Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Share Price Information for Alba Mineral Resources (ALBA)

Share Price is delayed by 15 minutes
Get Live Data
0.015    -0.001 (-6.25%)
Bid:
0.014
Ask:
0.016
Spread: 0.002 (14.286%)
Market Cap: £4.18m
ALBA Live PriceLast checked at - London Stock Exchange

Intraday Alba Mineral Resources Share Chart

Horse Hill Update

19 Dec 2017 07:00

RNS Number : 7147Z
Alba Mineral Resources PLC
19 December 2017
 

Alba Mineral Resources Plc

("Alba" or the "Company")

 

Operational Update

Horse Hill-1 Oil Discovery, Weald Basin, UK

 

Highlights:

· 150-day production flow test and new drilling programme set to commence in late winter 2017/18

· Programme aims to confirm commerciality of Portland and Kimmeridge oil discoveries and gear-up for first permanent oil production targeted for early 2019

· Drilling of HH-2 appraisal well as future producer to directly follow flow-testing programme

· Permanent production consent application underway, submission to SCC expected in spring 2018

· Swift and successful eviction of protesters completed at Horse Hill site

 

Alba announces that it has been advised by Horse Hill Developments Ltd ("HHDL"), the operator of the Horse Hill-1 ("HH-1") oil discovery, in which entity the Company holds a 18.1% interest, that key contracts and the requisite funding commitments from all participants are in place to undertake the production flow-testing and drilling campaign which was approved by Surrey County Council ("SCC") in October 2017. The 2018 programme is planned to commence directly upon the discharge of SCC's pre-commencement planning conditions, expected by the end of winter 2017/18. Environment Agency approval for the full programme was granted in September 2017.

 

Horse Hill Oil Discovery

 

The HH-1 Portland Sandstone and Kimmeridge Limestone oil discoveries lie within onshore Weald Basin licences PEDL137 and PEDL246 covering an area of 55 square miles (143 km2) north of Gatwick Airport. As previously reported on 21 March 2016, HH-1 flow-tested at a significant commercial aggregate stable dry oil rate of 1,688 barrels of oil per day ("bopd") from the Portland, Kimmeridge Limestone 3 ("KL3") and Kimmeridge Limestone 4 ("KL4") reservoir horizons.

 

2018 Horse Hill Flow Test Programme

 

Following a short period of civil works to upgrade site facilities, a 150-day production testing programme focused upon the Portland, KL3 and KL4 reservoirs will commence. As commercially viable initial flow rates were established by the 2016 flow tests, the 2018 testing programme's goal is to confirm that HH-1's reservoirs are each connected to a commercially viable oil volume, thus enabling a declaration of commerciality to be made.

 

The Portland, KL3 and KL4 flow tests, each planned for around 30-40 days duration, will consist of a sequence of stabilised steady state flow and shut in periods to establish the oil in place ("OIP") directly connected to the well. A short maximum flow-rate test will also be included for each reservoir. If time permits, a further short-term test of a deeper untested Kimmeridge reservoir may be undertaken.

 

Testing will commence with the Portland reservoir which, given the 323 bopd stable pumped rate achieved in 2016 and the 32 million barrels most likely OIP calculated by Xodus in 2017, is considered a strong candidate for commercial viability. Subject to a successful test, a Portland declaration of commerciality is expected to be made by mid-2018. A Kimmeridge declaration of commerciality would follow programme completion and analysis of reservoir engineering data.

 

2018 Horse Hill Drilling Programme

 

Subject to a successful testing outcome in the Kimmeridge and Portland, the HH-2 well is planned as a future Portland producer, with an expected spud towards the end of summer 2018. Drilling plans include optionality to deepen HH-2 into the Kimmeridge to gather core and image log data, together with a possible northwards deviation to access the adjacent oil-bearing Collendean Farm fault block's significant Portland OIP.

 

The HH-1z Kimmeridge sidetrack spud is now planned for 2019 following construction of a Kimmeridge reservoir model utilising HH-1 Kimmeridge production data and any future HH-2 Kimmeridge core.

 

Production Planning Application

 

To achieve its goal of stable, long-term Horse Hill oil production by spring 2019, HHDL now plans to submit a further production planning application to SCC in late spring 2018. This application will seek consent to produce oil initially from HH-1&1z, and HH-2, together with further production wells in a second contingent drilling phase.

 

Horse Hill Eviction

 

We are informed by HHDL that on Saturday 2 December 2017, a 42-person team, including High Court bailiffs and the UK's pre-eminent specialist protester removal contractor, successfully removed around 20 activists who had illegally occupied part of the Horse Hill site since Thursday 30 November 2017.

 

An increased security presence will now remain on the site until completion of the 2018 programme. We understand that HHDL is rigorously pursuing all available legal means to seek recourse for this and any future events that prevent or obstruct its right to conduct its lawful business.

 

George Frangeskides, Alba's Executive Chairman, commented: "We are pleased that, together with our consortium partners and the operator HHDL, we have now clearly mapped the path towards commercial production at Horse Hill. The execution of this programme in 2018 will be a key step towards delivering the goal of commercial production and significant cash flow at Horse Hill."

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

 

 

 

For further information, please contact:

 

Alba Mineral Resources plc

George Frangeskides, Executive Chairman

+44 20 7264 4366

 

Cairn Financial Advisers LLP (Nomad)

James Caithie / Liam Murray

+44 20 7213 0880

 

First Equity Limited (Broker)

Jason Robertson 

+44 20 7374 2212

 

 

Glossary

 

core or coring

a drilling technique that involves using a doughnut-shaped drilling bit to capture or "cut" a continuous cylinder-shaped core of undamaged in-situ rock. The core is captured in a steel pipe or "core barrel" above the bit. Core is normally cut in 30 feet lengths, or multiples of 30 feet, and normally with a diameter of 3.5 or 4 inches. Core is taken in petroleum reservoir rocks for detailed laboratory analyses of petrophysical and geomechanical parameters

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

flow test

a test period where hydrocarbons are flowed to surface through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce oil at a commercial flow rate and to recover oil in commercial quantities or volumes

limestone

a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone, being made of the remains of calcareous planktonic algae called coccoliths. The Kimmeridge Limestones are comprised of fine grained coccoliths, fine grained calcium carbonate mud, clay minerals, together with dark grey organic matter

oil in place (OIP)

the quantity of oil or petroleum that is estimated to exist originally in naturally occurring accumulations before any extraction or production

sandstone

a clastic sedimentary rock whose grains are predominantly sand-sized. The term is commonly used to describe a consolidated and cemented rock made predominantly of quartz grains

sidetrack

re-entry of a well from the well's surface location with drilling equipment for deviating from the existing well bore to achieve production or well data from an alternative zone or bottom hole location

 

 

 

 

Alba's Project Portfolio

 

Oil & Gas

 

Horse Hill (Oil & Gas, UK): Alba holds a 18.1 per cent interest in Horse Hill Developments Limited, the company which has a 65 per cent participating interest and operatorship of the Horse Hill oil and gas project (licences PEDL 137 and PEDL 246) in the UK Weald Basin.

 

Brockham (Oil & Gas, UK): Alba has a direct 5 per cent interest in Production Licence 235, which comprises the previously producing onshore Brockham Oil Field.

 

Mining

 

Amitsoq (Graphite, Greenland): Alba owns a 90 per cent interest in the Amitsoq Graphite Project in Southern Greenland and has an option over the remaining 10 per cent.

 

Black Sands (Ilmenite, Greenland): Alba owns 100 per cent of mineral exploration licences 2017/29 and 2017/39 in the Thule region, north-west Greenland.

 

Clogau (Gold, Wales): Alba owns 49 per cent of Gold Mines of Wales Limited, the owner of the Clogau Gold Project in north Wales incorporating the historic Clogau-St David's Mine.

 

Melville Bay (Iron Ore, Greenland): Alba is entitled to a 51 per cent interest in mineral exploration licence 2017/41 in Melville Bay, north-west Greenland. The licence area benefits from an existing inferred JORC resource of 67 Mt @ 31.4% Fe.

 

Inglefield Land (Copper, Cobalt, Gold): Alba owns 100 per cent of mineral exploration licence 2017/40 in north-west Greenland.

 

Limerick (Base Metals, Ireland): Alba has 100 per cent of the Limerick base metal project in the Republic of Ireland.

 

El Mreiti (Uranium, Mauritania): Alba has applied for the reissue of a uranium permit in northern Mauritania, centred on known uranium-bearing showings.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFFIFAAFWSEDE
Date   Source Headline
28th May 20262:59 pmRNSResults of AGM
20th May 20267:00 amRNSChange of Name to Arkadian Strategic Metals Plc
14th May 202611:19 amRNSAlba Completes Further Motzfeldt Acquisition
5th May 20269:17 amRNSFinal Results and Notice of AGM
30th Apr 20267:00 amRNSOperational Update
9th Mar 20268:00 amRNS-ROperational Update
6th Mar 20267:56 amRNSFinnsbo Project, Sweden
2nd Mar 20267:00 amRNSShare Placing
16th Feb 20268:10 amRNSPhase 1 Motzfeldt Test Work Completed
12th Feb 202611:58 amRNSClogau Operational Update
6th Feb 202612:18 pmRNSResults of General Meeting
23rd Jan 20267:00 amRNS-RAlba Joins Critical Minerals Association
22nd Jan 20267:00 amRNSNotice of General Meeting
19th Dec 20257:00 amRNSClogau Gold Mine Operational Update
19th Dec 20257:00 amRNSClogau Gold Mine Operational Update
16th Dec 20257:00 amRNSRevised Date for Admission of Shares to Trading
3rd Dec 202510:07 amRNSOperational Update
5th Nov 20257:00 amRNSMaiden Drilling Programme Commences at Finnsbo
28th Oct 20253:12 pmRNSMotzfeldt Acquisition Completion
22nd Oct 20257:01 amRNSInvestee Company Update
13th Oct 20258:38 amRNSOperational Update
29th Aug 20257:00 amRNSHalf-Yearly Report for 6 Months Ended 31 May 2025
26th Aug 202512:00 pmRNSCorporate Update, Board & Personnel Changes
20th Aug 202511:17 amRNSOperational Update
16th Jul 20257:00 amRNS-RInvestor Webinar
14th Jul 20257:00 amRNSAcquisition & Placing
26th Jun 20258:50 amRNSClogau Update
27th May 20251:14 pmRNSResults of AGM
27th May 20257:00 amRNSOperational Update
16th May 20257:00 amRNSOperational Update
2nd May 20254:11 pmRNSFinal Results and Notice of AGM
29th Apr 20257:00 amRNSGold Coin Sales and Processing Results
14th Apr 202510:15 amRNS-RCommencement of Second Gold Coin Auction
4th Apr 202510:58 amRNSSuccessful Auction Sale of 1oz Gold Coin
28th Mar 20257:00 amRNS-RCommencement of Exclusive Gold Coin Auction
13th Mar 20257:00 amRNSClogau Operational Update
4th Mar 20257:00 amRNSShare Placing
31st Jan 20257:00 amRNSChange of Registered Office
8th Jan 20257:00 amRNSFinnsbo Swedish Rare Earth Transaction Completion
11th Dec 20248:23 amRNSOperational Update
13th Nov 202411:48 amRNSDirector Subscription, Retail Offer & Equity Issue
11th Nov 20247:00 amRNSOption over Tanzanian Gold Licences
6th Nov 202410:06 amRNSRetail Offer
6th Nov 20247:47 amRNSShare Placing & Retail Offer; Rare Earth Project
29th Oct 20247:00 amRNSClogau Operational Update
30th Aug 20247:00 amRNSHalf-Yearly Report and First Blast at Clogau
22nd Jul 20241:38 pmRNSResult of Oversubscribed Retail Offer
18th Jul 20247:01 amRNSRetail Offer
18th Jul 20247:00 amRNSShare Placing and Subscription and Retail Offer
15th Jul 20247:00 amRNSClogau Gold Operational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.