Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

  • There is currently no data for ACP

Completion of Test Work Program

22 Apr 2021 10:00

RNS Number : 3056W
Armadale Capital PLC
22 April 2021
 

 

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

 

22 April 2021

 

Armadale Capital Plc

('Armadale' or 'the Company')

 

Completion of Test Work Program

 

Armadale Capital plc the AIM quoted investment group focused on natural resource projects in Africa, is pleased to report that the metallurgical bulk test work programme has been significantly progressed with Phase One completed successfully. The programme has been carried out in China by Xinhai Mineral EPC ("Xinhai"), the Chinese Engineering, Procurement, Construction and Manufacturing company..

HIGHLIGHTS

· Positive testwork is a major de-risking step in confirming process flowsheet as per definitive feasibility study ("Definitive Feasibility Study") design;

· programme completed by highly regarded Chinese EPC, Xinhai, using a bulk composite of representative feed sample material;

· consistent graphite concentrate grades above 95% TGC were achieved with recoveries above 92%;

· Mahenge project design for treatment of graphite ore confirmed as being able to produce high quality, high purity graphite concentrate;

· Phase One of FEED Studies complete, Phase Two to begin shortly;

· local content plan for the Mahenge Project has been approved by the Ministry of Minerals and Mining Commission of Tanzania. 

Xinhai are a highly experienced, industry-leading Chinese Engineering, Procurement, Construction and Manufacturing (EPC) group in the field of optimising mineral processing solutions, mine design and build and equipment manufacturing.

The test work to date has confirmed the efficacy of the process flow sheet as per the Company's Definitive Feasibility Study for the treatment of graphite ore to produce high quality, high purity graphite concentrate. This completes the first phase of the Front-End Engineering Design Studies ("FEED Studies") being undertaken by Xinhai.

Phase Two of the work involves the completion of remaining necessary engineering to develop an EPC fixed price contract.

Armadale Chairman Nick Johansen Commented:

"Armadale continue to work to our plan with simultaneous workstreams running to de-risk our highly compelling Mahenge graphite project and move towards production. Investors should appreciate that having our chosen processing methods replicated, tested and then successfully validated by an industry leading builder of mines, and more specifically graphite processing plant, is a big stamp of approval for the Mahenge project. Conceptual design has now been delivered as fact - that the Mahenge plant and flow sheet design as determined by the Definitive Feasibility Study can produce a high quality, high purity graphite concentrate. This helps to ratify the exceptional economics of the project and ticks a big box in terms of being able to supply the forthcoming exponential demand expected for high-grade graphite concentrate from the manufacturing of battery anodes for electric vehicles.

We look forward to moving through Phase Two of the FEED studies with Xinhai who have been doing an excellent job thus far. Again, the results of these studies are a major technical de-risking item, and we will be delighted to be working these results into our current offtake and financing discussions which are progressing positively.

Separately, looking to Tanzania, we are also delighted to be able to announce the approval of the local content plan which forms part of our commitment to develop employment and local businesses within the local communities in which we work. we are greatly encouraged by the support which the Tanzanian government has for this project and look forward to being able to update shareholders on further in-country progress as it happens. We are very pleased with the progress made to date and are confident of maintaining this momentum to continue to deliver further shareholder value".

Details of Xinhai Flow Sheet Testwork

· Confirmatory testwork program completed by Xinhai ;

· sample comprised bulk composite of representative feed sample material;

 

· program included head assay, mineralogy and X-ray analysis of the sample and flotation;

 

· beneficiation flotation testing included rougher and cleaner flotation and examined the impact of feed grind size, reagent addition rates, regrind stages and cleaner stages;

 

· the optimised flowsheet test work included open cycle and closed cycle testing;

 

· consistent graphite concentrate grades above 95% TGC were achieved with recovery above 92%;

 

· overall flow sheet to comprise typical graphite multi-stage flotation with regrind and cleaning.

 

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

 

**ENDS**

Enquiries:

Armadale Capital Plc

Nick Johansen, Non-Executive Director

Tim Jones, Company Secretary

 

+44 (0) 20 7236 1177

Nomad and broker: finnCap Ltd

Christopher Raggett / Teddy Whiley

 

+44 (0) 20 7220 0500

 

Notes

Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant Indicated and inferred mineral resource estimate of 59.48Mt @ 9.8% TGC, making it one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu's potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Other assets Armadale has an interest in, include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments.

More information can be found on the website www.armadalecapitalplc.com.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCUUVWRAUUSURR
Date   Source Headline
21st Feb 20207:00 amBUSProject Update
17th Jan 20207:00 amRNSExercise of Warrants and Issue of Equity
7th Jan 202011:01 amBUSAppointment of Non-executive Director
27th Dec 20191:00 pmBUSREPLACEMENT: Exercise of Warrants and Issue of Equity
23rd Dec 20191:45 pmBUSExercise of Warrants
18th Dec 201912:00 pmBUSCorporate Update
6th Dec 20197:00 amRNSAppointment of Non-executive Director
26th Nov 20198:25 amBUSDirectorate change
11th Nov 20199:25 amBUSMine Design & Project Engineer Site Visit Update
1st Nov 201910:36 amRNSFurther Information on Strategic Financing
30th Oct 201910:15 amBUSFurther Strategic Financing
25th Oct 20199:40 amBUSFurther Offtake Agreement MOU
18th Oct 20197:00 amRNSShareholder Webinar
15th Oct 20199:40 amBUSResource Upgrade Confirms High Grade Near Surface Mineralisation
3rd Oct 20197:00 amRNSNew Corporate Presentation
26th Sep 20197:00 amBUSFurther Offtake Agreement MOU
25th Sep 20192:20 pmRNSInvestor Presentation Evening
16th Sep 20191:41 pmBUSStrategic Financing
16th Sep 201911:14 amBUSInterim Results
11th Sep 20197:00 amBUSMineral Resource Update Nearing Completion
5th Sep 20192:00 pmRNSPrice Monitoring Extension
4th Sep 201911:30 amBUSDownstream Test-Work Commenced
28th Aug 20197:04 amBUSHigh-Grade Assay Results Demonstrate Commercial Potential of Large Graphite Project
22nd Aug 20197:45 amBUSMetallurgical Test-work Completes with Highly Encouraging Results
8th Aug 20197:00 amBUSExceptionally High Purity – Metallurgical Test-work
16th Jul 20197:00 amBUSPositive Metallurgical Test-Work Results
27th Jun 201912:15 pmBUSResult of AGM
27th Jun 20197:00 amBUSAGM Statement
25th Jun 20197:00 amBUSExceptionally High-Grade Assay Results
3rd Jun 20193:00 pmBUSDirector Share Purchase
29th May 201910:15 amBUSFast-tracking Commercialisation Plans
28th May 20197:00 amBUSFinal Results and Notice of AGM
20th May 201910:45 amBUSNew Corporate Presentation
15th May 20197:00 amBUSMahenge Liandu Project DFS Update
26th Apr 20197:00 amBUSMahenge Liandu Graphite Project DFS Update
16th Apr 20197:45 amBUSMahenge Liandu Graphite Project Update
20th Mar 201910:53 amRNSHolding(s) in Company
11th Mar 20197:00 amBUSAppointment of Non-executive Director
27th Feb 201910:15 amBUSStrategic Financing & Corporate Update
19th Feb 20197:00 amBUSMOU Signed for Mahenge Liandu Graphite Project
11th Jan 20197:00 amBUSFormal Agreement Reached for the Sale of the non-core Mpokoto Gold Project
24th Oct 20189:08 amBUSProposed Sale of the non-core Mpokoto Gold Project
21st Sep 20187:00 amBUSAppointment of Marketing Consultant
20th Sep 20187:00 amBUSInterim Results
21st Jun 20183:33 pmBUSResult of AGM
6th Jun 20187:00 amBUSReserve Definition Drilling Commences at Mahenge Liandu Graphite Project
23rd May 20187:00 amBUSFinal Results
21st May 20184:00 pmBUSChange of registered address
3rd May 20187:00 amBUSCommencement of Feasibility Study at Mahenge Liandu
9th Apr 201811:00 amBUSPlacing to Raise £963,500

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.