The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAFC Energy Regulatory News (AFC)

Share Price Information for AFC Energy (AFC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 22.50
Bid: 22.05
Ask: 22.45
Change: -0.10 (-0.44%)
Spread: 0.40 (1.814%)
Open: 22.00
High: 22.65
Low: 21.15
Prev. Close: 22.60
AFC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Technology Progression

8 Jan 2018 07:00

RNS Number : 1650B
AFC Energy Plc
08 January 2018
 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. Upon the publication of this announcement via a Regulatory Information Service ("RIS"), this inside information is now considered to be in the public domain.

 

8 January 2018

AFC Energy PLC

 

("AFC Energy" or the "Company")

 

 

AFC Energy Delivers Material Improvement in Fuel Cell System and Electrode Performance Exceeding Targeted 2017 Milestones

 

AFC Energy (AIM: AFC), the industrial fuel cell power company, is pleased to provide an update on the successful operation of the materially enhanced fuel cell stack and cartridge.

Highlights

Fuel Cell Stack, Cartridge and System Design

· The successful development and operational validation of the enhanced fuel cell stack and cartridge basis of design that incorporates numerous design enhancements initiated over the past 12 months;

 

· This enhanced commercial design basis exhibits substantial progression against targeted Performance, Longevity, Availability, Cost and Efficiency ("P.L.A.C.E.") objectives set for 2017 in line with the minimum expected performance criteria of a commercial fuel cell system;

 

· The results achieved to date from operating the fuel cell provide outputs which closely match the results observed from months of extensive computational simulation, therefore providing further confidence in the overall performance of the fuel cell;

 

· This enhanced fuel cell stack and cartridge has demonstrated the ability to meet multiple power cycling steps without loss of performance.

Electrode Performance

· The latest electrode pairings, developed in collaboration with Industrie De Nora ("De Nora"), and tested during December 2017, exhibit significantly extended operational life for the fuel cell electrodes and significantly exceeds the longevity targets we set for 2017

 

· AFC Energy and De Nora planning is now undertaking the ongoing testing work for delivery of an electrode pairing that will achieve a four-year operational life with associated performance warranties and at a cost which should see AFC Energy's Levelised Cost of Electricity at below US$0.10 / kWh - excluding the cost of Hydrogen which varies from project to project and consistent with previous calculations.

Throughout the course of 2017, AFC Energy has built upon the intensive work that had taken place over the prior two years to deliver a commercial basis of design of its fuel cell system capable of delivering the Company's commercial performance metrics in the form of P.L.A.C.E.

In December 2017, the Company compiled its first fuel cell stack adopting a range of new system design characteristics, including:

1. New design of hydrogen, electrolyte and air plates following significant computational fluid dynamic simulation, which results in improved gas, liquid, temperature and pressure regulation within the fuel cell system and also addresses underlying legacy design observations which have previously led to premature failure of the fuel cell stack;

 

2. Integration of the new electrode pairings within a new flow plate design, removing the need for expensive nickel substrates whilst also enlarging the size of the active area of the electrode, thereby improving cell output and performance;

 

3. Fully redesigned cartridge system with reduced number of nozzles and simplified orientation for the gas and liquid inlet and outlet nozzles based upon the revised flow plate design;

 

4. Reconfiguration of the balance of plant to facilitate the above changes and which address legacy design inefficiencies observed in the earlier KORE system.

In parallel with the above activities, significant progress has been achieved in collaboration with De Nora in further iterations of the fuel cell electrode pairings (cathode and anode). Whilst AFC Energy froze its electrode design for the validation of its enhanced fuel cell stack design in Q3 2017, progress continued, with De Nora, via testing of smaller scale electrode samples, which is a routine development method, to further optimise the electrode performance. The results achieved to date, being approximately two month's operation, suggest this electrode pairing has the potential, on an extrapolated basis, to exceed the targeted one-year operational life objective set for 2017 and indeed, is likely to have the capacity to operate for a period more than 24 months. In December 2017, the latest electrode design was received at a size suitable for industrial scale applications and this pairing is on test at the Company's facilities in Surrey.

In December 2017, De Nora and AFC Energy commenced work on a programme of activities that will further enhance the electrode performance to a point where the objective is to achieve a cathode and anode pairing capable of operating for a period of up to four years.

The validation of the enhanced fuel cell system at electrode, stack and cartridge level, continued throughout the Christmas and New Year period and is ongoing.

Adam Bond, AFC Energy's Chief Executive Officer, said: "I am delighted to confirm that, following a period of rapid progress, we have through deliberate design changes successfully validated the revised basis for the Company's commercial fuel cell system whilst also, in collaboration with De Nora, achieving massive strides forward in electrode performance. This enhanced fuel cell system upgrade builds on the work of many individuals closely collaborating with our technology partners and is expected to provide the cornerstone of a commercial fuel cell system that is now capable of achieving the Company's PLACE metrics. Completion of this work within a three-year window was always going to be challenging, however, we are today seeing the fruits of our labour as we progress into a very exciting 2018."

Further details about the progress outlined in this announcement will be provided in the Quarterly Newsletter, to be issued later in January. Notwithstanding any further significant developments in the coming months, AFC Energy expects to provide its next progress update when it announces its annual results for the financial year-ended 31 October 2017, in March 2018.

 

 

 

 

For further information, please contact:

AFC Energy plc

Adam Bond (Chief Executive Officer)

 

 

+44 (0) 20 3697 1209

Cantor Fitzgerald Europe Nominated Adviser and Joint Broker

Andrew Craig

Richard Salmond 

 

+44 (0) 20 7894 7000

M C Peat & Co LLP Joint Broker

Charlie Peat

 

+44 (0) 20 7104 2334

Lionsgate Communications Public Relations

Jonathan Charles

 

+44 (0) 20 3697 1209

 

About AFC Energy

 

AFC Energy plc has developed and successfully demonstrated an alkaline fuel cell system, which converts hydrogen into "clean" electricity. AFC Energy's key project POWER-UP demonstrated the world's largest operational alkaline fuel cell system at Air Products' industrial gas plant in Stade, Germany. The Company is now looking to build upon the current pipeline of commercial opportunities and drive the findings from the development phase of the technology into a technically optimised and commercially relevant fuel cell system. For further information, please visit our website: www.afcenergy.com 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDGGDBXXGBGIR
Date   Source Headline
23rd Nov 202211:49 amRNSHS2 Fuel Cell Tower
7th Nov 20227:00 amRNSMethanol Fuel Tower Field Trial
3rd Oct 20227:00 amRNSACCIONA Power Tower Deployment
29th Sep 20227:02 amRNSAppointment of Chief Financial Officer
2nd Sep 202212:30 pmRNSLaunch of SAYE scheme and Director Dealing
26th Aug 20221:38 pmRNSDirector / PDMR Shareholding
3rd Aug 20227:00 amRNSBlock Listing Six Monthly Return
25th Jul 20227:00 amRNSExercise of Share Options and Total Voting Right
12th Jul 20227:00 amRNSGrant of Share Options
11th Jul 20227:00 amRNSMace Dragados to lease AFC Power Tower for UK site
29th Jun 20227:00 amRNSInterim Results
27th Jun 20227:00 amRNSLaunch of New Corporate Website and Brand Refresh
24th Jun 20221:40 pmRNSResults of General Meeting
20th Jun 20227:00 amRNSKier Pioneers Zero Emission Hydrogen Fuel Cell
30th May 20222:00 pmRNSNotice of General Meeting
28th Apr 202211:19 amRNSUrban Air Port Update
19th Apr 20227:00 amRNSTotal Voting Rights
7th Apr 20223:49 pmRNSAnnual General Meeting Results
7th Apr 20227:00 amRNS“Power Tower EV” Integrating ABB Charging Platform
24th Mar 20227:00 amRNSNew Product Launch
14th Mar 20227:00 amRNSKeltbray to Lease First Hybrid Fuel Cell System
11th Mar 202210:55 amRNSAnnual Report & Accounts 2021 and Notice of AGM
9th Mar 20227:00 amRNSFinal Results for Year Ended 31 October 2021
1st Mar 20227:00 amRNSACCIONA to Deploy First Hybrid Fuel Cell System
2nd Feb 20227:00 amRNSExtreme E 2022 Season Contract
31st Jan 20226:00 pmRNSBlock Listing Six Monthly Return
31st Jan 20226:00 pmRNSBlock Listing Application
31st Jan 20227:00 amRNSDirector/PDMR Shareholding
16th Dec 20217:00 amRNSYear End Operating Statement
3rd Dec 20217:00 amRNSAppointment of Non-Executive Director
1st Dec 20217:00 amRNSSelection for ZeroCoaster Bulk Cargo Ship Design
19th Nov 20217:00 amRNSDirector/PDMR Shareholding
17th Nov 20217:00 amRNSDirector/PDMR Shareholding
16th Nov 20217:00 amRNSABB Sale and Development Agreement
3rd Nov 202112:00 pmRNSHRH Prince of Wales Visit COP26
19th Oct 20217:00 amRNSDirector/PDMR Shareholding
11th Oct 20217:00 amRNSTotal Voting Rights
7th Oct 20218:59 amRNSDirector / PDMR Shareholding
6th Oct 20215:30 pmRNSDirector / PDMR Shareholding
5th Oct 20215:30 pmRNSDirector / PDMR Shareholding
28th Sep 20217:00 amRNSAppointment of Nominated Adviser and Joint Broker
27th Sep 20217:00 amRNSExtreme E Mid-Season Update
16th Sep 20217:00 amRNSAFC Energy and Urban-Air Port Partnership
7th Sep 20217:00 amRNSGrant of Share Options
3rd Sep 20217:00 amRNSTotal Voting Rights
16th Aug 20217:00 amRNSFirst Hydrogen Fuel Cell System Delivered to ABB
12th Aug 20217:00 amRNSDirector/PDMR Shareholding
2nd Aug 20217:00 amRNSBlock listing Interim Review
2nd Aug 20217:00 amRNSTotal Voting Rights
29th Jun 20217:00 amRNSIssue of Equity and Grant of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.