Amur Minerals Corporation ("Amur" or the "Company"), the nickel-copper sulphide exploration and development company focused on the far east of Russia, is pleased to announce that the Base Line Environmental Assessment ("BLEA") (a component of the Company's Permanent Conditions TEO ("TEO")) for its Kun-Manie nickel copper sulphide project is now complete and has been filed and approved by the necessary Russian Federation agencies.

 

Compiled by the Institute of Water and Environmental Problems Division ("IWEP") of the Russian Academy of Sciences in the Far East for the area in and around the exploration and mining licence, the study is based on information acquired by the Company, IWEP assessments including district, regional and federally published information and materials.

 

The BLEA component of the TEO defines the base line preproduction environmental setting and conditions. This is an integral part of the environmental quality management system and the related controls for monitoring the impacts of the planned mining operation at Kun-Manie. Specifically the impacts related to mining, sedimentation, air quality management, emergency procedures, water quality monitoring and management systems establish that there are no extraordinary considerations beyond those of a typical mining operation are required.

 

 

Robin Young, CEO of Amur Minerals Corporation, commented:

 

"Completion of the Base Line Environmental Assessment, that is required for inclusion in the TEO (Russian required feasibility study), confirms mining of our large scale Kun-Manie nickel copper sulphide deposit will not require any extraordinary programmes or procedures beyond those already planned by the Company to undertake the implementation of our operation. Typical monitoring and mitigation procedures can be implemented to ensure protection of the environment during construction and operations."

 

Highlights from the assessment:

 

·; Air Quality: Analyses are reported at the nearest village of Bomnak (431 residents) located upwind and approximately 250 km to the west of the project site and are within acceptable limits.

 

·; Surface Hydrological Network: The current hydrological quality of the streams and rivers located at, and adjacent, the planned mine site are characterised by naturally occurring factors on site and vary with the seasonal weather patterns. During the summer low water periods meet potable standards with low levels of copper and occasionally aluminum and zinc being present. Following the heavy rain season and spring snow melt runoff, elevated levels of nickel, manganese and iron are also present whilst maintaining potable water quality standards. Water protection and quality monitoring procedures have been successfully identified.

 

·; Flora: Three geobotanical zones (mountain taiga, subalpine and mountain tundra) are present within the area. The three zones are typical of permafrost based regions. Exploration has not lead to any significant changes to the flora and monitoring of the site is recommended prior to and during mining operations.

 

·; Fauna: The current survey of fish, avian and mammalian populations has been completed by a combination of field observation and the review of existing information. Results indicate that the distribution and types of the fauna present are typical of the East Siberian and Okhotsk-Kamkhatka groupings. A total of approximately 147 species have been identified in the area with fewer (115) being identified within the detailed exploration and mining licence area. No endangered species have been identified and it is recommended that a continual monitoring programme be implemented before and during operations.

 

·; Exploration Activities: IWEP reports historical exploration activities have had a small and acceptable impact on the surface soils and vegetation with approximately 223.2 hectares (6.2 per cent of the mining licence) being altered due to exploration activities and road construction. Future disturbance typical of mining operations and the construction of supporting facilities will impact larger areas and a monitoring programme is recommended for future activities.

 

·; Protected Territories: Both the office for Protection, Monitoring and Management of Wildlife and Habitat and the Federal Service for Supervision of Natural Resource Management (Rozprirodnadzor) confirm no protected natural territories are present as registered with the local, regional or federal authorities.

 

·; Naturally Occurring Hazards: It is noted the presence of permafrost, steep terrain and narrow river valleys can present natural hazards to the planned operation and the project design should include consideration of these parameters. These potential hazards primarily include landslides and flooding / erosion during high periods of precipitation.

 

·; Social / Economic Setting: Located in the largest administrative district (Zeya) of Amur Oblast with the Republic of Sakha (Yakutia) to the north and Khabarovsk Krai to the east, this 87,500 km2 (24 per cent of Amur Oblast) hosts 14,649 residents with a population density of 0.23 people per km2. The three main industries include limited placer gold mining, timber harvesting and the operation of a hydroelectric dam.

 

Bomnak, the nearest village to the project site (approximately 440 residents) was founded in 1951 to support gold mining activities in the area. The population of the village has been in steady decline since 1990 with further decreases projected into 2040. Approximately 50 per cent of the residents are represented by the indigenous Evenki clans whose traditional activities include hunting and limited reindeer herding.

 

·; Cultural Heritage Sites: Architectural, historical and monumental art cultural sites have not been identified at Kun-Manie or the surrounding area.

 

·; Recommendations: Recommendations based on the IWEP evaluation provide the Company with a system of integrated environmental monitoring procedures prior to and for implementation during operations. The recommendations are typical of mining operations and no additional extraordinary activities have been identified.

 

 

Market Abuse Regulation (MAR) Disclosure

 

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

 

Enquiries:

 

Company

Amur Minerals Corp.

Nomad and Broker

S.P. Angel Corporate Finance LLP

Public Relations

Blytheweigh

Robin Young CEO

Richard Morrison

Soltan Tagiev

Megan Ray

Tim Blythe

+7(4212)755615

+44(0)20 3470 0470

+44 (0) 20 7138 3203

 

Notes to Editors

 

The information contained in this announcement has been reviewed and approved by the CEO of Amur, Mr. Robin Young. Mr. Young is a Geological Engineer (cum laude), a Professional Geologist licensed by the Utah Division of Occupational and Professional Licensing, and is a Qualified Professional Geologist, as defined by the Toronto and Vancouver Stock Exchanges and a qualified person as defined by the AIM Rules for Companies. An employee of Amur for 15 years, previously Mr. Young was employed as an independent consultant with Fluor Engineers, Fluor Australia and Western Services Engineering, Inc. during which time his responsibilities included the independent compilation of resources and reserves in accordance with JORC standards. In addition, he was the lead engineer and participant of numerous studies and projects requiring the compilation of independent Bankable Studies utilised to finance small to large scale projects located worldwide. Mr. Young is responsible for the content of this announcement.

 

For further information, and Company updates see the Company website at www.amurminerals.com and twitter page @amur_minerals.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCUSVKRRBUAAAR
Date   Source Headline
9th Dec 20137:00 amRNSMineral Resource Update
18th Nov 20137:00 amRNSAGM Statement and Activities Report
29th Oct 20137:00 amRNSNotice of AGM
11th Oct 20137:00 amRNSKubuk 2013 Drilling Completed
9th Oct 20137:00 amRNSRecent Television Broadcast
30th Sep 20137:00 amRNSHalf Yearly Report
12th Sep 20137:00 amRNSMining Licence Update
23rd Aug 20134:40 pmRNSSecond Price Monitoring Extn
23rd Aug 20134:35 pmRNSPrice Monitoring Extension
12th Aug 20137:00 amRNSKubuk Drilling Update
30th Jul 20137:00 amRNSUpdated JORC Mineral Resource
23rd Jul 20137:00 amRNSSubscription to raise £5.2m, Equity Swap & Update
17th Jul 20134:35 pmRNSPrice Monitoring Extension
16th Jul 20134:35 pmRNSPrice Monitoring Extension
8th Jul 20137:00 amRNSAnti Monopoly Board Approval Received
3rd Jul 20137:00 amRNSEarly Positive Kubuk Results Doubles 2013 Drill Pl
1st Jul 20137:00 amRNSChange of Adviser
28th Jun 20138:04 amRNSResults for the Year Ended 31 December 2012
12th Jun 20137:00 amRNSPreliminary Drill Report from Kubuk
24th May 20137:00 amRNSKun-Manie Mining Licence Update
2nd May 20134:35 pmRNSPrice Monitoring Extension
30th Apr 20134:35 pmRNSPrice Monitoring Extension
23rd Apr 20137:00 amRNSGrant of Options and Directors Dealing
19th Apr 20137:00 amRNSOperational Update - Kun-Manie Drill Programme
9th Apr 20137:00 amRNSProfits Tax Reduction
22nd Mar 20138:40 amRNSMining Licence Update
20th Mar 20131:16 pmRNSStatement in relation to Cypriot subsidiary
20th Mar 20137:00 amRNSFar East Development Programme Update
18th Mar 20139:27 amRNSAdviser Change of Name
8th Mar 201312:44 pmRNSDrilling Identifies New Zone at Ikenskoe
6th Mar 20137:00 amRNSCompletion of Winter Ice Road
25th Feb 20137:00 amRNSInclusion of Kun-Manie in Far East Dev. Programme
18th Feb 20137:32 amRNS2012 Gorny Drilling Results (Replacement)
14th Feb 20137:30 amRNS2012 Gorny Drilling Results
4th Feb 20137:00 amRNS2012 Sampling - Kubuk Expands 50% and New Targets
20th Dec 20127:00 amRNSMining Licence Application Update
17th Dec 20127:00 amRNS2012 Drilling Doubles Length of Maly Kurumkon
19th Nov 20124:40 pmRNSSecond Price Monitoring Extn
19th Nov 20124:35 pmRNSPrice Monitoring Extension
14th Nov 20127:00 amRNSKun-Manie Exploration Licence Extension Granted
14th Nov 20127:00 amRNSDrilling Results for 2012 Field Season
12th Nov 20124:40 pmRNSSecond Price Monitoring Extn
12th Nov 20124:35 pmRNSPrice Monitoring Extension
9th Nov 20129:00 amRNSResult of AGM
19th Oct 20127:00 amRNSNotice of AGM
28th Sep 20127:00 amRNSHalf Yearly Report
21st Sep 20124:40 pmRNSSecond Price Monitoring Extn
21st Sep 20124:35 pmRNSPrice Monitoring Extension
3rd Sep 20127:00 amRNSDrilling At Maly Kurumkon Expands Deposit
6th Aug 20127:00 amRNSKubuk Confirms Substantial Mineralisation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.