Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAscent Resources Regulatory News (AST)

Share Price Information for Ascent Resources (AST)

Share Price is delayed by 15 minutes
Get Live Data
0.50    0.00 (0.00%)
Bid:
0.45
Ask:
0.55
Spread: 0.10 (22.222%)
Market Cap: £4.16m
AST Live PriceLast checked at - London Stock Exchange

Intraday Ascent Resources Share Chart

Drilling Update

29 Jan 2007 07:01

Ascent Resources PLC29 January 2007 Ascent Resources plc / Epic: AST / Index: AIM / Sector: Oil and Gas Ascent Resources plc ("Ascent" or "the Company") To Re-Enter Anagni-1 Well Following Oil Discovery Ascent Resources plc, the AIM-traded oil and gas exploration and productioncompany, has temporarily completed the Anagni-1 well as an oil discovery afterlog and core data indicated that the well has drilled into an oil reservoir.Ascent with a 70% interest and its operating partner Pentex Italia Limited (30%)is drilling the Anagni-1 well in the Frosinone Exploration Permit which islocated in the Latina Valley some 80km east-south-east of Rome. Anagni-1 was designed as a stratigraphic (geological research) well to test forthe presence of the Carbonate platform of the Northern Apennine Thrust. TheCarbonate platform was encountered at 865m and after drilling a further 40m into the limestone, oil shows were observed in the cuttings. Total lostcirculation at 921m confirmed the presence of reservoir quality rock and a 5mcore that was then taken below the lost circulation zone was recovered with oilpresent in open fractures. After coring, the well was drilled down to 971mstill in the carbonates and electric logs confirmed the presence of fracturesthroughout this section. The well has been temporarily completed to allow for the procurement ofadditional equipment to enable the well to be deepened to c.2,000m toinvestigate the complete Carbonate sequence and also for the planning andpreparation of the testing operations necessary to evaluate this oil reservoir. In the meantime, the drilling rig will be moved to Spain to drill the Hontomin-4appraisal well in the Huermeces Exploration Permit (Ascent 50%). Ascent Resources Managing Director Jeremy Eng said, "Finding the top of theoil-prone Carbonates close to our anticipated depth and much shallower than inthe nearby Gavignano-1 well was encouraging. Then to drill reservoir qualityrocks containing oil is a fine result. We are going to deepen Anagni-1 toquantify this discovery and will proceed as soon as suitable equipment has beensourced." The information contained in this release has been reviewed and approved by DrEloi Dolivo, Ascent's Exploration Manager and Dr Clive Ninnes, Ascent'sEngineering Manager. Dr Dolivo (member of the AAPG) and Dr Ninnes (member ofSPE) have 26 and 25 years experience respectively in the evaluation ofhydrocarbon resources. * * ENDS * * For further information visit www.ascentresources.co.uk or contact: Jeremy Eng Ascent Resources plc Tel: 020 7251 4905Hugo de Salis St Brides Media & Finance Ltd Tel: 020 7242 4477 Notes Ascent Resources has a portfolio of 20 oil and gas projects across fivecountries in Europe. The projects are onshore in Italy, Switzerland, Hungary andSpain and offshore Netherlands. Ascent is at present drilling a programme ofsix exploration wells. Two have already been drilled in Hungary, one of whichwas a gas discovery. The Anagni-1 well, first of two Italian wells, has beentemporarily completed for future deepening and testing and two wells arescheduled for Spain. Later in 2007, two more gas exploration wells are to bedrilled in Hungary, high impact gas exploration wells are planned in the PoValley in Italy, and one well in Switzerland, subject to permitting and rigavailability. Ascent operates Spain's only onshore oilfield where production currentlyaverages at least 100 barrels of oil per day. With the stable European gas market, Ascent's portfolio favours gas over oiland, with the exception of the Netherlands, all of its projects are locatedonshore where operating and development costs are substantially lower than theyare offshore. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
30th Sep 20107:02 amRNSInterim Results
29th Sep 20107:00 amRNSFurther ?3m from Swisss Disposal
23rd Sep 20107:00 amRNSAcquires Further Concessions in Hungary
23rd Sep 20107:00 amRNSChange of Adviser
15th Sep 20107:00 amRNSHolding(s) in Company
14th Sep 20107:00 amRNSDirectorate Change
15th Jul 20107:00 amRNSIncrease in Interest in North Sea Blocks M10/M11
2nd Jul 20107:00 amRNSDirector's Dealing
1st Jul 20107:00 amRNSIncrease in Interest in Petisovci Project
28th Jun 20101:24 pmRNSResult of AGM
16th Jun 20109:49 amRNSNotice of AGM and Posting of Report and Accounts
7th Jun 20101:00 pmRNSPen?szlek Production Update
21st May 201012:30 pmRNSNew Presentation
18th May 20107:00 amRNSFinal Results
11th May 20107:00 amRNSPEN-101 Completion
4th May 20102:00 pmRNSNew Presentation on Website
28th Apr 20107:00 amRNSPartner Withdrawal from Po Valley Permit
23rd Apr 20105:00 pmRNSHolding(s) in Company
22nd Apr 20107:00 amRNSSale of Swiss Subsidiary for ?8m with Rights
19th Apr 20107:00 amRNSOperations Update for Italy and Hungary
1st Apr 20107:00 amRNSPEN-106 Drilling Update
26th Mar 20102:35 pmRNSHolding(s) in Company
25th Mar 20107:00 amRNSResults of 3-D Seismic for the Petisovci Project
23rd Mar 20107:00 amRNSHungarian production and testing update
22nd Mar 201012:44 pmRNSHolding(s) in Company
18th Mar 20107:00 amRNSDirector/PDMR Shareholding
16th Mar 20107:00 amRNSIssue of Equity
12th Mar 201012:00 pmRNSResult of EGM
10th Mar 20107:00 amRNSHungarian testing and production update
22nd Feb 20107:00 amRNSDisposes of interest in Perazzoli Drilling
9th Feb 20108:02 amRNSPEN-101 Drilling Commences
2nd Feb 20107:00 amRNSRe-drilling of Fontana-1
19th Jan 20107:00 amRNSIssue of Options
22nd Dec 20097:00 amRNSFontana-1 Drilling Update
15th Dec 20092:02 pmRNSOperations Update - Replacement
14th Dec 20093:30 pmRNSResult of EGM
14th Dec 20099:30 amRNSOperations Update
8th Dec 20098:15 amRNSRe San Severina Agreement
4th Dec 20097:00 amRNSPeneszlek Operations Update
27th Nov 20097:00 amRNSPlacing to raise ?6m and notice of EGM
11th Nov 20097:00 amRNSAppointment of Broker and Nominated Adviser
6th Nov 20097:00 amRNSOptions Issue
2nd Nov 20097:00 amRNSWell Completion and Update
28th Oct 20097:00 amRNSFontana-1 Drilling Commences
19th Oct 200912:48 pmRNSHolding(s) in Company
12th Oct 200910:00 amRNSIssue of Equity and Facility Limit Increase
28th Sep 20097:00 amRNSPEN-104AA Sidetrack
17th Sep 200910:00 amRNSGH-1 Completion and Test Results
15th Sep 20097:00 amRNSPEN-105 Test Completed
9th Sep 20097:00 amRNSInterim Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.