The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAFC Energy Regulatory News (AFC)

Share Price Information for AFC Energy (AFC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 20.00
Bid: 20.05
Ask: 20.45
Change: -0.40 (-1.96%)
Spread: 0.40 (1.995%)
Open: 19.76
High: 21.00
Low: 19.76
Prev. Close: 20.40
AFC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Technology Progression

8 Jan 2018 07:00

RNS Number : 1650B
AFC Energy Plc
08 January 2018
 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. Upon the publication of this announcement via a Regulatory Information Service ("RIS"), this inside information is now considered to be in the public domain.

 

8 January 2018

AFC Energy PLC

 

("AFC Energy" or the "Company")

 

 

AFC Energy Delivers Material Improvement in Fuel Cell System and Electrode Performance Exceeding Targeted 2017 Milestones

 

AFC Energy (AIM: AFC), the industrial fuel cell power company, is pleased to provide an update on the successful operation of the materially enhanced fuel cell stack and cartridge.

Highlights

Fuel Cell Stack, Cartridge and System Design

· The successful development and operational validation of the enhanced fuel cell stack and cartridge basis of design that incorporates numerous design enhancements initiated over the past 12 months;

 

· This enhanced commercial design basis exhibits substantial progression against targeted Performance, Longevity, Availability, Cost and Efficiency ("P.L.A.C.E.") objectives set for 2017 in line with the minimum expected performance criteria of a commercial fuel cell system;

 

· The results achieved to date from operating the fuel cell provide outputs which closely match the results observed from months of extensive computational simulation, therefore providing further confidence in the overall performance of the fuel cell;

 

· This enhanced fuel cell stack and cartridge has demonstrated the ability to meet multiple power cycling steps without loss of performance.

Electrode Performance

· The latest electrode pairings, developed in collaboration with Industrie De Nora ("De Nora"), and tested during December 2017, exhibit significantly extended operational life for the fuel cell electrodes and significantly exceeds the longevity targets we set for 2017

 

· AFC Energy and De Nora planning is now undertaking the ongoing testing work for delivery of an electrode pairing that will achieve a four-year operational life with associated performance warranties and at a cost which should see AFC Energy's Levelised Cost of Electricity at below US$0.10 / kWh - excluding the cost of Hydrogen which varies from project to project and consistent with previous calculations.

Throughout the course of 2017, AFC Energy has built upon the intensive work that had taken place over the prior two years to deliver a commercial basis of design of its fuel cell system capable of delivering the Company's commercial performance metrics in the form of P.L.A.C.E.

In December 2017, the Company compiled its first fuel cell stack adopting a range of new system design characteristics, including:

1. New design of hydrogen, electrolyte and air plates following significant computational fluid dynamic simulation, which results in improved gas, liquid, temperature and pressure regulation within the fuel cell system and also addresses underlying legacy design observations which have previously led to premature failure of the fuel cell stack;

 

2. Integration of the new electrode pairings within a new flow plate design, removing the need for expensive nickel substrates whilst also enlarging the size of the active area of the electrode, thereby improving cell output and performance;

 

3. Fully redesigned cartridge system with reduced number of nozzles and simplified orientation for the gas and liquid inlet and outlet nozzles based upon the revised flow plate design;

 

4. Reconfiguration of the balance of plant to facilitate the above changes and which address legacy design inefficiencies observed in the earlier KORE system.

In parallel with the above activities, significant progress has been achieved in collaboration with De Nora in further iterations of the fuel cell electrode pairings (cathode and anode). Whilst AFC Energy froze its electrode design for the validation of its enhanced fuel cell stack design in Q3 2017, progress continued, with De Nora, via testing of smaller scale electrode samples, which is a routine development method, to further optimise the electrode performance. The results achieved to date, being approximately two month's operation, suggest this electrode pairing has the potential, on an extrapolated basis, to exceed the targeted one-year operational life objective set for 2017 and indeed, is likely to have the capacity to operate for a period more than 24 months. In December 2017, the latest electrode design was received at a size suitable for industrial scale applications and this pairing is on test at the Company's facilities in Surrey.

In December 2017, De Nora and AFC Energy commenced work on a programme of activities that will further enhance the electrode performance to a point where the objective is to achieve a cathode and anode pairing capable of operating for a period of up to four years.

The validation of the enhanced fuel cell system at electrode, stack and cartridge level, continued throughout the Christmas and New Year period and is ongoing.

Adam Bond, AFC Energy's Chief Executive Officer, said: "I am delighted to confirm that, following a period of rapid progress, we have through deliberate design changes successfully validated the revised basis for the Company's commercial fuel cell system whilst also, in collaboration with De Nora, achieving massive strides forward in electrode performance. This enhanced fuel cell system upgrade builds on the work of many individuals closely collaborating with our technology partners and is expected to provide the cornerstone of a commercial fuel cell system that is now capable of achieving the Company's PLACE metrics. Completion of this work within a three-year window was always going to be challenging, however, we are today seeing the fruits of our labour as we progress into a very exciting 2018."

Further details about the progress outlined in this announcement will be provided in the Quarterly Newsletter, to be issued later in January. Notwithstanding any further significant developments in the coming months, AFC Energy expects to provide its next progress update when it announces its annual results for the financial year-ended 31 October 2017, in March 2018.

 

 

 

 

For further information, please contact:

AFC Energy plc

Adam Bond (Chief Executive Officer)

 

 

+44 (0) 20 3697 1209

Cantor Fitzgerald Europe Nominated Adviser and Joint Broker

Andrew Craig

Richard Salmond 

 

+44 (0) 20 7894 7000

M C Peat & Co LLP Joint Broker

Charlie Peat

 

+44 (0) 20 7104 2334

Lionsgate Communications Public Relations

Jonathan Charles

 

+44 (0) 20 3697 1209

 

About AFC Energy

 

AFC Energy plc has developed and successfully demonstrated an alkaline fuel cell system, which converts hydrogen into "clean" electricity. AFC Energy's key project POWER-UP demonstrated the world's largest operational alkaline fuel cell system at Air Products' industrial gas plant in Stade, Germany. The Company is now looking to build upon the current pipeline of commercial opportunities and drive the findings from the development phase of the technology into a technically optimised and commercially relevant fuel cell system. For further information, please visit our website: www.afcenergy.com 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDGGDBXXGBGIR
Date   Source Headline
8th May 20247:00 amRNSIlluming Power Produce Fuel Cell Plates and Stacks
2nd May 20247:00 amRNSGrant of Share Options
25th Apr 20242:00 pmRNSAGM Results and Appointment of SID
25th Apr 202412:00 pmRNSBlock Listing Return
10th Apr 20247:00 amRNSNotice of Capital Markets Event
28th Mar 20241:00 pmRNSNotice of 2024 AGM
26th Mar 20247:00 amRNSQ&A session via Investor Meet Company
15th Mar 20241:00 pmRNSTotal Voting Rights
14th Mar 20247:00 amRNSS Series Fuel Cell Operating Cost Milestone
11th Mar 20247:00 amRNSFirst Factory Acceptance Test of 30kW Generator
4th Mar 20247:00 amRNSGenerator Attestation of Conformity for CE Mark
28th Feb 20247:00 amRNSAmmonia Cracker Milestones Achieved
26th Jan 20247:00 amRNSFunding Secured for Maritime Ammonia Cracker Trial
18th Dec 20237:00 amRNSAppointment of Additional Corporate Broker
4th Dec 20237:00 amRNSWorld First Ammonia Cracking Pilot
17th Nov 20237:00 amRNSPurchase of Assets from Octopus Hydrogen
15th Nov 20237:00 amRNSLaunch of Speedy Hydrogen Solutions & First Orders
25th Oct 20237:00 amRNSBlock Listing Return and Correction
23rd Oct 202312:00 pmRNSLaunch of 2023 SAYE Scheme
23rd Oct 20237:00 amRNSAmmonia Cracker Technology Milestone Achieved
4th Sep 20237:00 amRNSExclusive Distribution Agreement with TAMGO
8th Aug 202310:41 amRNSDirector/PDMR Shareholding
31st Jul 20237:00 amRNSInterim Results
28th Jul 20237:00 amRNSProposed Launch of Speedy Hire Joint Venture
27th Jul 20237:00 amRNSAppointment of Non-Executive Director
26th Jul 20237:00 amRNSAFC Energy Secures £4.3m UK Government Grant
18th Jul 20237:00 amRNSStade Update
16th Jun 20232:01 pmRNSDirector/PDMR Shareholding
6th Jun 20237:00 amRNSBoard Changes
1st Jun 20233:52 pmRNSDirector/PDMR Shareholding
1st Jun 20237:00 amRNSGrant of Share Options
11th May 20237:00 amRNSNon-Executive Director Retirement
2nd May 20239:25 amRNSDirector/PDMR Shareholding
28th Apr 20237:00 amRNSGrant of Options
28th Apr 20237:00 amRNSNotice of Investor Presentation
28th Apr 20237:00 amRNSAnnual General Meeting Results
25th Apr 20233:58 pmRNSBlock Listing Return
21st Apr 20236:03 pmRNSAnnual Financial Report
19th Apr 20237:00 amRNSACCIONA Orders First 50kVA H-Power Generator
4th Apr 20237:00 amRNSNotice of AGM
29th Mar 20237:05 amRNSABB E-mobility Follow On Investment
29th Mar 20237:00 amRNSABB Milestone Validation
23rd Mar 20237:00 amRNS“Ammonia to Hydrogen” Cracker Technology Launch
9th Mar 20237:00 amRNSH-Power Tower Deployment Update
7th Mar 20237:00 amRNSAppointment of New Business Development Manager
17th Jan 20234:40 pmRNSSecond Price Monitoring Extn
17th Jan 20234:35 pmRNSPrice Monitoring Extension
1st Dec 20227:00 amRNSPeter Dixon Clarke Appointment
23rd Nov 202211:49 amRNSHS2 Fuel Cell Tower
7th Nov 20227:00 amRNSMethanol Fuel Tower Field Trial

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.