Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAltona Energy Regulatory News (ANR)

  • There is currently no data for ANR

Drilling & sampling to begin

19 Apr 2007 11:27

Altona Resources PLC19 April 2007 19 April 2007 Altona Resources Plc ("Altona" or "the Company") Drilling Programme and Bulk Sampling to Commence at Altona's Wintinna Deposit Altona Resources plc (AIM: ANR) is scheduled to commence the drilling programmeat the Company's Wintinna Deposit in early May 2007, as part of the feasibilitystudy for the development of the Arckaringa Project (the "Project") in SouthAustralia. The Project comprises an integrated coal mine, Coal-to-Liquids("CTL") and power cogeneration plant. The drilling programme, which has been planned by Norman Kennedy, the TechnicalDirector of the Company, with the assistance of external consultants, focuses onan optimum area within the Wintinna Deposit for extraction of coal by open-cutmining methods to supply the proposed CTL plant. The programme will validate andupgrade past exploration results to allow for the previously defined coalresource to be classified according to the current JORC code for reporting coalresources. Another primary objective is the extraction of a representative bulk sample ofapproximately 5 tonnes of coal for process testing. A parallel programme of geotechnical and hydrogeological testing is alsoproposed to supplement the already comprehensive data available from pasttesting. For the purposes of resource validation and the bulk sample collection, it isproposed to drill 6 twinned 200mm diameter cored boreholes located adjacent topreviously drilled cored boreholes at a uniform spacing representativelycovering the total area of investigation. An additional 15 geophysically logged HQ partially cored boreholes and 5geophysically logged open holes are proposed to reduce the borehole spacingwithin the area of interest to between 500 metres and 1 kilometre. It isproposed to fully core a hole at PQ diameter for geotechnical purposes. The past drilling of the Wintinna Deposit has already defined a total resourceof over 3.5 billion tonnes of coal. The new exploration programme has beendesigned to allow for the classification of at least 700 million tonnes of coalfrom within the resource as Measured or Indicated according to the current JORCCode for reporting resources. The Project feasibility study base case entailsthe supply of 10 Million tonnes of coal per annum to produce 10 Million Barrelsof CTL products annually for up to 50 years, a total coal requirement of 500Million tonnes over the Project life. Altona has secured a drilling rig for the proposed programme and it is estimatedthat the field work will take approximately 9 months to complete, or less ifadditional rigs become available. The budgeted cost for the programme, includingthe geotechnical and hydrogeological testing and assessment, is approximately£0.9 million. Chris Lambert, Chairman of Altona, commented: "The scheduling of the drillingprogramme is an important step in the feasibility study and is expected toenable the Company to define a JORC-compliant resource to underpin theArckaringa Project. As soon as this programme and the associated coal technicalassessments are completed, we will be in a strong position to commercialise theProject" The information contained in this announcement has been reviewed by NormanKennedy, the Technical Director of the Company. Mr Kennedy holds a Bachelor ofScience from the University of NSW, and is a Member of the Australian Instituteof Mining and Metallurgy -Ends- For further information please contact: Altona Resources plc Christopher Lambert, Chairman +44 (0) 798 0017 108 Christopher Schrape, Managing Director +61 (0) 417 984 434 Nabarro Wells & Co Limited Hugh Oram, Director +44 (0) 207 710 7400 Parkgreen Communications Justine Howarth / Victoria Thomas +44 (0) 207 7851 7480 Notes to Editors: The Arckaringa Coal Project: The Arckaringa Coal Project ("Arckaringa") comprises the 100% interest in threeexploration licences in South Australia, which have previously been calculatedas a JORC compliant resource of over 7 billion tonnes of sub bituminous Permiancoal, amenable to open pit mining, and suitable as fuel for power generation andpotential application of coal to oil technology. The three exploration licences,EL3360, EL3361, and EL3362 ("the Licences"), cover a combined area ofapproximately 2,500 square kilometres in the northern portion of the PermianArckaringa Basin in South Australia. The Licences include three coal deposits,known as the Westfield Deposit (EL3360), the Wintinna Deposit (EL3361), and theMurloocoppie Deposit (EL3362), are located in close proximity to the Adelaide toDarwin railroad, facilitating improved economic potential for dispatch of coalto coastal based industries and export ports. The railroad will also facilitatemine development and operations. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
19th Dec 20147:00 amRNSNomad Appointment
16th Dec 20143:57 pmRNSResult of AGM
16th Dec 20147:00 amRNSAGM Statement
2nd Dec 20147:00 amRNSFIRB Approval
14th Nov 20147:08 amRNSFinal Results
14th Nov 20147:00 amRNSJoint Venture Agreement
15th Oct 20147:00 amRNSDirectorate Change
30th Sep 201410:43 amRNSStatement regarding recent share price movements
30th Jul 20147:00 amRNSJoint venture negotiation update
23rd Jun 20147:00 amRNSJoint venture negotiation update
22nd May 20142:43 pmRNSArckaringa project update
16th May 20142:13 pmRNSDeath of a Director
15th May 20147:00 amRNSArckaringa project update
3rd Apr 201410:54 amRNSDirector/PDMR Shareholding
31st Mar 20141:53 pmRNSGrant of Options
19th Mar 20147:00 amRNSAltona takes full control of Arckaringa Project
19th Feb 20147:00 amRNSHalf Yearly Report
12th Feb 20147:00 amRNSDirectorate Change
7th Feb 20147:00 amRNSMemorandum of Understanding
31st Jan 20147:01 amRNSExciting future ahead for Arckaringa Project
31st Jan 20147:00 amRNSTermination of CNOOC JV
15th Jan 201412:32 pmRNSCompletion of Second Tranche of Placing
15th Jan 20147:00 amRNSUpdate on Second Tranche of Placing
30th Dec 201310:28 amRNSUpdate on Second Tranche of Placing
29th Nov 20137:00 amRNSAGM Statement
19th Nov 20134:17 pmRNSDirectorate Change
18th Nov 20137:00 amRNSDirectorate Change
5th Nov 20137:00 amRNSNotice of AGM
1st Nov 20137:00 amRNSFirst tranche of placing and Directorate Change
31st Oct 201310:01 amRNSFull Year Results
17th Oct 201311:04 amRNSNew Alternative Fuels Report
10th Oct 20132:41 pmRNSPlacing Agreement
6th Sep 20137:00 amRNSArckaringa Project Update
5th Aug 20137:00 amRNSCoal to Methanol - Technical Feasibility Study
15th Jul 20137:00 amRNSDrilling Programe Update
27th Jun 20137:00 amRNSMOU to Invest in Operating Coal Mine in China
3rd Jun 20137:00 amRNSArckaringa Project Update
15th Apr 20138:52 amRNS£2m Financing Facility Secured
28th Mar 20137:00 amRNSHalf Yearly Report
28th Feb 20137:00 amRNSUpdate: Issue of Equity
11th Feb 20137:00 amRNSUpdate: Issue of Equity
6th Feb 20137:00 amRNSProject Dragon Update
4th Feb 20137:00 amRNSArckaringa Project Update
28th Jan 20133:22 pmRNSHolding(s) in Company
28th Jan 20138:40 amRNSIssue of Equity
8th Jan 20134:12 pmRNSTR1: Notification of major interest in shares
13th Dec 20127:00 amRNSResult of AGM
12th Dec 20127:00 amRNSUpdate on PRC Coal Exploration Licences
21st Nov 20123:21 pmRNSPosting of Accounts and Notice of AGM
14th Nov 20127:00 amRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.