High: 1.60
Low: 1.50
Prev. Close: 1.50
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Diamond drilling recommences at Parys Mountain

11 Jan 2012 07:00

Anglesey Mining plc LSE:AYM

11 January 2012

Diamond drilling recommences at Parys Mountain

* Initial stage of four holes * Potentially a further six to eight holes depending on the initial results * Target is shallow extensions of the Engine zone close to the existing Morris Shaft * Results expected to contribute to a review of the mining and production options * Commercial options to enhance shareholder value will also be reviewed

Anglesey Mining plc is pleased to announce that it has recommenced diamond drilling at Parys Mountain in a programme designed to identify the extent of near surface locations of the Engine Zone mineralisation.

Parys Mountain which is 100% owned by Anglesey is a copper-zinc-lead project with historical resources currently in excess of 7 million tonnes at over 9% combined metal.

As previously announced on 2 December 2011 an Induced Polarisation (IP) geophysical survey and an associated Deep Overburden (DOB) geochemical survey were conducted during December. The results of these surveys have now been received and analysed and have provided good guidance for the location of holes for the on-going drilling programme.

The first hole in the initial stage of drilling has now commenced and is progressing satisfactorily. This hole has a target depth of 220 to 250 metres. The initial stage will consist of four holes totalling in excess of 800 metres of drilling and is expected to be completed in five to six weeks. Subject to results obtained from these first holes it is planned to drill a further six to eight holes for an additional 1,200 metres of drilling. These second stage shallower holes are likely to be located between the current holes and the target area identified from the IP and DOB surveys.

The drilling is targeting the potential sub-outcrop location of the Engine Zone mineralisation which has been shown to be a major resource bearing structure around the bottom of the Morris Shaft at some 300 to 400 metres below surface. Previous exploration particularly during the last drilling programme at Parys Mountain in 2007 and 2008 traced the Engine Zone upwards to a depth of about 200 metres.

Providing the existence of the Engine Zone at these shallower depths can be defined in sufficient size and continuity it could enhance the development of the nearby White Rock zone as a relatively small decline based mining operation. Planning permissions for such an operation and for an associated processing plant remain in place.

As the results from the current phase of drilling are received a review of the mining and production options available for the White Rock and potential shallow Engine Zone resources will be carried out. This review will be designed to identify the optimum mining and processing routes available and to generate capital and operating cost estimates at a preliminary feasibility study level.

Additionally a broader review of the overall potential of the Parys Mountain area will be conducted and in conjunction with White Rock/shallow Engine Zone study will consider the various commercial options available to enhance the value of Parys Mountain for shareholders.

Subject to satisfactory and timely completion of both phases of the current drilling programme and receipt of analytical data it is expected that both these reviews will be completed during the second quarter of 2012.

About Anglesey Mining plc

Anglesey Mining with its LSE main board listing holds a 33% interest in Labrador Iron Mines and owns 100% of Parys Mountain in North Wales where there is an historical resource in excess of 7 million tonnes at over 9% combined copper, lead and zinc.

For further information:Bill Hooley, Chief Executive 01492 541981Ian Cuthbertson, Finance director 01248 361333Ambrian Partners, Samantha Harrison/Klara Kaczmarek 020 7634 4700Tavistock Communications, Emily Fenton/Jos Simson 020 7920 3155

XLON
Date   Source Headline
15th Nov 201112:05 pmPRNLIM second quarter results and second iron ore shipment
26th Oct 201112:31 pmPRNHolding(s) in Company
4th Oct 20117:00 amPRNFirst shipment of LIM iron ore sails to China
23rd Sep 20118:30 amPRNLIM reviews mine start-up at its AGM
13th Sep 20117:00 amPRNLIM added to S & P / TSX smallcap index
8th Sep 20119:11 amPRNResult of AGM
6th Sep 201111:00 amPRNLIM production update - second ore train operating
25th Aug 20111:42 pmPRNAnnual Report and Accounts
19th Aug 20113:00 pmPRNInterim Management Statement & LIM update
19th Aug 20112:12 pmPRNInterim Management Statement
15th Aug 201112:09 pmPRNLIM signs iron ore sales agreement
28th Jul 20117:00 amPRNFinal Results
5th Jul 201112:16 pmPRNTransfer of part of director's shareholding
30th Jun 201112:12 pmPRNLIM operations update & annual financial results
7th Jun 20112:42 pmPRNLIM agreement with Innu Matimekush
27th May 20111:23 pmPRNLIM mining & plant commissioning underway
19th May 20111:17 pmPRNChange of Adviser - Ambrian appointed as broker
28th Apr 20111:13 pmPRNLIM rail agreement with Genesee
27th Apr 20117:08 amPRNLIM equity financing C$110m completed
21st Apr 20112:30 pmPRNHolding(s) in Company
5th Apr 20115:03 pmPRNLIM equity financing of C$110 million
5th Apr 20113:56 pmPRNIssue of equity & director's share dealing
5th Apr 20112:55 pmPRNApplication for Block Listing
5th Apr 201110:02 amPRNEquity financing for Labrador Iron
29th Mar 201112:15 pmPRNLIM's Houston deposit shows increased resources
18th Mar 20117:00 amPRNLIM technical report on iron ore projects
10th Mar 201112:26 pmPRNLIM Signs Rail Transportation Agreement
4th Mar 20115:14 pmPRNNew resource estimate at LIM's Denault deposit
25th Feb 20117:00 amPRNLIM Railway Agreement
18th Feb 20115:02 pmPRNInterim Management Statement
15th Feb 20113:52 pmPRN3rd Quarter Results for LIM and outlook
11th Feb 20113:05 pmPRNDrilling Report - LIM’s Houston Deposits
10th Jan 20118:01 amPRNIssue of Equity - share placing
21st Dec 20102:06 pmPRNLIM’s Mine Construction Nearing Completion
20th Dec 201012:11 pmPRNLIM signs Agreement with Uashaunnuat Innu
26th Nov 20107:00 amPRNHalf-Yearly Report
26th Nov 20107:00 amPRNHalf-Yearly Report
15th Nov 201011:23 amPRNHalf-yearly Report LIM
22nd Oct 201012:25 pmPRNLIM on Target to Complete Plant Construction by Year End
24th Sep 20103:42 pmPRNResult of AGM and Total Voting Rights
20th Sep 20104:23 pmPRNHolding(s) in Company
16th Sep 20107:00 amPRNTrading Statement - Labrador AGM
14th Sep 20103:00 pmPRNTrading Statement - Labrador Iron Operations Approved
10th Sep 20107:00 amPRNTrading Statement - Agreement with Naskapi Nation
3rd Sep 201010:00 amPRNTrading Statement - Labrador barriers to be removed
27th Aug 201011:53 amPRNInterim Management Statement
16th Aug 201012:05 pmPRNTrading Statement - Labrador Q1 results and update
29th Jul 20107:00 amPRNon Labrador Iron operations
22nd Jul 20101:32 pmPRNFinal Results
12th May 20094:41 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.