Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArkle Res Regulatory News (ARK)

Share Price Information for Arkle Res (ARK)

Share Price is delayed by 15 minutes
Get Live Data
0.80    0.00 (0.00%)
Bid:
0.75
Ask:
0.85
Spread: 0.10 (13.333%)
Market Cap: £12.76m
ARK Live PriceLast checked at - London Stock Exchange

Intraday Arkle Res Share Chart

Drilling Update

11 Nov 2008 07:00

RNS Number : 8583H
Connemara Mining Company plc
11 November 2008
 



11th November 2008

Connemara Mining Company Plc

Significant Additional Zinc and Lead Mineralisation at StoneparkLimerick

Highlights:

Significant zinc & lead mineralisation in two additional holes at Stonepark in Limerick

The mineralised zone now extends for at least 300 metres

Drilling continues

The Directors of Connemara Mining Company Plc ("Connemara" or "the Company") (AIM:CON.L) are pleased to provide an update on their zinc/lead discovery at Stonepark, part of the Monaster block,  County LimerickIreland. The property is under option to and being operated by Teck Cominco Ireland, a subsidiary of Teck Cominco Limited who is earning a 75% interest by spending C$3 million over 4 years.

Assays were received for two more holes at Stonepark (holes 2638-16 and 2638-17). Both holes intersected significant sulphide mineralisation and extend the zone of known mineralisation approximately 100 metres to the north and northeast of the discovery hole (Table 1 below). Drilling is ongoing at Stonepark and the ore zone remains open.

Hole 2638-16, located 120 metres northeast of 2638-4, intersected a thick (>50 metres) zone of black matrix breccia containing a number of sphalerite-rich zones.

Hole 2638-17 (angled -85°), located 90 metres north-northwest of hole 2638-4, intersected a 1 metre zone of massive sulphide within a broader zone of black matrix breccia containing 27.69% zinc and 12% lead.

Drilling to date indicates that the Stonepark mineralised zone extends for more than 300 metres in a northwest-southeast direction, remaining open and highly prospective to the north and south.

Table 1: New Assay Results from Stonepark Drilling

Hole ID

From (m)

To (m)

Thickness (m)

Zinc %

Lead %

2638-16

348.25

361.9

13.65

2.23

0.12

including

2638-16

349.05

350.5

1.45

4.35

0.24

2638-16

354.2

357.5

3.3

4.29

0.14

2638-16

360.9

361.9

1.0

4.92

0.01

2638-17

327.45

328.45

1.0

27.69

12.00

  Of the thirteen holes completed to date in 2008 at Stonepark, four (holes 7, 8, 16 and 17) have  high grade intersections, another three holes have low grade/minor zinc mineralisation (holes 6, 20 and 23), another four holes have well developed black matrix breccia with trace mineralisation (holes 9, 10, 13, and 14) and two holes (11 and 19) are barren. Hole 21 is in progress. Hole 4, reported on in November 2007, was a discovery holeTable 2 shows resource grade results.

Table 2: Assay Results from Stonepark Drilling

Hole ID

From (m)

To (m)

Thickness (m)

Est. True Thickness (m)

 Zinc %

Lead %

2638-4

372.75

374.05

1.30

1.30

6.85

0.30

2638-4

374.05

376.1

2.05

2.05

0.30

2638-4

376.1

380.1

4.00

4.00

11.62

3.46

including:

2638-4

378.95

380.1

1.15

1.15

28.61

4.17

2638-6

460.7

461.15

0.45

0.45

2.26

1.54

2638-7

394.85

410.2

15.35

14.9

3.25

0.33

including:

2638-7

394.85

397.7

2.85

2.8

12.18

0.75

2638-8

550.1

557.45

7.35

6.5

5.02

1.17

including:

2638-8

556.2

557.45

1.25

1.1

16.19

3.07

2638-16

348.25

361.9

13.65

13.65

2.23

0.12

including:

2638-16

349.05

350.5

1.45

1.45

4.35

0.24

2638-16

354.2

357.5

3.3

3.3

4.29

0.14

2638-16

360.9

361.9

1.0

1.0

4.92

0.01

2638-17

327.45

328.45

1.0

0.95

27.69

12.00

Drill testing of a number of new regional targets and IP geophysical surveys are also ongoing on the Monaster licence block to the south, with the aim of finding additional mineralised zones along the prospective Limerick Trend.

John Teeling, Chairman of Connemara Mining, commented:

"Again, I am pleased to report high quality zinc/lead results from two additional holes at our Stonepark discovery. The high grade mineralised zone has now been traced for 300 metres and remains open.

This very early stage exploration has been consistently successful. We know we have found something - the ongoing drilling and assaying are designed to fully define and value what we are dealing with."

This release has been approved by Graham Reid, P. Geo., Director BRG Technical Services, consultants to Connemara. Mr. Reid has 30 years mineral exploration and evaluation experience.

Enquiries:

Connemara Mining Company Plc

John Teeling, Chairman

 +353 (0)1 833 2833

Jim Finn, Financial Director

Blue Oar Securities Plc

John Wakefield

+44 (0) 117 933 0020

Simon Moynagh

College Hill

Paddy Blewer

+44 (0) 207 457 2020

Nick Elwes

www.connemaramining.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCILFSRLALILIT
Date   Source Headline
15th Aug 20177:00 amRNSPlacing
14th Aug 201712:14 pmRNSSenior Management Appointment
24th Jul 20171:37 pmRNSHighlights of Statements Made at the AGM
10th Jul 20179:18 amRNSHolding in Company
28th Jun 201710:09 amRNSHolding in Company
28th Jun 20177:00 amRNSFinal Results for the Year Ended 31 December 2016
13th Jun 20174:41 pmRNSHolding in Company
26th Apr 20177:00 amRNSFocus on Inishowen Gold Prospect
25th Apr 20172:49 pmRNSHolding(s) in Company
13th Apr 201710:07 amRNSHolding in Company
31st Mar 20177:00 amRNSFive New Lead/Zinc Properties in Irish Midlands
21st Mar 20173:50 pmRNSOptions Granted
8th Feb 20171:05 pmRNSExploration Update
24th Jan 20172:58 pmRNSRise in Volume and Price
24th Jan 201710:44 amRNSNew Technical Director joins the Board
23rd Jan 20174:44 pmRNSHolding(s) in Company
4th Nov 20167:00 amRNSOldcastle Drilling
29th Sep 20167:00 amRNSInterim Results
6th Sep 20167:00 amRNSNew Prospecting Licences in Cork
3rd Aug 20167:00 amRNSIntercepts 4.82m at 5.48g/t gold at Inishowen
28th Jul 201610:55 amRNSHighlights of the Chairman's Statement from AGM
27th Jul 20167:00 amRNSNew Gold System Identified in Inishowen Drilling
28th Jun 20168:55 amRNSFinal Results for the Year Ended 31 December 2015
31st May 201610:37 amRNSDrilling In Inishowen, Donegal
27th May 201612:19 pmRNSHolding(s) in Company
23rd May 20167:00 amRNSInishowen Second Phase Drill Programme Begins
13th May 20169:30 amRNSFundraising to Finance Donegal Gold Drilling
4th May 20165:38 pmRNSShareholder Notification
14th Apr 20167:00 amRNSDrilling, Inishowen Gold Licences
7th Apr 20167:00 amRNSGold Results, Inishowen Licences, Donegal
26th Feb 20167:00 amRNSDrilling for Gold in Inishowen
25th Feb 20167:00 amRNSResults of Two Exploration Holes
21st Dec 20157:00 amRNSUpdate on Oldcastle Drilling
11th Nov 20157:00 amRNSTrenching Results, Inishowen Gold Licences
16th Oct 20157:00 amRNSOldcastle Block Drilling
15th Sep 20157:00 amRNSInterim Statement for period ended 30 June 2015
10th Sep 201511:13 amRNSHolding(s) in Company
24th Aug 20157:00 amRNSInishowen Gold Licences Update
6th Jul 201511:30 amRNSResult of AGM
26th Jun 20157:00 amRNSInishowen Exploration Update
3rd Jun 20157:00 amRNSFinal Results for the Year Ended 31 December 2014
28th May 20157:00 amRNSInitial Results, Inishowen Gold Licences
1st May 201511:15 amRNSChange of Adviser
14th Apr 20157:00 amRNSFive New Prospecting Licences
10th Dec 20147:00 amRNSAppointment of Director
26th Nov 20147:00 amRNSOldcastle Exploration Update
10th Nov 20147:00 amRNSDrilling Starts on Oldcastle Block
13th Oct 201411:28 amRNSAppointment of Joint Broker
18th Sep 20147:00 amRNSFundraising and Issue of Equity
17th Sep 20147:00 amRNSInterim Statement for period ended 30 June 2014

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.