Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

  • There is currently no data for ACP

Initial Metallurgical Test-work Results

2 Feb 2017 11:45

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Initial Metallurgical Test-work Results

Armadale, the AIM quoted investment company focused on natural resource projects in Africa, is pleased to announce the receipt of the first phase of metallurgical test-work results from a bulk sample from a test pit on the Mahenge Liandu graphite project in Tanzania (‘Mahenge Liandu’ or the ‘Project’). The sample produced high concentrate grades of up to 99.1% total graphitic carbon (‘TGC’), without the use of toxic industrial chemicals. Furthermore flake distribution was also reported with 61% of flake size measured in the Super Jumbo, Jumbo and Large flake categories.

Highlights of the metallurgical results:

Metallurgical test-work on a total 10kg sample taken from a test pit within the current resource area of the Project produced high-grade concentrate of up to 99.1% TGC for the large size fraction. Flake distribution was also reported with 61% of flake size measured in the Super Jumbo, Jumbo and Large flake categories Importantly, no toxic industrial chemicals were used to produce the concentrate and the graphite was recovered via an environmentally friendly, low cost crushing and flotation process. Multi element analysis showed low levels of potentially deleterious elements within the sample. Concentrate samples will be sent to a German metallurgical laboratory with the aim of producing concentrates suitable for further processing into spherical graphite, which is used in battery manufacturing. Results strengthen recently defined maiden JORC compliant inferred mineral resource estimate of 40.9Mt @ 9.41% TGC, which includes at least 32Mt at an average grade of 10.47% TGC.

William Frewen, Chairman of Armadale said, “Having produced a graphite concentrate at 99.1% TGC via environmentally friendly, low cost extraction processes, these metallurgical results mark a key step in proving what we believe to be the commercial viability of Mahenge Liandu. The high purity achieved from the first test work programme and outstanding flake distribution is a tremendous outcome. These results coupled with the large tonnage high grade Resource is highly encouraging and Armadale is fully committed to an ongoing work programme to confirm the potential of the deposit to produce commercial grade graphite concentrates suitable to produce both spherical and expandable graphite. Accordingly, the Board is moving ahead with marketing plans, with the emphasis on prospective European and Chinese customers initially. Within the next few months Armadale’s team should be in a position to start sending prospective customers samples of graphite concentrate for independent testing.

The results of the floatation test-work showed excellent flake size distribution with 28.1% in the jumbo and super jumbo categories. A further 32.9% is in the large size fraction where purity of 99.1% TGC was returned. All size fractions above 25 microns returns +97% TGC with a weighted average TGC grade across all size fractions of 98.5% TGC. The test work was conducted at ALS laboratories In Perth Australia. The results on all size fractions are shown in table 1 below;

Size

Weight

TGC

(µm)

(%)

%

500 3.7 98.4
300 24.4 98.5
180 32.9 99.1
150 11.7 98.9
106 11.9 98.9
75 7.5 98.7
25 6.2 97.9
-25 1.7 88.4

Table 1 Flake size and grade distribution for Mahenge Liandu Graphite Test Pit sample

William Frewen, Chairman of Armadale added

“Looking at the wider market dynamics, according to industry experts, Benchmark Mineral Intelligence (‘BMI’), the outlook for spherical graphite, which is used in battery manufacturing, remains robust. For instance, Hitachi Chem (the second largest anode producer globally) has announced plans to increase spherical graphite production four-fold to 100,000 tpa by 2020, while CATL (one of China’s largest battery manufacturers) is targeting capacity to reach 50GWh within 3-4 years. In addition, BMI believes that growing demand for fire retardants is also propelling demand for expandable graphite. With favourable pricing dynamics, a significant high-grade resource and potential for commercially attractive extraction routes, we are committed to advancing Mahenge Liandu at an accelerated pace.”

Conclusion

These result of the first test work completed to date metallurgical results demonstrate that Mahenge Liandu can produce a high grade concentrate with a simple crushing and floatation process. Further test work is ongoing into the potential for the deposit to produce commercial grade graphite concentrates suitable for use in the production of spherical and expandable graphite. These developments are timely given that demand for both these graphite products continues to gain momentum.

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

**ENDS**

Enquiries:
Armadale Capital Plc

Charles Zorab, Company Secretary

+44 20 7233 1462
Nomad and broker: finnCap Ltd

Christopher Raggett / Simon Hicks

+44 20 7220 0500
Joint Broker: Beaufort Securities Limited

Jon Belliss

+44 20 7382 8300
Press Relations: St Brides Partners Ltd

Susie Geliher / Charlotte Page

+44 20 7236 1177

Notes

Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant inferred mineral resource estimate of 40.9Mt @ 9.41% TGC. At least 32Mt of this resource has an average grade of 10.47% TGC, one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu’s potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Other assets Armadale has an interest in include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments.

More information can be found on the website www.armadalecapitalplc.com

View source version on businesswire.com: http://www.businesswire.com/news/home/20170202005577/en/

Copyright Business Wire 2017

Date   Source Headline
28th Jul 20168:00 amBUSDirector/PDMR Shareholding
25th Jul 20167:00 amBUSEM Survey Defines Multiple Drill Targets at Mahenge Liandu Graphite Project, Tanzania
21st Jul 20167:00 amBUSDirectorate change
13th Jul 20169:35 amBUSHolding(s) in Company
11th Jul 20167:00 amBUSCompletes Acquisition of High Grade Graphite Project in Tanzania
24th Jun 201611:35 amBUSResult of AGM
23rd Jun 201612:00 pmBUSRaises £825,000 to Advance High Grade Liandu Graphite Project, Tanzania
20th Jun 201611:30 amBUSHigh Grade Graphite Mineralisation Confirmed at Liandu Project
2nd Jun 20167:00 amBUSProposed acquisition of a High Grade Coarse Flake Graphite Project in Tanzania
20th May 20167:00 amBUSFinal Results and Notice of AGM
3rd May 20167:00 amBUSArmadale Capital Plc (‘Armadale’ or ‘the Company’) Update on Exploration Programme at Mpokoto
7th Apr 201611:00 amBUSHolding(s) in Company
21st Mar 20164:15 pmBUSHolding(s) in Company
16th Mar 20163:40 pmBUSHolding(s) in Company
9th Mar 20167:00 amBUSPlacing & Planned Exploration Programme at Mpokoto
22nd Feb 20163:19 pmBUSRepayment of Loan
9th Feb 201611:32 amBUSRobust Project Demonstrated by Mpokoto Feasibility Study - Replacement
8th Feb 20167:00 amBUSRobust Project Demonstrated by Mpokoto Feasibility Study
8th Jan 201612:15 pmBUSHolding(s) in Company
18th Dec 201511:34 amBUSRaises GBP420,000 to advance Mpokoto Gold Project - Replacement
18th Dec 20159:30 amBUSRaises GBP420,000 to advance Mpokoto Gold Project
11th Dec 20157:00 amBUSUpdate on Metallurgical Testwork at Mpokoto Gold Project
25th Nov 20157:00 amBUSMpokoto Gold Project – Update on exploration and expanded resource definition
27th Oct 20157:00 amBUSExercise of Warrants
21st Oct 201512:33 pmBUSResult of General Meeting
6th Oct 201511:20 amBUSNotice of General Meeting
24th Sep 20157:00 amBUSMpokoto Gold Project remains on track towards its goal of production in H1 2016
10th Sep 20155:41 pmBUSHolding(s) in Company
10th Sep 20155:38 pmBUSHolding(s) in Company
10th Sep 20157:00 amBUSInterim Results
14th Aug 20157:00 amBUS£700,000 Raised via Placing to support production at Mpokoto Gold Project H1 2016
3rd Aug 20157:00 amBUSDeveloped Process Route for Gold Recovery following Metallurgical Testwork
30th Jul 20159:16 amBUSAppointment of Joint Broker
24th Jul 20154:36 pmBUSHolding(s) in Company
24th Jul 20154:32 pmBUSHolding(s) in Company
14th Jul 20157:00 amBUSPlacing to Raise £400,000 to Expand Current 678,000oz Mpokoto Gold Resource
29th Jun 20159:00 amBUSProposed acquisition by investee company, MRI
26th Jun 201512:00 pmBUSExercise of Warrants
24th Jun 20157:00 amBUSDrilling at the Mpokoto Gold Project
22nd Jun 20153:00 pmBUSResult of Annual General Meeting
22nd Jun 20157:00 amBUSAGM Statement
10th Jun 20152:15 pmBUSExercise of Warrants
8th Jun 20157:01 amBUSAgreement to fund and develop the Mpokoto Gold Project
8th Jun 20157:00 amBUSRepayment and termination of Bergen Facility
28th May 201512:30 pmBUSPosting of Report & Accounts and Notice of AGM, and Proposed share consolidation and subdivision of share capital
27th May 20155:00 pmBUSHolding(s) in Company
22nd May 20157:00 amBUSFinal Results
19th May 20157:00 amBUSBoard Appointment
6th May 201510:15 amBUSIssue of Ordinary Shares following Exercise of Conversion Rights
5th May 20159:40 amBUSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.