Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArkle Res Regulatory News (ARK)

Share Price Information for Arkle Res (ARK)

Share Price is delayed by 15 minutes
Get Live Data
0.70    0.00 (0.00%)
Bid:
0.65
Ask:
0.75
Spread: 0.10 (15.385%)
Market Cap: £11.17m
ARK Live PriceLast checked at - London Stock Exchange

Intraday Arkle Res Share Chart

Drilling Update

11 Nov 2008 07:00

RNS Number : 8583H
Connemara Mining Company plc
11 November 2008
 



11th November 2008

Connemara Mining Company Plc

Significant Additional Zinc and Lead Mineralisation at StoneparkLimerick

Highlights:

Significant zinc & lead mineralisation in two additional holes at Stonepark in Limerick

The mineralised zone now extends for at least 300 metres

Drilling continues

The Directors of Connemara Mining Company Plc ("Connemara" or "the Company") (AIM:CON.L) are pleased to provide an update on their zinc/lead discovery at Stonepark, part of the Monaster block,  County LimerickIreland. The property is under option to and being operated by Teck Cominco Ireland, a subsidiary of Teck Cominco Limited who is earning a 75% interest by spending C$3 million over 4 years.

Assays were received for two more holes at Stonepark (holes 2638-16 and 2638-17). Both holes intersected significant sulphide mineralisation and extend the zone of known mineralisation approximately 100 metres to the north and northeast of the discovery hole (Table 1 below). Drilling is ongoing at Stonepark and the ore zone remains open.

Hole 2638-16, located 120 metres northeast of 2638-4, intersected a thick (>50 metres) zone of black matrix breccia containing a number of sphalerite-rich zones.

Hole 2638-17 (angled -85°), located 90 metres north-northwest of hole 2638-4, intersected a 1 metre zone of massive sulphide within a broader zone of black matrix breccia containing 27.69% zinc and 12% lead.

Drilling to date indicates that the Stonepark mineralised zone extends for more than 300 metres in a northwest-southeast direction, remaining open and highly prospective to the north and south.

Table 1: New Assay Results from Stonepark Drilling

Hole ID

From (m)

To (m)

Thickness (m)

Zinc %

Lead %

2638-16

348.25

361.9

13.65

2.23

0.12

including

2638-16

349.05

350.5

1.45

4.35

0.24

2638-16

354.2

357.5

3.3

4.29

0.14

2638-16

360.9

361.9

1.0

4.92

0.01

2638-17

327.45

328.45

1.0

27.69

12.00

  Of the thirteen holes completed to date in 2008 at Stonepark, four (holes 7, 8, 16 and 17) have  high grade intersections, another three holes have low grade/minor zinc mineralisation (holes 6, 20 and 23), another four holes have well developed black matrix breccia with trace mineralisation (holes 9, 10, 13, and 14) and two holes (11 and 19) are barren. Hole 21 is in progress. Hole 4, reported on in November 2007, was a discovery holeTable 2 shows resource grade results.

Table 2: Assay Results from Stonepark Drilling

Hole ID

From (m)

To (m)

Thickness (m)

Est. True Thickness (m)

 Zinc %

Lead %

2638-4

372.75

374.05

1.30

1.30

6.85

0.30

2638-4

374.05

376.1

2.05

2.05

0.30

2638-4

376.1

380.1

4.00

4.00

11.62

3.46

including:

2638-4

378.95

380.1

1.15

1.15

28.61

4.17

2638-6

460.7

461.15

0.45

0.45

2.26

1.54

2638-7

394.85

410.2

15.35

14.9

3.25

0.33

including:

2638-7

394.85

397.7

2.85

2.8

12.18

0.75

2638-8

550.1

557.45

7.35

6.5

5.02

1.17

including:

2638-8

556.2

557.45

1.25

1.1

16.19

3.07

2638-16

348.25

361.9

13.65

13.65

2.23

0.12

including:

2638-16

349.05

350.5

1.45

1.45

4.35

0.24

2638-16

354.2

357.5

3.3

3.3

4.29

0.14

2638-16

360.9

361.9

1.0

1.0

4.92

0.01

2638-17

327.45

328.45

1.0

0.95

27.69

12.00

Drill testing of a number of new regional targets and IP geophysical surveys are also ongoing on the Monaster licence block to the south, with the aim of finding additional mineralised zones along the prospective Limerick Trend.

John Teeling, Chairman of Connemara Mining, commented:

"Again, I am pleased to report high quality zinc/lead results from two additional holes at our Stonepark discovery. The high grade mineralised zone has now been traced for 300 metres and remains open.

This very early stage exploration has been consistently successful. We know we have found something - the ongoing drilling and assaying are designed to fully define and value what we are dealing with."

This release has been approved by Graham Reid, P. Geo., Director BRG Technical Services, consultants to Connemara. Mr. Reid has 30 years mineral exploration and evaluation experience.

Enquiries:

Connemara Mining Company Plc

John Teeling, Chairman

 +353 (0)1 833 2833

Jim Finn, Financial Director

Blue Oar Securities Plc

John Wakefield

+44 (0) 117 933 0020

Simon Moynagh

College Hill

Paddy Blewer

+44 (0) 207 457 2020

Nick Elwes

www.connemaramining.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCILFSRLALILIT
Date   Source Headline
18th Sep 20077:00 amBUSARC Releases New MetaWare(R) Development Toolkit Featuring Lower Power and Smaller Code Size
11th Sep 20077:03 amRNSAgreement with Intel
11th Sep 20077:00 amBUSARC Signs Licensing Agreement for Configurable Solutions For Next-Generation Computing Products
10th Sep 20077:45 amBUSARC Announces Ultra Low Power Technology ''Energy PRO'' That Lowers Core and Subsystem Power by Four Fold
10th Sep 20077:45 amBUSARC and Cadence Offer New Low-Power Design Methodology for Demanding Mobile Applications
6th Sep 20075:08 pmBUSHolding(s) in Company
31st Aug 20073:03 pmBUSTotal Voting Rights
22nd Aug 200711:12 amRNSAGM Statement
16th Aug 200712:03 pmRNSAIM Rule 26
13th Aug 20077:46 amBUSNew ARC(R) VRaptor(TM)-Based Video Subsystems Receive Strong Industry Support
13th Aug 20077:45 amBUSGagan Gupta is Senior Director of Product Marketing at ARC International. Gagan is responsible for product planning and definition of ARC's multimedia subsystems and configurable processors. (Photo: Business Wire)
9th Aug 20074:27 pmBUSHolding(s) in Company
9th Aug 20074:21 pmBUSHolding(s) in Company
9th Aug 20074:19 pmBUSHolding(s) in Company
7th Aug 20073:45 pmBUSHolding(s) in Company
7th Aug 20073:35 pmBUSHolding(s) in Company
1st Aug 20077:01 amRNSInterim Results
1st Aug 20077:00 amBUSARC International plc Announces Unaudited Preliminary Results For the Six Months Ended June 30, 2007
31st Jul 20077:00 amRNSAdmission to AIM
12th Jul 200710:08 amRNSNotice of Results
11th Jul 20079:00 amRNSSummary of Deals
11th Jul 20077:00 amBUSMedical Device Company CVRx Adopts Configurable ARC(R) Core For Implantable Blood Pressure Reduction Device
11th Jul 20077:00 amBUS11 North American Companies Adopt ARC's Low Power Configurable Solutions for a Wide Range of High-Volume Applications
10th Jul 20074:30 amBUSConfigCon(TM) Shanghai 2007 Excites China's SoC Developer Community With Messages on Creating Multimedia Solutions Using Configurable Subsystems and Processors
29th Jun 20075:44 pmBUSTotal Voting Rights
21st Jun 20077:01 amRNSAppointment of NED
21st Jun 20077:00 amBUSARC International Appoints Steven Gunders As Non Executive Director
21st Jun 20077:00 amBUSARC Introduces New Modeling and Simulation Products to Speed ''Time to Market'' of ARC-Based(TM) SoCs
15th Jun 20077:02 amRNSAcquisition
15th Jun 20077:00 amBUSARC Acquires Tenison to Speed Time to Market Of Customers' Complex SoC Designs; Establishes Cambridge Engineering Center
13th Jun 20074:57 pmBUSHolding(s) in Company
12th Jun 20074:02 pmBUSHolding(s) in Company
7th Jun 20074:36 pmBUSHolding(s) in Company
1st Jun 20079:55 amBUSTotal Voting Rights
21st May 20078:31 amBUSHolding(s) in Company
17th May 200712:50 pmBUSChange of Registerd Office
16th May 20074:58 pmBUSDirector/PDMR Shareholding
16th May 20078:00 amBUSMicrosoft and RealNetworks Led the Agenda at ConfigCon(TM) Taiwan 2007; Event Attracted Record Crowd
25th Apr 20078:00 amRNSAnalyst & Investor Conference
16th Apr 20077:00 amRNSContract Extension
16th Apr 20077:00 amBUSARC Building Advanced CPF-Enabled Flow to Lower Power Consumption of Its Configurable Subsystems and Cores
16th Apr 20077:00 amBUSBroadcom Standardizes on ARC's Configurable Technology for High Volume Multimedia Applications
11th Apr 20077:00 amBUSBlocklisting Interim Review
5th Apr 20074:40 pmBUSTotal Voting Rights
5th Apr 20074:39 pmBUSHolding(s) in Company
5th Apr 20074:37 pmBUSHolding(s) in Company
3rd Apr 200711:51 amBUSResult of AGM
3rd Apr 20079:30 amRNSAGM Statement
3rd Apr 20077:02 amRNSCustomer Agreement
3rd Apr 20077:00 amBUSARC Signs $15M Multiyear License With One of the Largest Consumer Electronics Companies

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.