Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

  • There is currently no data for ALBA

Horse Hill Update

11 Sep 2019 12:54

RNS Number : 0012M
Alba Mineral Resources PLC
11 September 2019
 

 

Alba Mineral Resources plc

("Alba" or the "Company")

Horse Hill Oil Field Granted Long-term Production Consent by Surrey County Council

Alba (LON: ALBA) announces that it has been informed by UK Oil & Gas Plc ("UKOG"), the majority owner of Horse Hill Developments Limited ("HHDL"), the operator of Horse Hill licences PEDL 137 and PEDL 246, containing the Horse Hill-1 ("HH-1") oil discovery, that, earlier today, Surrey County Council's ("SCC") Planning and Regulatory Committee granted full planning consent for long-term oil production at the Horse Hill oil field near Gatwick Airport, subject to certain stipulated conditions.

 

UKOG has further advised as follows below:

 

Summary of Planning Consent

- The planning consent gives permission to produce oil over a period of 25 years at up to 3,500 barrels of oil per day from a total of six wells within the Portland and Kimmeridge oil pools, including the existing Horse Hill-1 ("HH-1") and the forthcoming HH-2/2z horizontal well.

- Consent also includes permission to drill one water reinjection well to help maximise oil recovery. All existing and future wells will be drilled from within the existing 20 x 15 metre concrete pad. No further drilling sites beyond Horse Hill are required.

- This consent means that the field's immediate oil production from HH-1 and HH-2/2z will no longer be limited to existing extended well test planning consents. Consequently, for the first time in Horse Hill's history, Proven and Probable (recoverable) Reserves for the field's full 25-year economic life can be assigned.

- The permission also enables the Field Development Plan to be finalised and submitted to the Oil and Gas Authority ("OGA") for the necessary regulatory and technical consent. Meetings in this respect have been scheduled with OGA in the coming weeks.

- The field's environmental permit application, covering the four new wells and production activities, was submitted to the Environment Agency ("EA") in January and is under determination. As a statutory consultee to the planning application, the EA has stated to SCC that it has no concerns regarding either production activities or water reinjection. Drilling of the four new production and reinjection wells will require the usual drilling regulatory consents from the HSE and OGA.

Forward Operational Plans at Horse Hill

- The first new horizontal production well, Horse Hill-2/2z ("HH-2/2z") is scheduled to start drilling before the end of this month, with a further new Portland production well and Portland water reinjection well planned to follow upon completion of production testing in early 2020.

- During HH-2/2z drilling, the Kimmeridge oil pool will continue to be production tested to provide further key technical data and associated sales revenues to partially offset drilling and testing costs. Planning approval also exists to sidetrack the HH-1 well horizontally into either the Kimmeridge or Portland oil pools.

 

George Frangeskides, Alba's Executive Chairman, commented:

 

"The decision of Surrey County Council today to grant planning permission for long-term production from Horse Hill is a critical milestone in this project. Alba was a founding partner in the Horse Hill consortium and over the past four years has provided significant funds for the project, which support has contributed in large measure to this positive outcome. We look forward to providing further updates as Horse Hill now progresses on its final path to long-term production."

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

Glossary

 

flow test or well test: a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate.

 

horizontal well: a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

 

oil field: an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface.

 

For further information, please contact:

 

Alba Mineral Resources plc

George Frangeskides, Executive Chairman +44 20 3907 4297

 

Cairn Financial Advisers LLP (Nomad)

James Caithie / Liam Murray +44 20 7213 0880

 

First Equity Limited (Broker)

Jason Robertson +44 20 7374 2212

 

Yellow Jersey PR (Financial PR/ IR)

Harriet Jackson / Henry Wilkinson +44 77 1071 8649

alba@yellowjerseypr.com

 

 

Alba's Project & Investment Portfolio

 

Project (commodity)

Location

Ownership

Mining Projects

Amitsoq (graphite)

Greenland

90%

Clogau (gold)

Wales

90%

Inglefield (copper, cobalt, gold)

Greenland

100%

Limerick (zinc-lead)

Ireland

100%

Melville Bay (iron ore)

Greenland

51%

TBS (ilmenite)

Greenland

100%

Oil & Gas Investments

Brockham (oil)

England

5%

Horse Hill (oil)

England

11.765%

 

Web: www.albamineralresources.com

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDLLFELALILLIA
Date   Source Headline
28th May 20262:59 pmRNSResults of AGM
20th May 20267:00 amRNSChange of Name to Arkadian Strategic Metals Plc
14th May 202611:19 amRNSAlba Completes Further Motzfeldt Acquisition
5th May 20269:17 amRNSFinal Results and Notice of AGM
30th Apr 20267:00 amRNSOperational Update
9th Mar 20268:00 amRNS-ROperational Update
6th Mar 20267:56 amRNSFinnsbo Project, Sweden
2nd Mar 20267:00 amRNSShare Placing
16th Feb 20268:10 amRNSPhase 1 Motzfeldt Test Work Completed
12th Feb 202611:58 amRNSClogau Operational Update
6th Feb 202612:18 pmRNSResults of General Meeting
23rd Jan 20267:00 amRNS-RAlba Joins Critical Minerals Association
22nd Jan 20267:00 amRNSNotice of General Meeting
19th Dec 20257:00 amRNSClogau Gold Mine Operational Update
19th Dec 20257:00 amRNSClogau Gold Mine Operational Update
16th Dec 20257:00 amRNSRevised Date for Admission of Shares to Trading
3rd Dec 202510:07 amRNSOperational Update
5th Nov 20257:00 amRNSMaiden Drilling Programme Commences at Finnsbo
28th Oct 20253:12 pmRNSMotzfeldt Acquisition Completion
22nd Oct 20257:01 amRNSInvestee Company Update
13th Oct 20258:38 amRNSOperational Update
29th Aug 20257:00 amRNSHalf-Yearly Report for 6 Months Ended 31 May 2025
26th Aug 202512:00 pmRNSCorporate Update, Board & Personnel Changes
20th Aug 202511:17 amRNSOperational Update
16th Jul 20257:00 amRNS-RInvestor Webinar
14th Jul 20257:00 amRNSAcquisition & Placing
26th Jun 20258:50 amRNSClogau Update
27th May 20251:14 pmRNSResults of AGM
27th May 20257:00 amRNSOperational Update
16th May 20257:00 amRNSOperational Update
2nd May 20254:11 pmRNSFinal Results and Notice of AGM
29th Apr 20257:00 amRNSGold Coin Sales and Processing Results
14th Apr 202510:15 amRNS-RCommencement of Second Gold Coin Auction
4th Apr 202510:58 amRNSSuccessful Auction Sale of 1oz Gold Coin
28th Mar 20257:00 amRNS-RCommencement of Exclusive Gold Coin Auction
13th Mar 20257:00 amRNSClogau Operational Update
4th Mar 20257:00 amRNSShare Placing
31st Jan 20257:00 amRNSChange of Registered Office
8th Jan 20257:00 amRNSFinnsbo Swedish Rare Earth Transaction Completion
11th Dec 20248:23 amRNSOperational Update
13th Nov 202411:48 amRNSDirector Subscription, Retail Offer & Equity Issue
11th Nov 20247:00 amRNSOption over Tanzanian Gold Licences
6th Nov 202410:06 amRNSRetail Offer
6th Nov 20247:47 amRNSShare Placing & Retail Offer; Rare Earth Project
29th Oct 20247:00 amRNSClogau Operational Update
30th Aug 20247:00 amRNSHalf-Yearly Report and First Blast at Clogau
22nd Jul 20241:38 pmRNSResult of Oversubscribed Retail Offer
18th Jul 20247:01 amRNSRetail Offer
18th Jul 20247:00 amRNSShare Placing and Subscription and Retail Offer
15th Jul 20247:00 amRNSClogau Gold Operational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.