REMINDER: Our user survey closes on Friday, please submit your responses here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0675
Bid: 0.065
Ask: 0.07
Change: 0.00 (0.00%)
Spread: 0.005 (7.692%)
Open: 0.0675
High: 0.0675
Low: 0.0675
Prev. Close: 0.0675
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Investee Company Update: GreenRoc Mining plc

3 Dec 2021 07:00

RNS Number : 4479U
Alba Mineral Resources PLC
03 December 2021
 

Click on or paste the following link into your website browser to view the associated PDF document (including maps and images): http://www.rns-pdf.londonstockexchange.com/rns/4479U_1-2021-12-2.pdf

 

Alba Mineral Resources plc

("Alba" or the "Company")

 

Investee Company Update: GreenRoc Mining plc

 

Alba Mineral Resources plc (AIM: ALBA) is pleased to note the announcement today by its portfolio company, GreenRoc Mining plc ("GreenRoc") (AIM: GROC), in which Alba holds a 54% majority interest. Following on from Alba's announcement on 11 August 2021 of the completion of the drilling programme at the Amitsoq Graphite Project in southern Greenland, GreenRoc's announcement today details the strong assay results which have now been received from that drilling programme, as well as from an associated channel sampling programme, and which has confirmed Amitsoq as one of the highest-grade graphite projects globally.

Alba's Executive Chairman, George Frangeskides, commented:

"These exciting results from GreenRoc's drilling and sampling programme at the Amitsoq Graphite Project further confirm the consistently high-grade nature of the deposit, the significant widths of the graphite layers and, therefore, the potential for a sizeable JORC Resource. Given graphite's expanding role in many green energy solutions, we look forward to the step-out drilling programme next year as GreenRoc progresses along the path to becoming a supplier of this highly sought-after critical mineral."

The announcement by GreenRoc is set out below without material changes:

 

GreenRoc Mining plc

("GreenRoc" or the "Company")

 

Amitsoq Graphite Project Update

Confirmation of High-Grade Graphite Drill Intercepts

 

GreenRoc Mining plc (AIM: GROC) is pleased to announce the full suite of assay results from its drilling and channel sampling programme undertaken at the Amitsoq Island deposit from June to August 2021. These results confirm the high-grade nature of the Amitsoq Island deposit as well as showing the graphite layers to be both thicker, and more consistent, than previously thought.

Key Points

· High-grade graphite mineralisation confirmed and increasing true widths observed down dip on both the upper and lower graphite layers, supporting the potential for a sizeable JORC Resource

· Lower Graphite Layer (LGL) returns drill intercepts grading up to 23.01% C(g) and channel samples grading up to 30.35% C(g)

· Upper Graphite Layer (UGL) returns drill intercepts grading up to 19.83% C(g) and channel samples grading up to 27.40% C(g)

· Significant true width thickness of graphite layers confirmed by drilling, including:

o LGL: 15.60 m @ 22.34% C(g) from 93.61 m

o LGL: 14.95 m @ 22.82% C(g) from 102.19 m

· Deposit open along strike (predominantly to the north) and down dip, which will be tested in Phase 2 drilling programme

· Significant down-dip extensions and increase in thickness from surface outcrop

· Strike length of LGL intersected from Pads B and E totals 154 m

· Low-grade uranium content poses no problems for future development under new Greenlandic legislation

· Drilling campaign confirms Amitsoq to be one of the highest-grade graphite deposits globally

· These results will be a key element in the mineral resource estimation assessment to be made by the Competent Person in due course.

GreenRoc's CEO, Kirk Adams, commented:

"These results from the 2021 drilling campaign confirm the Amitsoq Island deposit as one of the highest-grade graphite deposits in the world.

"In addition, the consistency of grades, combined with the increasing true widths observed down dip at both graphite layers, represents particularly encouraging news and bodes well for the resource potential at the Amitsoq Island deposit.

"In the lower graphite layer, the drill core assays are grading up to 23.01% contained graphite, with an average of 22.56%. Furthermore, the drilling has shown that the true width of this layer below the old open pit mine widens with depth, increasing from 13.2 m to 14.95 m at around 100 m down dip from surface.

"The upper graphite layer also shows similar consistency, with drill core assays of up to 19.83%, and an average of 18.91%, contained graphite. This upper mineralised zone also shows increasing true widths with depth.

"This update gives us confidence for the step-out drilling programme which we have planned for 2022 and we are positive about the prospects for the ultimate resumption of mining at the Amitsoq Island deposit."

Details

GreenRoc has received the drill core and channel sample assays from the phase 1 drilling programme on the Amitsoq Island graphite deposit that took place between June and August 2021. Drilling was conducted at four drill pads along the island's ridge to test the down-dip continuation of the Upper Graphite Layer (UGL) and the Lower Graphite Layer (LGL), which outcrop along the eastern face of the island. The assay results are set out in Tables 1 and 2.

Table 1. Drill Core Mineralised Intercepts. True thickness calculated using 30° true dip of the graphite layers.

 

Pad

Hole ID

Azimuth/Dip

Graphite Layer

From (m)

Downhole Width (m)

% C(g)

True Thickness (m)

A

AM-DD-013A

Vertical

UGL

20.94

9.29

18.89

8.05

AM-DD-014

141°/-60°

UGL

18.87

6.76

19.83

6.76

B

AM-DD-004

Vertical

UGL

47.67

4.37

18.15

3.78

AM-DD-005

141°/-60°

UGL

45.74

2.88

17.58

2.88

LGL

93.61

15.60

22.34

15.60

AM-DD-006

141°/-85°

UGL

45.31

4.38

19.10

3.97

LGL

102.19

16.49

22.82

14.95

E

AM-DD-008

141°/-70°

LGL

95.58

3.83

21.72

3.77

AM-DD-009

141°/-50°

LGL

95.45

0.60

21.96

0.59

AM-DD-015

Vertical

LGL

113.00

8.18

23.01

7.08

 

Table 2. Channel Sample Results

Locality

Interval (m)

% C(g)

Description

A-UGL-1

1

25.85

UGL outcrop below pad A

A-UGL-2

1.89

20.28

UGL outcrop below pad A

A-UGL-3

2.07

19.71

UGL outcrop below pad A

A-UGL-4

2.66

23.78

UGL outcrop below pad A

B-UGL-1

1.1

26.15

UGL outcrop below pad B

B-UGL-2

2.03

27.40

UGL outcrop below pad B

LGL-1

0.8

25.25

LGL outcrop south of the opencut

LGL-2

3.05

27.90

LGL outcrop north of the opencut

LGL-3

1

27.1

LGL outcrop north of the open cut

LGL-4

0.5

22.2

LGL outcrop within a trench excavated in 1915

0.4

26.1

0.8

30.35

 

Results

Pad A

Hole AM-DD-013A intersected the UGL from 20.94 m with a true thickness of 8.05 m, giving a down-dip continuation of 27 m from the surface outcrop. Additionally, the UGL swells from a max thickness of 2.66 m at the surface to 8.05 m (true thickness) in hole AM-DD-013A (Tables 1 & 2). A drill pad along the western face of the island has been planned for the Phase 2 programme which will further test the down-dip extension and swell of the UGL.

Four-channel sample transects were taken along the extent of the UGL outcrop below Pad A, with an average grade of 22.08% C(g) across the outcrop and individual samples grading up to 26.1% C(g).

Pad B

Both the UGL and LGL were intersected in holes drilled at Pad B. Hole AM-DD-006 intersected 16.49 m @ 22.82 C(g) from 102.19 m; this intercept gives the LGL a down-dip continuation of 91 m from the open-cut at the surface. More importantly, the LGL maintains a significant thickness down-dip from the surface, swelling from 13.20 m (true thickness) in the open-cut to 14.95 m (true thickness) in AM-DD-006 (Tables 1 & 2). Hole AM-DD-005 intersected 15.60 m @ 22.34% C(g) from 93.61 m, which includes a high-grade interval of 2.72 m @ 23.96% C(g) from 104.55 m.

The intersection of the UGL in hole AM-DD-004 gives a down-dip continuation of 54 m from the surface outcrop. Like the UGL intersections at Pad A, the UGL intersections at Pad B increase in thickness down-dip from 2.03 m at the surface to 3.97 m (true thickness) in hole AM-DD-006, almost doubling in thickness (Tables 1 & 2).

Additional drill holes on the western face of the island have been planned to test further the down-dip continuation of both the UGL and LGL.

Two channel sample transects of the UGL were taken below Pad B. The channel sample from B-UGL-2 returned 2.03 m @ 27.40% C(g) and the average grade across the two outcrops is 26.96% C(g).

PAD E

All three holes at Pad E intersected the LGL, which increases in thickness considerable down-dip, from 0.59 m (true thickness) in AM-DD-009 to 7.08 m (true thickness) in AM-DD-015 (Tables 1 & 2). As a result, the down-dip continuation from AM-DD-009 to AM-DD-015 is 75 m. As mentioned above, for Pads A and B, the planned phase 2 holes will test the down-dip continuation and the significant increasing thickness of the layer down-dip.

From the Phase 1 programme, hole AM-DD-015 returned the highest-grade drill core intercept of 8.18 m @ 23.01% C(g) from 113 m, including 3.06 m @ 25.17% C(g) from 114.38 m. Also, AM-DD-015 includes individual samples grading up to 27.60% C(g).

The strike length of the LGL between pad B and E is 154 m. The LGL is still open along strike to the north and will be targeted in the Phase 2 drilling by stepping back at pad C out of the fault zone and drilling from a pad further north.

LGL Channel Sampling

There is limited outcrop of the LGL (except the open cut) due to historic mine development, overburden and boulder cover. However, four channel sample transects were taken from around the mine site area, with individual samples grading up to 32.4% C(g). Most notable, the high-grade LGL-4 samples were taken from extruding outcrops within a historic trench from 1915; the historic trenching reported the LGL to be 13.20 m wide (true thickness).

The LGL was the main horizon worked underground. Therefore, Phase 2 drilling will be accompanied by underground channel sampling, contributing to important information for the resource and future mine layout.

Assays Within Legal Limits for Uranium

In total, 43 drill core samples were sent for multi-element analysis, of which 25 samples were from the graphite ore horizons, and the other 17 samples were either vein, hanging wall or footwall material. The average uranium concentration for all 43 samples and 25 ore samples is 42.71 ppm and 65.59 ppm, respectively. Thus, the uranium concentration in the graphite ore horizon is significantly below the maximum threshold recently set by new legislation passed by the Greenland parliament. This legislation prohibits the exploration and exploitation of uranium projects, save that the prohibition does not apply, where the exploration or exploitation is focused on a mineral other than uranium (e.g. graphite, ilmenite, iron ore, gold or base metals), if the average uranium content of the total resource is below 100 ppm.

As such, the new legislation does not pose any issues for the development and future exploitation of the Amitsoq Deposit.

Next Steps

The complete dataset from the Phase 1 drill core and channel sample assays will form a key component of the mineral resource estimation assessment to be made by the Competent Person.

In preparation for Phase 2 drilling, discussions have been held with key contractors including drilling companies. The Company has had wooden storm-proof stairways constructed at key points on Amitsoq Island, to facilitate future drilling.

GreenRoc have also received the results of the first-year baseline environmental studies carried out by the Company's environmental consultants, BioApp. The environmental and ecological data thereby obtained will inform the design of the second year of baseline studies which the Company intends to carry out next year, leading into the formal environmental and social impact studies required to apply for a mining licence for Amitsoq.

This announcement contains inside information for the purposes of the UK Market Abuse Regulation and the Directors of the Company are responsible for the release of this announcement.

Glossary

C(g) or Graphitic Carbon: Carbon may be present in rocks in various forms including organic carbon, carbonates or graphitic carbon. Carbon in rocks may be reported as fixed or total carbon (i.e. organic carbon + carbon in carbonate minerals + carbon as graphite) or as graphitic carbon or total graphitic carbon (or TGC) (i.e. total carbon - (organic + carbonate carbon)). In this report graphite results are indicated as graphitic carbon or %C(g).

Forward Looking Statements

This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the timing and granting of regulatory and other third party consents and approvals, uncertainties regarding the Company's or any third party's ability to execute and implement future plans, and the occurrence of unexpected events.

Without prejudice to the generality of the foregoing, uncertainties also exist in connection with the ongoing Coronavirus (COVID-19) pandemic which may result in further lockdown measures and restrictions being imposed by Governments and other competent regulatory bodies and agencies from time to time in response to the pandemic, which measures and restrictions may prevent or inhibit the Company from executing its work activities according to the timelines set out in this announcement or indeed from executing its work activities at all. The Coronavirus (COVID-19) pandemic may also affect the Company's ability to execute its work activities due to personnel and contractors testing positive for COVID-19 or otherwise being required to self-isolate from time to time.

Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.

Competent Person Declaration

The information in this release that relates to Exploration Results has been reviewed by Mr Mark Austin. Mr Austin is a member of SACNASP (Reg. No. 400235/06), Fellow of The Geological Society and Fellow of the Geological Society of South Africa. He has a B.Sc. Honours in Geology with 38 years' experience.

Mark Austin has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration targets, Exploration Results, Mineral Resources and Ore Reserves', also known as the JORC Code. The JORC code is a national reporting organisation that is aligned with CRIRSCO. Mr Austin consents to the inclusion in the announcement of the matters based on his information in the form and context in which they appear.

 

ENDS

 

 

For further information, please visit www.albamineralresources.com or contact:

 

Alba Mineral Resources plc

George Frangeskides, Executive Chairman +44 20 3950 0725 

 

SPARK Advisory Partners Limited (Nomad) 

Andrew Emmott +44 20 3368 3555 

 

ETX Capital (Broker)

Thomas Smith +44 20 7392 1494

 

St Brides Partners (Financial PR)

Isabel de Salis / Catherine Leftley alba@stbridespartners.co.uk

 

 

Alba's Projects and Investments

Mining Projects Operated by Alba

Location

Ownership

Clogau (gold)

Wales

90%

Dolgellau Gold Exploration (gold)

Wales

90-100%

Gwynfynydd (gold)

Wales

100%

Limerick (zinc-lead)

Ireland

100%

Investments Held by Alba

Location

Ownership

GreenRoc Mining Plc (mining)

Greenland

54%

Horse Hill (oil)

England

11.765%

 

Forward Looking Statements

 

This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the timing and granting of regulatory and other third party consents and approvals, uncertainties regarding the Company's or any third party's ability to execute and implement future plans, and the occurrence of unexpected events.

 

Without prejudice to the generality of the foregoing, uncertainties also exist in connection with the ongoing Coronavirus (COVID-19) pandemic which may result in further lockdown measures and restrictions being imposed by Governments and other competent regulatory bodies and agencies from time to time in response to the pandemic, which measures and restrictions may prevent or inhibit the Company from executing its work activities according to the timelines set out in this announcement or indeed from executing its work activities at all. The Coronavirus (COVID-19) pandemic may also affect the Company's ability to execute its work activities due to personnel and contractors testing positive for COVID-19 or otherwise being required to self-isolate from time to time.

 

Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCFLFIAFALFIIL
Date   Source Headline
16th Mar 20202:06 pmRNSSecond Price Monitoring Extn
16th Mar 20202:01 pmRNSPrice Monitoring Extension
13th Mar 20207:00 amRNSHorse Hill Update
9th Mar 202010:07 amRNSHorse Hill Update
3rd Mar 20201:04 pmRNSRelated Party Transaction
3rd Mar 202010:15 amRNSIssue of Convertible Security
24th Feb 20207:00 amRNSInvestment Facility
19th Feb 202012:30 pmRNSHorse Hill Update
19th Feb 20207:00 amRNSAmitsoq Update
28th Jan 202012:29 pmRNSClogau Drilling Results
28th Jan 20207:00 amRNSHorse Hill Update
16th Jan 20207:00 amRNSMining Projects Update
23rd Dec 20197:00 amRNSHorse Hill Update
29th Nov 20191:30 pmRNSClogau Drilling Completion
27th Nov 20197:00 amRNSHorse Hill Update
14th Nov 20197:00 amRNSClogau Drilling Mobilisation
12th Nov 20197:00 amRNSHorse Hill Update
6th Nov 20192:54 pmRNSIssue of Equity
4th Nov 20197:34 amRNSHorse Hill Update
1st Nov 20197:00 amRNSUpdated Corporate Presentation
31st Oct 20192:06 pmRNSAmitsoq Update
22nd Oct 20197:00 amRNSHorse Hill Update
15th Oct 20199:00 amRNSHorse Hill Update
11th Oct 20192:28 pmRNSUpdated Corporate Presentation
11th Oct 201910:23 amRNSHorse Hill Update
9th Oct 20198:38 amRNSHorse Hill Update
8th Oct 20197:00 amRNSHorse Hill Update
30th Sep 20197:01 amRNSHorse Hill Update
24th Sep 20197:00 amRNSHorse Hill Update
12th Sep 20197:00 amRNSHorse Hill Update
11th Sep 201912:54 pmRNSHorse Hill Update
30th Aug 20197:00 amRNSHalf-year Report
21st Aug 20191:55 pmRNSOperational Update and Portfolio Review
6th Aug 201911:30 amRNSClogau Update and Change of Adviser (Broker)
1st Aug 20197:00 amRNSHorse Hill Update
28th Jun 20194:12 pmRNSBrockham Update - Alba Comment
28th Jun 201910:15 amRNSBrockham Update
18th Jun 20197:00 amRNSProject and Investment Update
11th Jun 20197:00 amRNSHorse Hill Update
4th Jun 20197:00 amRNSPlacing and Appointment of Joint Broker
3rd Jun 20197:00 amRNSBrockham Update
31st May 20192:00 pmRNSResult of AGM
29th May 20197:00 amRNSExpanded Areas of Gold Mineralisation at Clogau
17th May 20199:15 amRNSDrilling Commences at Limerick Project
17th May 20197:00 amRNSHorse Hill Update
14th May 20194:30 pmRNSCorporate Presentation
14th May 20193:55 pmRNSMaiden Mineral Resource Estimate for TBS Project
10th May 201910:35 amRNSBrockham Update
9th May 201912:00 pmRNSNatural Resources Investor Briefing
9th May 201911:00 amRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.