The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Alba Acquires Option Over Andover West Lithium Project in Western Australia

 Alba Acquires Option Over Andover West Lithium Project in Western Australia

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.07
Bid: 0.065
Ask: 0.075
Change: 0.005 (7.69%)
Spread: 0.01 (15.385%)
Open: 0.07
High: 0.07
Low: 0.07
Prev. Close: 0.065
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill Update

28 Jan 2020 07:00

RNS Number : 0779B
Alba Mineral Resources PLC
28 January 2020
 

Alba Mineral Resources plc

("Alba" or the "Company")

 

Horse Hill Oil Field Update

 

Alba Mineral Resources plc (AIM: ALBA), the diversified mineral exploration and development company, announces that it has received the following update from UK Oil & Gas Plc ("UKOG"), the majority owner of Horse Hill Developments Limited ("HHDL"), the operator of Horse Hill licences PEDL 137 and PEDL 246 in which Alba has an 11.765% interest:

 

- HH-1 Portland EWT production was resumed on 16 January 2020. Over the past 24 hours, stable dry-oil EWT production has averaged 293 bopd at a modest drawdown, demonstrating the Portland perforated interval has remained in good condition since the last (June 2019) shut-in.

 

- Further to the announcement of 23 December 2019, the planned well intervention to shut-off water ingress into the HH-2z horizontal is now scheduled for February as no suitable slim-hole production logging tool ("PLT"), essential to identify the exact source of water ingress into HH-2z, was available within the UK or Europe until this time. It is planned to resume the HH-2z EWT immediately following and subject to a successful intervention.

 

- As a result of a successful reservoir pressure "interference" testing campaign, undertaken to assess the degree of communication between Horse Hill-1 ("HH-1") and the new HH-2z horizontal, it is now intended to accelerate the start of up to 25 years of continuous long-term production ("Production") by 6 months.

 

- Subject to Oil and Gas Authority ("OGA") approval, Production is now planned to commence by bringing HH-1 into Production during spring 2020, to be followed by HH-2z upon successful completion of the planned HH-2z extended well test ("EWT") programme.

 

- A revised Horse Hill Field Development Plan ("FDP") has been submitted to the Oil and Gas Authority ("OGA"). Subject to OGA's final consent, it is planned to convert HH-2z from its current EWT status to Production in the third quarter of 2020. The establishment of Production at Horse Hill will be a significant and key milestone as it will enable recoverable Reserves to be allocated to the project.

 

- Necessary additional surface facilities, including generators to produce electric power from associated gas, will be installed prior to Production start. Further possible infill wells, water injection and additional gas utilisation will be addressed via subsequent FDP addenda and submitted to the OGA for consent at the appropriate time.

 

- The HH-1 Kimmeridge interval will now remain shut in for a further long duration pressure build-up test. Plans to install a dual completion to enable HH-1 to produce from both the Portland and Kimmeridge oil pools are being formulated. A future Kimmeridge appraisal/production well is also planned, once full Portland Production and positive cash flow has been established from the field.

 

 

George Frangeskides, Alba's Executive Chairman, commented:

 

"Alba is very pleased to learn of the successful restart of Portland production from the HH-1 well and of the updated plans for the commencement of long-term continuous production at the Horse Hill Oil Field this year." 

 

 

Forward Looking Statements

This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the Company's or any third party's ability to execute and implement future plans, and the occurrence of unexpected events. Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.

 

Qualified Person's Statement

The technical information contained in this announcement has been reviewed and approved by Feroz Sultan (B.Sc (Hons) Geology, M.Sc, Petroleum and Structural Geology, Karachi and M.Sc Petroleum Geology, Imperial College London), a petroleum geologist with over 45 years' experience in the management, exploration, development and production of oil and gas.

 

Glossary

 

horizontal well a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon;

 

oil field an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface; and

 

Production/

long-term production stable oil production over the life of the well and or field during the 20-year Production phase of the licence. The establishment of such production is subject to the OGA's consent of the Field Development Plan

 

production logging

tool (PLT) PLTs measure flowing fluid parameters on a zone-by-zone basis within a producing well. It provides diagnostic information, pinpoints where fluids such as water, oil and gas are entering a well and gives an indication about the efficiency of the perforations. PLTs normally measure four parameters: flow (via a series of spinners which rotate in the flow), density, temperature and pressure. The flow and density readings are used in traditional quantitative production logging analysis, whilst temperature and pressure data are used in more of a qualitative way to compute in-situ flow properties and locate zones of entry of fluids into a well.

 

Reserves Reserves are those quantities of petroleum anticipated to be commercially recoverable by application of development projects to known accumulations from a given date forward under defined conditions. Reserves must further satisfy four criteria: they must be discovered, recoverable, commercial, and remaining (as of the evaluation date) based on the development project(s) applied. Reserves are further categorised in accordance with the level of certainty associated (i.e. proven, probable and possible) with the estimates and may be sub-classified based on project maturity and/or characterised by development and production status.

 

 

well test or "flow test", involves testing a well by flowing hydrocarbons to surface, typically through a test separator; key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate and volumes.

 

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

For further information, please contact:

 

Alba Mineral Resources plc

George Frangeskides, Executive Chairman

+44 20 3907 4297

 

 

 

Cairn Financial Advisers LLP (Nomad)

James Caithie / Liam Murray

+44 20 7213 0880

 

 

 

First Equity Limited (Broker)

Jason Robertson

+44 20 7374 2212

 

 

 

Yellow Jersey PR (Financial PR/ IR)

Sarah Hollins/Harriet Jackson/Henry Wilkinson

alba@yellowjerseypr.com

 

+44 20 3004 9512

 

 

 

Alba's Project and Investment Portfolio

Project (commodity)

Location

Ownership

Mining Projects

Amitsoq (graphite)

Greenland

90%

Clogau (gold)

Wales

90%

Inglefield (copper, cobalt, gold)

Greenland

100%

Limerick (zinc-lead)

Ireland

100%

Melville Bay (iron ore)

Greenland

51%

TBS (ilmenite)

Greenland

100%

Oil & Gas Investments

Brockham (oil)

England

5%

Horse Hill (oil)

England

11.765%

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDSEMEEWESSESF
Date   Source Headline
24th Apr 202411:44 amRNSAlba Acquires Option - Replacement
24th Apr 202411:16 amRNSAlba Acquires Option
2nd Apr 20249:55 amRNSDolgellau Gold Exploration Update
28th Mar 20247:00 amRNSShare Placing
22nd Mar 20247:00 amRNSClogau Gold Mine Update
22nd Feb 20248:51 amRNSClogau Gold Mine and Regional Exploration Update
7th Feb 20247:00 amRNSGreenRoc ML Application and Licence Changes
31st Jan 20247:00 amRNSGreenRoc Update
18th Jan 202412:45 pmRNSClogau Gold Mine Update
22nd Dec 20237:00 amRNSClogau Gold Mine Update
11th Dec 202310:40 amRNSHorse Hill Update
11th Dec 20237:00 amRNSGrant of Share Options
6th Dec 202312:21 pmRNSOperational and Corporate Update
1st Dec 20233:45 pmRNSHolding(s) in Company
22nd Nov 20238:51 amRNSGROC Update: Share Placing
13th Nov 20237:00 amRNSOperational Update
31st Oct 20237:07 amRNSInvestee Company Update
16th Oct 20237:00 amRNSInvestee Company Update
16th Oct 20237:00 amRNSOperational Update
9th Oct 20237:00 amRNSInvestee Company Update
18th Sep 20237:54 amRNSClogau Operational Update
24th Aug 20231:30 pmRNSLive Webinar Event
17th Aug 20237:00 amRNSHalf-year Report
16th Aug 20237:39 amRNSGROC Update - Interim Results
16th Aug 20237:17 amRNSClogau Operational Update
9th Aug 202311:00 amRNSHolding(s) in Company
2nd Aug 20237:00 amRNSGROC Update - Share Placing
27th Jul 20237:00 amRNSGROC Update - Progress at Amitsoq Graphite Project
24th Jul 202311:30 amRNSCompletion of Broker Option & Operational Update
5th Jul 20237:35 amRNSShare Placing
4th Jul 20237:00 amRNSGrant of Dewatering Permits at Welsh Gold Mine
30th May 202310:19 amRNSResult of AGM
24th May 20237:00 amRNSInvestor Q&A Hosted by VOX Markets
15th May 20237:00 amRNSGROC Update: Amitsoq, Virtual Presentation and Q&A
5th May 20234:00 pmRNSPublication of 2022 Annual Report & Notice of AGM
5th May 20237:00 amRNSFinal Results
2nd May 20233:00 pmRNSAppointment of Sole Broker
28th Mar 20238:03 amRNSHorse Hill Update
27th Mar 20237:00 amRNSOperational Update
24th Mar 20234:35 pmRNSPrice Monitoring Extension
24th Mar 20237:00 amRNSGROC Update - Full Year Results
13th Mar 20236:22 pmRNSHolding(s) in Company
6th Mar 20237:00 amRNSGROC update: MoU with Norwegian Mining Group, LNS
1st Mar 20232:00 pmRNSPrice Monitoring Extension
8th Feb 20232:05 pmRNSSecond Price Monitoring Extn
8th Feb 20232:00 pmRNSPrice Monitoring Extension
8th Feb 20237:00 amRNSGROC Update
23rd Jan 20237:00 amRNSGROC:Near Three Times Increase in Amitsoq Resource
20th Jan 20231:54 pmRNSOperational Update
20th Jan 20237:00 amRNSGROC Update - Project Updates

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.