The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.75
Bid: 0.70
Ask: 0.80
Change: 0.00 (0.00%)
Spread: 0.10 (14.286%)
Open: 0.75
High: 0.75
Low: 0.75
Prev. Close: 0.75
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Initial Metallurgical Test-work Results

2 Feb 2017 11:45

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Initial Metallurgical Test-work Results

Armadale, the AIM quoted investment company focused on natural resource projects in Africa, is pleased to announce the receipt of the first phase of metallurgical test-work results from a bulk sample from a test pit on the Mahenge Liandu graphite project in Tanzania (‘Mahenge Liandu’ or the ‘Project’). The sample produced high concentrate grades of up to 99.1% total graphitic carbon (‘TGC’), without the use of toxic industrial chemicals. Furthermore flake distribution was also reported with 61% of flake size measured in the Super Jumbo, Jumbo and Large flake categories.

Highlights of the metallurgical results:

Metallurgical test-work on a total 10kg sample taken from a test pit within the current resource area of the Project produced high-grade concentrate of up to 99.1% TGC for the large size fraction. Flake distribution was also reported with 61% of flake size measured in the Super Jumbo, Jumbo and Large flake categories Importantly, no toxic industrial chemicals were used to produce the concentrate and the graphite was recovered via an environmentally friendly, low cost crushing and flotation process. Multi element analysis showed low levels of potentially deleterious elements within the sample. Concentrate samples will be sent to a German metallurgical laboratory with the aim of producing concentrates suitable for further processing into spherical graphite, which is used in battery manufacturing. Results strengthen recently defined maiden JORC compliant inferred mineral resource estimate of 40.9Mt @ 9.41% TGC, which includes at least 32Mt at an average grade of 10.47% TGC.

William Frewen, Chairman of Armadale said, “Having produced a graphite concentrate at 99.1% TGC via environmentally friendly, low cost extraction processes, these metallurgical results mark a key step in proving what we believe to be the commercial viability of Mahenge Liandu. The high purity achieved from the first test work programme and outstanding flake distribution is a tremendous outcome. These results coupled with the large tonnage high grade Resource is highly encouraging and Armadale is fully committed to an ongoing work programme to confirm the potential of the deposit to produce commercial grade graphite concentrates suitable to produce both spherical and expandable graphite. Accordingly, the Board is moving ahead with marketing plans, with the emphasis on prospective European and Chinese customers initially. Within the next few months Armadale’s team should be in a position to start sending prospective customers samples of graphite concentrate for independent testing.

The results of the floatation test-work showed excellent flake size distribution with 28.1% in the jumbo and super jumbo categories. A further 32.9% is in the large size fraction where purity of 99.1% TGC was returned. All size fractions above 25 microns returns +97% TGC with a weighted average TGC grade across all size fractions of 98.5% TGC. The test work was conducted at ALS laboratories In Perth Australia. The results on all size fractions are shown in table 1 below;

Size

Weight

TGC

(µm)

(%)

%

500 3.7 98.4
300 24.4 98.5
180 32.9 99.1
150 11.7 98.9
106 11.9 98.9
75 7.5 98.7
25 6.2 97.9
-25 1.7 88.4

Table 1 Flake size and grade distribution for Mahenge Liandu Graphite Test Pit sample

William Frewen, Chairman of Armadale added

“Looking at the wider market dynamics, according to industry experts, Benchmark Mineral Intelligence (‘BMI’), the outlook for spherical graphite, which is used in battery manufacturing, remains robust. For instance, Hitachi Chem (the second largest anode producer globally) has announced plans to increase spherical graphite production four-fold to 100,000 tpa by 2020, while CATL (one of China’s largest battery manufacturers) is targeting capacity to reach 50GWh within 3-4 years. In addition, BMI believes that growing demand for fire retardants is also propelling demand for expandable graphite. With favourable pricing dynamics, a significant high-grade resource and potential for commercially attractive extraction routes, we are committed to advancing Mahenge Liandu at an accelerated pace.”

Conclusion

These result of the first test work completed to date metallurgical results demonstrate that Mahenge Liandu can produce a high grade concentrate with a simple crushing and floatation process. Further test work is ongoing into the potential for the deposit to produce commercial grade graphite concentrates suitable for use in the production of spherical and expandable graphite. These developments are timely given that demand for both these graphite products continues to gain momentum.

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

**ENDS**

Enquiries:
Armadale Capital Plc

Charles Zorab, Company Secretary

+44 20 7233 1462
Nomad and broker: finnCap Ltd

Christopher Raggett / Simon Hicks

+44 20 7220 0500
Joint Broker: Beaufort Securities Limited

Jon Belliss

+44 20 7382 8300
Press Relations: St Brides Partners Ltd

Susie Geliher / Charlotte Page

+44 20 7236 1177

Notes

Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant inferred mineral resource estimate of 40.9Mt @ 9.41% TGC. At least 32Mt of this resource has an average grade of 10.47% TGC, one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu’s potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Other assets Armadale has an interest in include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments.

More information can be found on the website www.armadalecapitalplc.com

View source version on businesswire.com: http://www.businesswire.com/news/home/20170202005577/en/

Copyright Business Wire 2017

Date   Source Headline
7th Sep 20177:00 amBUSExceptional Graphite Concentrate of up to 99.1% Graphitic Carbon Produced from Mahenge Liandu
17th Aug 20177:00 amBUS1.2km Mineralised Strike Identified at Mahenge Liandu Graphite Project
1st Aug 20177:00 amBUSExcellent Drilling Results Continue at Mahenge Liandu Graphite Project
19th Jul 20177:00 amBUSExploration Update at Mahenge Liandu Graphite Project, Tanzania
13th Jul 201712:01 pmBUSConvertible Note Update
4th Jul 20172:31 pmBUSTanzanian Legislation
26th Jun 20174:35 pmBUSResult of AGM
26th Jun 20177:00 amBUSAGM Statement
21st Jun 20177:00 amBUSExploration Update: Trenching Intercepts Wide Zones of High Grade Graphite
5th Jun 20177:00 amBUSUpdate on 2017 Exploration Programme at Mahenge Liandu Graphite Project
2nd Jun 20177:00 amBUSFinal Results
3rd May 20177:00 amBUSGraphite Concentrate Upgraded to Purity of up to 99.99% Graphitic Carbon
21st Apr 20179:31 amBUSExcellent Test Results for Mahenge Liandu Graphite Concentrate
29th Mar 20177:00 amBUS2017 Mahenge Liandu Exploration Programme Commenced: Targeting Resource Increase and Upgrade
28th Feb 201712:47 pmBUSDirectorate change
2nd Feb 201711:45 amBUSInitial Metallurgical Test-work Results
23rd Jan 20172:16 pmBUSDirector/PDMR Dealing
20th Jan 20174:12 pmBUSNew Corporate Website - Replacement
20th Jan 20173:40 pmBUSNew Corporate Website
18th Jan 20177:00 amBUSPlacing to Raise £650,000
5th Jan 20177:00 amBUSNumber of Shares in Issue
8th Dec 20167:00 amBUSMaiden JORC Compliant Mineral Resource Estimate of 40.9Mt @ 9.41% Total Graphitic Content
5th Dec 20167:00 amBUSJoint Venture Agreement Proceeding on Mpokoto Gold Project
11th Nov 201610:00 amBUSHolding(s) in Company
8th Nov 20167:00 amBUSInitial Assay Results Confirm High-Grade Graphite Mineralisation up to 26% TGC
2nd Nov 20169:45 amBUSHolding(s) in Company
26th Oct 20167:00 amBUS85% Strike Rate of High Grade Graphite Mineralisation from Drilling at Mahenge Liandu, Tanzania
18th Oct 20167:00 amBUSDirectorate change
18th Oct 20167:00 amBUSPositive Drill Results from Mahenge Liandu Graphite Project
11th Oct 20167:00 amBUSIssue of Equity
7th Oct 20167:00 amBUSDiscovery of High-Grade Coarse Flake Graphite Mineralisation Mahenge Liandu Project
28th Sep 20167:39 amBUSBinding HOA to Form Joint Venture to Develop Mpokoto and Directorate Change
23rd Sep 20167:00 amBUSDrilling Commences at the Mahenge Liandu Graphite Project, Tanzania
22nd Sep 20167:00 amBUSInterim Results
16th Aug 20167:00 amBUSGeological Mapping Identifies Extensive Outcropping Mineralisation at Mahenge Liandu Graphite Project, Tanzania
10th Aug 20167:00 amBUSDirectorate Change
28th Jul 20168:00 amBUSDirector/PDMR Shareholding
25th Jul 20167:00 amBUSEM Survey Defines Multiple Drill Targets at Mahenge Liandu Graphite Project, Tanzania
21st Jul 20167:00 amBUSDirectorate change
13th Jul 20169:35 amBUSHolding(s) in Company
11th Jul 20167:00 amBUSCompletes Acquisition of High Grade Graphite Project in Tanzania
24th Jun 201611:35 amBUSResult of AGM
23rd Jun 201612:00 pmBUSRaises £825,000 to Advance High Grade Liandu Graphite Project, Tanzania
20th Jun 201611:30 amBUSHigh Grade Graphite Mineralisation Confirmed at Liandu Project
2nd Jun 20167:00 amBUSProposed acquisition of a High Grade Coarse Flake Graphite Project in Tanzania
20th May 20167:00 amBUSFinal Results and Notice of AGM
3rd May 20167:00 amBUSArmadale Capital Plc (‘Armadale’ or ‘the Company’) Update on Exploration Programme at Mpokoto
7th Apr 201611:00 amBUSHolding(s) in Company
21st Mar 20164:15 pmBUSHolding(s) in Company
16th Mar 20163:40 pmBUSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.