Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAltona Energy Regulatory News (ANR)

  • There is currently no data for ANR

Drilling & sampling to begin

19 Apr 2007 11:27

Altona Resources PLC19 April 2007 19 April 2007 Altona Resources Plc ("Altona" or "the Company") Drilling Programme and Bulk Sampling to Commence at Altona's Wintinna Deposit Altona Resources plc (AIM: ANR) is scheduled to commence the drilling programmeat the Company's Wintinna Deposit in early May 2007, as part of the feasibilitystudy for the development of the Arckaringa Project (the "Project") in SouthAustralia. The Project comprises an integrated coal mine, Coal-to-Liquids("CTL") and power cogeneration plant. The drilling programme, which has been planned by Norman Kennedy, the TechnicalDirector of the Company, with the assistance of external consultants, focuses onan optimum area within the Wintinna Deposit for extraction of coal by open-cutmining methods to supply the proposed CTL plant. The programme will validate andupgrade past exploration results to allow for the previously defined coalresource to be classified according to the current JORC code for reporting coalresources. Another primary objective is the extraction of a representative bulk sample ofapproximately 5 tonnes of coal for process testing. A parallel programme of geotechnical and hydrogeological testing is alsoproposed to supplement the already comprehensive data available from pasttesting. For the purposes of resource validation and the bulk sample collection, it isproposed to drill 6 twinned 200mm diameter cored boreholes located adjacent topreviously drilled cored boreholes at a uniform spacing representativelycovering the total area of investigation. An additional 15 geophysically logged HQ partially cored boreholes and 5geophysically logged open holes are proposed to reduce the borehole spacingwithin the area of interest to between 500 metres and 1 kilometre. It isproposed to fully core a hole at PQ diameter for geotechnical purposes. The past drilling of the Wintinna Deposit has already defined a total resourceof over 3.5 billion tonnes of coal. The new exploration programme has beendesigned to allow for the classification of at least 700 million tonnes of coalfrom within the resource as Measured or Indicated according to the current JORCCode for reporting resources. The Project feasibility study base case entailsthe supply of 10 Million tonnes of coal per annum to produce 10 Million Barrelsof CTL products annually for up to 50 years, a total coal requirement of 500Million tonnes over the Project life. Altona has secured a drilling rig for the proposed programme and it is estimatedthat the field work will take approximately 9 months to complete, or less ifadditional rigs become available. The budgeted cost for the programme, includingthe geotechnical and hydrogeological testing and assessment, is approximately£0.9 million. Chris Lambert, Chairman of Altona, commented: "The scheduling of the drillingprogramme is an important step in the feasibility study and is expected toenable the Company to define a JORC-compliant resource to underpin theArckaringa Project. As soon as this programme and the associated coal technicalassessments are completed, we will be in a strong position to commercialise theProject" The information contained in this announcement has been reviewed by NormanKennedy, the Technical Director of the Company. Mr Kennedy holds a Bachelor ofScience from the University of NSW, and is a Member of the Australian Instituteof Mining and Metallurgy -Ends- For further information please contact: Altona Resources plc Christopher Lambert, Chairman +44 (0) 798 0017 108 Christopher Schrape, Managing Director +61 (0) 417 984 434 Nabarro Wells & Co Limited Hugh Oram, Director +44 (0) 207 710 7400 Parkgreen Communications Justine Howarth / Victoria Thomas +44 (0) 207 7851 7480 Notes to Editors: The Arckaringa Coal Project: The Arckaringa Coal Project ("Arckaringa") comprises the 100% interest in threeexploration licences in South Australia, which have previously been calculatedas a JORC compliant resource of over 7 billion tonnes of sub bituminous Permiancoal, amenable to open pit mining, and suitable as fuel for power generation andpotential application of coal to oil technology. The three exploration licences,EL3360, EL3361, and EL3362 ("the Licences"), cover a combined area ofapproximately 2,500 square kilometres in the northern portion of the PermianArckaringa Basin in South Australia. The Licences include three coal deposits,known as the Westfield Deposit (EL3360), the Wintinna Deposit (EL3361), and theMurloocoppie Deposit (EL3362), are located in close proximity to the Adelaide toDarwin railroad, facilitating improved economic potential for dispatch of coalto coastal based industries and export ports. The railroad will also facilitatemine development and operations. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
1st Jun 20107:00 amRNSCNOOC-NEIA - Successful FIRB Assessment
30th Apr 20107:00 amRNSTotal Voting Rights
23rd Apr 20104:03 pmRNSExercise of Options
21st Apr 20107:00 amRNSCNOOC-NEIA's Submission of FIRB Application
20th Apr 20107:00 amRNSFormal Signing of Joint Venture
16th Apr 201010:00 amRNSBoard Change & Director Dealings
7th Apr 20103:15 pmRNSHolding(s) in Company
1st Apr 20103:26 pmRNSExercise of Options
30th Mar 20107:00 amRNSPlacing to raise ?3.0 million
30th Mar 20107:00 amRNSCNOOC-NEI Joint Venture Success Fees & Options
30th Mar 20107:00 amRNSInterim Results
11th Mar 20107:00 amRNSAppointment of Project Technology Executive
9th Mar 20103:12 pmRNSExercise of Options
24th Feb 20107:00 amRNSNew Website and Presentation
9th Feb 20107:00 amRNSAppointment of Broker and Nominated Adviser
29th Jan 20107:00 amRNSTotal Voting Rights
14th Jan 20103:00 pmRNSDirector/PDMR Shareholding
12th Jan 20104:22 pmRNSExercise of Options
5th Jan 20104:00 pmRNSDirector/PDMR Shareholding
18th Dec 200912:30 pmRNSResult of AGM
18th Dec 200910:02 amRNSChairman's AGM Statement
17th Dec 200912:00 pmRNSRe Rentech Announcement
2nd Dec 200911:45 amRNSHolding(s) in Company
23rd Nov 20097:00 amRNSFinal Results
18th Nov 20097:00 amRNSSign Binding Agreement with CNOOC-NEI
10th Nov 20093:45 pmRNSHolding(s) in Company
3rd Nov 20097:00 amRNSHolding(s) in Company
30th Oct 20097:00 amRNSTotal Voting Rights
2nd Oct 20092:00 pmRNSExercise of Options
9th Sep 20095:57 pmRNSHolding(s) in Company
8th Sep 20097:00 amRNSJoins Global Carbon Capture and Storage Institute
28th Aug 20097:25 amRNSTotal Voting Rights
27th Aug 20094:40 pmRNSHolding(s) in Company
7th Aug 20093:50 pmRNSHolding(s) in Company
3rd Aug 20097:30 amRNSPlacement to Invesco Perpetual
3rd Aug 20097:00 amRNSFinancing Update
26th Jun 20097:00 amRNSJV Terms Sheet Agreed with CNOOC-NEI
14th May 20092:00 pmRNSInvestor Relations Presentation
31st Mar 20099:30 amRNSInterim Results
6th Jan 20099:00 amRNSHolding(s) in Company
23rd Dec 200811:30 amRNSCompany Website
19th Dec 20084:13 pmRNSAGM Statement
8th Dec 20081:30 pmRNSDirector/PDMR Shareholding
26th Nov 20089:08 amRNSFinal Results
1st Sep 20087:00 amRNS1.287bn Tonne JORC Compliant
20th Aug 20081:00 pmRNSIssue of Options
19th Aug 20087:00 amRNSMOU with CNOOC
8th Aug 200811:30 amRNSHolding(s) in Company
8th Aug 20087:00 amRNSAppointment of Ambrian Partne
1st Aug 20083:00 pmRNSDirector's Disclosure Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.