We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.725
Bid: 0.70
Ask: 0.75
Change: 0.00 (0.00%)
Spread: 0.05 (7.143%)
Open: 0.725
High: 0.725
Low: 0.725
Prev. Close: 0.725
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Completion of Test Work Program

22 Apr 2021 10:00

RNS Number : 3056W
Armadale Capital PLC
22 April 2021
 

 

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

 

22 April 2021

 

Armadale Capital Plc

('Armadale' or 'the Company')

 

Completion of Test Work Program

 

Armadale Capital plc the AIM quoted investment group focused on natural resource projects in Africa, is pleased to report that the metallurgical bulk test work programme has been significantly progressed with Phase One completed successfully. The programme has been carried out in China by Xinhai Mineral EPC ("Xinhai"), the Chinese Engineering, Procurement, Construction and Manufacturing company..

HIGHLIGHTS

· Positive testwork is a major de-risking step in confirming process flowsheet as per definitive feasibility study ("Definitive Feasibility Study") design;

· programme completed by highly regarded Chinese EPC, Xinhai, using a bulk composite of representative feed sample material;

· consistent graphite concentrate grades above 95% TGC were achieved with recoveries above 92%;

· Mahenge project design for treatment of graphite ore confirmed as being able to produce high quality, high purity graphite concentrate;

· Phase One of FEED Studies complete, Phase Two to begin shortly;

· local content plan for the Mahenge Project has been approved by the Ministry of Minerals and Mining Commission of Tanzania. 

Xinhai are a highly experienced, industry-leading Chinese Engineering, Procurement, Construction and Manufacturing (EPC) group in the field of optimising mineral processing solutions, mine design and build and equipment manufacturing.

The test work to date has confirmed the efficacy of the process flow sheet as per the Company's Definitive Feasibility Study for the treatment of graphite ore to produce high quality, high purity graphite concentrate. This completes the first phase of the Front-End Engineering Design Studies ("FEED Studies") being undertaken by Xinhai.

Phase Two of the work involves the completion of remaining necessary engineering to develop an EPC fixed price contract.

Armadale Chairman Nick Johansen Commented:

"Armadale continue to work to our plan with simultaneous workstreams running to de-risk our highly compelling Mahenge graphite project and move towards production. Investors should appreciate that having our chosen processing methods replicated, tested and then successfully validated by an industry leading builder of mines, and more specifically graphite processing plant, is a big stamp of approval for the Mahenge project. Conceptual design has now been delivered as fact - that the Mahenge plant and flow sheet design as determined by the Definitive Feasibility Study can produce a high quality, high purity graphite concentrate. This helps to ratify the exceptional economics of the project and ticks a big box in terms of being able to supply the forthcoming exponential demand expected for high-grade graphite concentrate from the manufacturing of battery anodes for electric vehicles.

We look forward to moving through Phase Two of the FEED studies with Xinhai who have been doing an excellent job thus far. Again, the results of these studies are a major technical de-risking item, and we will be delighted to be working these results into our current offtake and financing discussions which are progressing positively.

Separately, looking to Tanzania, we are also delighted to be able to announce the approval of the local content plan which forms part of our commitment to develop employment and local businesses within the local communities in which we work. we are greatly encouraged by the support which the Tanzanian government has for this project and look forward to being able to update shareholders on further in-country progress as it happens. We are very pleased with the progress made to date and are confident of maintaining this momentum to continue to deliver further shareholder value".

Details of Xinhai Flow Sheet Testwork

· Confirmatory testwork program completed by Xinhai ;

· sample comprised bulk composite of representative feed sample material;

 

· program included head assay, mineralogy and X-ray analysis of the sample and flotation;

 

· beneficiation flotation testing included rougher and cleaner flotation and examined the impact of feed grind size, reagent addition rates, regrind stages and cleaner stages;

 

· the optimised flowsheet test work included open cycle and closed cycle testing;

 

· consistent graphite concentrate grades above 95% TGC were achieved with recovery above 92%;

 

· overall flow sheet to comprise typical graphite multi-stage flotation with regrind and cleaning.

 

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

 

**ENDS**

Enquiries:

Armadale Capital Plc

Nick Johansen, Non-Executive Director

Tim Jones, Company Secretary

 

+44 (0) 20 7236 1177

Nomad and broker: finnCap Ltd

Christopher Raggett / Teddy Whiley

 

+44 (0) 20 7220 0500

 

Notes

Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant Indicated and inferred mineral resource estimate of 59.48Mt @ 9.8% TGC, making it one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu's potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Other assets Armadale has an interest in, include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments.

More information can be found on the website www.armadalecapitalplc.com.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCUUVWRAUUSURR
Date   Source Headline
13th Jul 201712:01 pmBUSConvertible Note Update
4th Jul 20172:31 pmBUSTanzanian Legislation
26th Jun 20174:35 pmBUSResult of AGM
26th Jun 20177:00 amBUSAGM Statement
21st Jun 20177:00 amBUSExploration Update: Trenching Intercepts Wide Zones of High Grade Graphite
5th Jun 20177:00 amBUSUpdate on 2017 Exploration Programme at Mahenge Liandu Graphite Project
2nd Jun 20177:00 amBUSFinal Results
3rd May 20177:00 amBUSGraphite Concentrate Upgraded to Purity of up to 99.99% Graphitic Carbon
21st Apr 20179:31 amBUSExcellent Test Results for Mahenge Liandu Graphite Concentrate
29th Mar 20177:00 amBUS2017 Mahenge Liandu Exploration Programme Commenced: Targeting Resource Increase and Upgrade
28th Feb 201712:47 pmBUSDirectorate change
2nd Feb 201711:45 amBUSInitial Metallurgical Test-work Results
23rd Jan 20172:16 pmBUSDirector/PDMR Dealing
20th Jan 20174:12 pmBUSNew Corporate Website - Replacement
20th Jan 20173:40 pmBUSNew Corporate Website
18th Jan 20177:00 amBUSPlacing to Raise £650,000
5th Jan 20177:00 amBUSNumber of Shares in Issue
8th Dec 20167:00 amBUSMaiden JORC Compliant Mineral Resource Estimate of 40.9Mt @ 9.41% Total Graphitic Content
5th Dec 20167:00 amBUSJoint Venture Agreement Proceeding on Mpokoto Gold Project
11th Nov 201610:00 amBUSHolding(s) in Company
8th Nov 20167:00 amBUSInitial Assay Results Confirm High-Grade Graphite Mineralisation up to 26% TGC
2nd Nov 20169:45 amBUSHolding(s) in Company
26th Oct 20167:00 amBUS85% Strike Rate of High Grade Graphite Mineralisation from Drilling at Mahenge Liandu, Tanzania
18th Oct 20167:00 amBUSPositive Drill Results from Mahenge Liandu Graphite Project
18th Oct 20167:00 amBUSDirectorate change
11th Oct 20167:00 amBUSIssue of Equity
7th Oct 20167:00 amBUSDiscovery of High-Grade Coarse Flake Graphite Mineralisation Mahenge Liandu Project
28th Sep 20167:39 amBUSBinding HOA to Form Joint Venture to Develop Mpokoto and Directorate Change
23rd Sep 20167:00 amBUSDrilling Commences at the Mahenge Liandu Graphite Project, Tanzania
22nd Sep 20167:00 amBUSInterim Results
16th Aug 20167:00 amBUSGeological Mapping Identifies Extensive Outcropping Mineralisation at Mahenge Liandu Graphite Project, Tanzania
10th Aug 20167:00 amBUSDirectorate Change
28th Jul 20168:00 amBUSDirector/PDMR Shareholding
25th Jul 20167:00 amBUSEM Survey Defines Multiple Drill Targets at Mahenge Liandu Graphite Project, Tanzania
21st Jul 20167:00 amBUSDirectorate change
13th Jul 20169:35 amBUSHolding(s) in Company
11th Jul 20167:00 amBUSCompletes Acquisition of High Grade Graphite Project in Tanzania
24th Jun 201611:35 amBUSResult of AGM
23rd Jun 201612:00 pmBUSRaises £825,000 to Advance High Grade Liandu Graphite Project, Tanzania
20th Jun 201611:30 amBUSHigh Grade Graphite Mineralisation Confirmed at Liandu Project
2nd Jun 20167:00 amBUSProposed acquisition of a High Grade Coarse Flake Graphite Project in Tanzania
20th May 20167:00 amBUSFinal Results and Notice of AGM
3rd May 20167:00 amBUSArmadale Capital Plc (‘Armadale’ or ‘the Company’) Update on Exploration Programme at Mpokoto
7th Apr 201611:00 amBUSHolding(s) in Company
21st Mar 20164:15 pmBUSHolding(s) in Company
16th Mar 20163:40 pmBUSHolding(s) in Company
9th Mar 20167:00 amBUSPlacing & Planned Exploration Programme at Mpokoto
22nd Feb 20163:19 pmBUSRepayment of Loan
9th Feb 201611:32 amBUSRobust Project Demonstrated by Mpokoto Feasibility Study - Replacement
8th Feb 20167:00 amBUSRobust Project Demonstrated by Mpokoto Feasibility Study

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.