If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Resources Limited Regulatory News (ARS)

Share Price Information for Asiamet Resources Limited (ARS)

Share Price is delayed by 15 minutes
Get Live Data
1.60    0.035 (2.24%)
Bid:
1.55
Ask:
1.65
Spread: 0.10 (6.452%)
Market Cap: £54.30m
ARS Live PriceLast checked at - London Stock Exchange

Intraday Asiamet Resources Limited Share Chart

BKM Copper Project BFS Update

18 Dec 2018 08:13

RNS Number : 8012K
Asiamet Resources Limited
18 December 2018
 

BKM Copper Project BFS Update

Asiamet Resources is pleased to advise that the 4,500 metre Resource infill and geotechnical drilling program being undertaken to enhance the Beruang Kanan Main Copper Project ("BKM" or "the project") bankable feasibility study ("BFS") is well underway with initial results anticipated shortly.

As previously announced, the planned drilling and associated study program aims to better optimise the mine design and improve the overall economics and robustness of the Bankable Feasibility Study (BFS) for the BKM copper project in preparation for project financing.

A small group of highly experienced resource, geotechnical and mine engineering consultants were re-engaged in early November to oversee the collection, integration and interpretation of the additional data required to supplement current studies. Along with these technical consultants an external drilling contractor has also recently been engaged to fast-track the drilling program.

Asiamet's own two fully-owned drill rigs were mobilised during late November with a total of four holes (494.6 metres) completed to 15 December 2018. Core samples have been sent to laboratories for assaying and a further three drill holes are in progress.

In order to expedite the current drill programme, an additional two rigs have been sourced from an external contractor with significant prior experience on the BKM project. Drills have been mobilised to site and will commence drilling shortly.

Initial drilling is focussed on two key mineralised zones within and as extensions of the current open pit design as shown in Figure 1 linked below, where an upgrade in Resource confidence from the Inferred category to the Indicated and Measured category (JORC 2012) is targeted.

Resources upgraded in the current drill program will then be economically assessed for potential conversion to Ore Reserves. Increasing Ore reserves available for integration into mine planning and design optimisation studies is expected to increase mine life and enhance overall robustness of the project from a financing perspective.

Link to image of Proposed BKM pit shell with proposed zones for drilling: http://asiametresources.com/assets/img/ars2_171218.png

Corporate

In early December, meetings were held with a number of potential strategic investors and partners in Jakarta. The level of interest in Asiamet's portfolio of assets remains high and several groups have signed confidentiality agreements and are actively engaged in technical due diligence. Discussions with several other parties are continuing with a view to upscaling diligence activity early in the new year.

 

Peter Bird, Asiamet's Chief Executive Officer commented:

"Despite the general poor market sentiment for exploration and development companies at present, Asiamet believes that it's portfolio of high-quality assets is significantly undervalued and the Company remains extremely focussed on progressing the infill and geotechnical drilling programs required to enhance the economic robustness of the BKM BFS at a time of compelling near term supply-demand fundamentals for copper.

This additional piece of study work is expected to significantly enhance the robustness of the BKM copper project and positively impact outcomes from both a project financing and strategic partnering perspective. We look forward to providing results and further updates from the drilling and study program as the work programs progress over the coming weeks"

 

ON BEHALF OF THE BOARD OF DIRECTORS

Peter Bird, Deputy Chairman and CEO

For further information, please contact:

-Ends-

Peter BirdDeputy Chairman and CEO, Asiamet Resources LimitedTelephone: +61 3 8644 1300Email: peter.bird@asiametresources.com

 

Tony ManiniExecutive Chairman, Asiamet Resources LimitedTelephone: +61 3 8644 1300Email: tony.manini@asiametresources.com

 

FlowComms Limited

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha@flowcomms.com

Asiamet Resources Nominated Adviser

RFC Ambrian Limited

Andrew Thomson / Stephen Allen

Telephone: +61 8 9480 2500

Email: Andrew.Thomson@rfcambrian.com / Stephen.Allen@rfcambrian.com 

 

Berenberg

Matthew Armitt, Sara MacGrath

Telephone: +44 20 3753 3142

Email: Matthew.Armitt@berenberg.com

 

Liberum

Clayton Bush, Kane Collings

Telephone: +44 7773 322679

 

Optiva Securities Limited

Christian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

 

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterised by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

 

This announcement contains inside information as stipulated under the Market Abuse Regulations (EU) no. 596/2014 ("MAR").

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLVVLBFVLFFFBF
Date   Source Headline
9th Oct 201712:26 pmEQSAsiamet Resources Ltd.: Grant of Options
6th Oct 201711:16 amEQSBKM Copper Project Feasibility Study Advancing
3rd Oct 20177:02 amEQSAsiamet Resources Ltd.: Asiamet Drilling Expands High Grade Zinc Rich Polymetallic Mineralisation at BKZ
15th Sep 20178:57 amRNSHalf-Year Results 2017 with Management Comments
12th Oct 20167:00 amPRNDirector/PDMR Shareholding
12th Oct 20167:00 amPRNDrilling/Production Report
1st Apr 20157:00 amBUSAGM Statement
15th Jan 20157:00 amBUSAcquisition
29th Dec 20147:00 amBUSIssue of Equity
28th Nov 20147:00 amBUS3rd Quarter Results
26th Nov 20147:00 amBUSKalimantan Gold Positions for Growth
5th Nov 20147:00 amBUSKalimantan Gold Files Technical Report for the Beruang Kanan Prospect, KSK CoW, Indonesia
8th Oct 20147:00 amBUSKalimantan Gold Options Granted
3rd Oct 20145:24 pmBUSTransaction in Own Shares
1st Oct 20147:00 amBUSTransaction in Own Shares
26th Sep 20147:00 amBUSKalimantan Gold Announces Maiden Inferred Mineral Resource Estimate for Beruang Kanan Prospect, KSK CoW, Indonesia
1st Sep 20147:00 amBUSHalf-yearly Report
31st Jul 20147:00 amBUSKSK Copper Project Update
4th Jul 20146:24 pmBUSAGM Statement
3rd Jul 20147:00 amBUSAGM Statement
2nd Jun 20147:00 amBUS1st Quarter Results
16th May 20147:00 amBUSNotice of AGM
30th Apr 20147:00 amBUSAnnual Financial Report
16th Apr 20147:00 amBUSKalimantan Gold Board Changes
26th Mar 20147:00 amBUSKalimantan Gold - Jelai Gold Project
2nd Jan 20147:00 amBUSKalimantan Gold to Regain 100% Control of KSK CoW, Indonesia
10th Dec 20137:00 amBUSKalimantan Gold Clarifies Previous Disclosure Following a Preliminary Technical Disclosure Review By BCSC
29th Nov 20137:00 amBUS3rd Quarter Results
27th Nov 20137:00 amBUSKalimantan Gold Files NI43-101 Report for Jelai Project
12th Nov 20137:00 amBUSKSK Copper Project Update
8th Oct 20137:00 amBUSKalimantan Gold Appoints New CFO
6th Sep 20137:00 amBUSKalimantan’s Chairman, Peter Pollard, increases share position
29th Aug 20137:00 amBUSHalf-yearly Report
22nd Aug 20137:00 amBUSKalimantan Gold - KSK Copper Project Update
4th Jul 20137:00 amBUSKalimantan Gold Board Changes and Option Grant
10th Jun 20137:00 amBUSKSK Copper Project Update
29th May 20137:00 amBUS1st Quarter Results
24th May 20137:00 amBUSNotice of AGM
9th May 20137:00 amBUSKalimantan Gold – New Permit Extends Drilling to All Targeted Areas on the KSK Contract of Work; Progress Made at Jelai
29th Apr 20137:00 amBUSAnnual Financial Report
15th Apr 20137:00 amBUSKalimantan Gold Board Changes and Advance Notice Policy Adopted
19th Feb 20137:00 amBUSKSK Copper Project - High Grade Drilling Results and Major 2013 Drill Program Underway
15th Nov 20127:00 amBUS3rd Quarter Results
14th Nov 20127:00 amBUSDirector/PDMR Shareholding
29th Oct 20127:00 amBUSKSK Copper Project Achieves Significant Milestone
17th Sep 20127:00 amBUSNew Gold-Silver Intersections at the Jelai Project
28th Aug 20127:00 amBUSHalf-yearly Report
1st Aug 20127:00 amBUSKalimantan Gold Announces Director Appointment
13th Jun 20127:00 amBUSChange of Adviser
29th May 20127:00 amBUSKalimantan's First Quarter Results 2012

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.