The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0625
Bid: 0.055
Ask: 0.07
Change: 0.0025 (4.17%)
Spread: 0.015 (27.273%)
Open: 0.0575
High: 0.0625
Low: 0.0575
Prev. Close: 0.06
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Further Update on Horse Hill-1 Flow Test

1 Mar 2016 07:00

RNS Number : 5514Q
Alba Mineral Resources PLC
01 March 2016
 

1 March 2016

ALBA MINERAL RESOURCES PLC

("ALBA" or the "Company")

Further Update on Horse Hill-1 Flow Test

Horse Hill-1 Oil Discovery Flows at a rate of 900 barrels per day from second zone

 

Alba Mineral Resources plc (AIM: ALBA) announces that Horse Hill Developments Limited ("HHDL") has informed the Company that 100%, 40-degree API, light, sweet oil has flowed freely to surface, without pumping, at an average stabilised rate in excess of 900 barrels per day from an 88-foot aggregate perforated zone within the Upper Kimmeridge limestone interval at a depth of approximately 840 metres below ground level.

Restricted flow of 100% dry oil, through a 1-inch choke, using a rod pump, commenced at around 1350 hrs GMT yesterday at an initial instantaneous rate in excess of 700 barrels per day ("bopd"). At circa 1430 hrs the well started flowing freely to surface, without pumping. The free flow rate increased to over 900 bopd at 1500 hrs. The flow of dry oil then stabilised from 1500 hrs to approximately 1800 hrs, at rates averaging in excess of 900 bopd.

Note that as a consequence of flow initialisation via rod pump, the initial natural flow rates stated above were further restricted by the rods within the 2 and 7/8-inch production tubing.

The well was shut in at approximately 1830 hrs yesterday. The well was opened and free 'natural' oil flow recommenced at 2234 hrs yesterday. The well was flowed to obtain a further stabilised flow period and reservoir engineering data. A further update will be provided once this new data is available.

With this stable Upper Kimmeridge limestone flow, the two Upper Kimmeridge and Lower Kimmeridge limestone intervals have now produced a combined average stable rate of over 1,360 bopd.

As previously announced, on completion of this Upper Kimmeridge test, operations will move to the shallower Portland sandstone zone at approximately 615 metres below ground level.

Further Reservoir Engineering Studies

UK Oil and Gas Investments PLC ("UKOG") has commissioned Xodus Group Ltd. to evaluate and interpret the reservoir engineering data collected in the Lower Kimmeridge limestone flow test as reported on February 16 and 17. The results will be reported once available.

Horse Hill-1 Discovery Well and Licence

The exploration drilling phase of the HH-1 discovery well was originally completed at the end of 2014. The well is located within onshore exploration Licence PEDL137, on the northern side of the Weald Basin near Gatwick Airport. ALBA owns a 9.75% interest in PEDL137.

Michael Nott, ALBA's CEO, commented:

"We consider these results to be a further significant event for Alba as they provide unequivocal proof of concept for the Company's new Kimmeridge limestone oil play. The two Kimmeridge flow tests have not only shown that moveable oil exists within the Kimmeridge, but more importantly, that it can be extracted at high commercial rates even from vertical wells without significant stimulation. The Kimmeridge play has moved from science project into the zone of commercial reality.

"The well's natural aggregate flow rate from the Kimmeridge limestones of 1360 bopd looks to be one of the highest natural flow rates recorded in a UK onshore wildcat well since the Wytch Farm discovery in the 1970s. It should be noted that the planned use of horizontal appraisal and development may further significantly enhance production flow rates seen to date.

"Following the final flow test in the overlying Portland, HHDL now plan to move full speed ahead to obtain the necessary permissions to return to the well, drill a horizontal sidetrack and conduct long term production tests."

 

ALBA's interest in Horse Hill

The HH-1 well is located within onshore exploration Licence PEDL137, on the northern side of the Weald Basin near Gatwick Airport. Alba owns a 15% direct interest in HHDL, a special purpose company that owns a 65% participating interest and operatorship of licence PEDL137 and the adjacent Licence PEDL246 in the UK Weald Basin

 

Qualified Person's Statement:

 

Stephen Sanderson, UKOG's Executive Chairman, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

For further information, please contact:

 

Alba Mineral Resources plc

Michael Nott, CEO +44 20 3696 4616

Cairn Financial Advisers LLP

Avi Robinson / James Caithie +44 20 7148 7900

 

Dowgate Capital Stockbrokers Limited

Jason Robertson / Neil Badger +44 1293 517744

 

 

 

Glossary

 

choke

Device incorporating a fixed or variable orifice that is used to control fluid flow rate during testing of an exploratory discovery

degree API

A measure of the density of crude oil as defined by the American Petroleum Institute

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

extended flow test

a flow test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over all zones of greater than 96 hours and up to 90 days maximum.

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate

limestone

a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone

sandstone

a clastic sedimentary rock whose grains are predominantly sand-sized. The term is commonly used to imply consolidated sand or a rock made of predominantly quartz sand.

sweet oil or crude

A type of oil that contains less than 0.42% Sulphur

 

 

Additional Information

Alba holds a 15 per cent interest in Horse Hill Developments Limited, the company which has a 65 per cent participating interest and operatorship of the Horse Hill oil and gas project (licences PEDL 137 and PEDL 246) in the UK Weald Basin.

 

Alba has the right to earn up to 70 per cent of the Amitsoq Graphite Project in Southern Greenland. In addition, the Company holds a base metal licence in the Republic of Ireland, and has applied for the reissue of a uranium permit in northern Mauritania. The new Mauritanian permit will be on a reduced area, and is centred on known uranium-bearing showings.

 

Alba continues actively to review and discuss other project opportunities which have value-enhancing potential for the Company whether by acquisition, farm in or joint venture in a range of jurisdictions around the world

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGBGDXXGGBGLB
Date   Source Headline
1st Aug 20177:00 amRNSGrant of Licence
24th Jul 20172:07 pmRNSHolding(s) in Company
21st Jul 201711:40 amRNSStmnt re Share Price Movement
18th Jul 20177:00 amRNSMultiple New Graphite Beds Discovered at Amitsoq
10th Jul 20177:00 amRNSUpdate on Horse Hill Project
5th Jul 20177:00 amRNSHolding(s) in Company
26th Jun 201712:00 pmRNSBrockham Update
30th May 20179:53 amRNSResult of AGM and Board Change
26th May 20177:00 amRNSAmitsoq Update
11th May 201711:00 amRNSBrockham Update
11th May 20177:00 amRNSBrockham Licence Update
8th May 20171:43 pmRNSAGM Notice
3rd May 20177:00 amRNSFinal Results
12th Apr 20177:00 amRNSAmitsoq Update
4th Apr 20177:00 amRNSHorse Hill Update
10th Mar 20178:09 amRNSBrockham Update
6th Mar 20172:00 pmRNSUpdate Presentation - Amitsoq Graphite Project
3rd Mar 20177:00 amRNSBrockham Update
27th Feb 20174:31 pmRNSCompletion of acquisition of interest in Amitsoq
20th Feb 20177:00 amRNSApproval for Alba Acquiring up to 100% of Amitsoq
14th Feb 20177:00 amRNSLimerick Update
7th Feb 20177:00 amRNSHorse Hill Update
30th Jan 20177:00 amRNSAmitsoq Update
26th Jan 20179:30 amRNSBrockham Update
18th Jan 20177:00 amRNSBrockham Update
13th Jan 20173:34 pmRNSIssue of Share Warrants and Share Options
13th Jan 20172:31 pmRNSExercise of Share Warrants
16th Dec 20164:00 pmRNSLimerick Update
15th Dec 20169:40 amRNSBrockham Oil Field Update
14th Nov 20164:00 pmRNSBrockham Update
1st Nov 20167:00 amRNSAmitsoq Update
25th Oct 20167:00 amRNSLimerick Update
17th Oct 20167:00 amRNSHorse Hill Update
3rd Oct 20163:37 pmRNSAmitsoq Update
22nd Sep 201612:09 pmRNSHolding(s) in Company
19th Sep 20161:38 pmRNSHolding(s) in Company
19th Sep 20167:00 amRNSIssue of Equity
13th Sep 201610:14 amRNSNutech report on Brockham-1 well in Weald Basin
12th Sep 201611:24 amRNSAirborne Electromagnetic Survey over Amitsoq
8th Sep 20167:00 amRNSBulk Sampling Completed at Amitsoq
19th Aug 20169:50 amRNSTotal Voting Rights - Correction
18th Aug 20164:59 pmRNSIssue of Equity and Warrants
9th Aug 201612:26 pmRNSBrockham Update
1st Aug 20167:00 amRNSHalf-year Report
26th Jul 20167:00 amRNSRenewal of Gold Licence
19th Jul 20167:00 amRNSHorse Hill Update
5th Jul 20167:00 amRNSLicence Conversions Granted for Horse Hill Project
16th Jun 201612:50 pmRNSDirector Shareholding
27th May 201610:30 amRNSResult of AGM
26th May 201610:59 amRNSAmitsoq Project Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.