Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 60.00
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 3.00 (5.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 60.00
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

11 Oct 2006 07:00

Anglo Asian Mining PLC11 October 2006 11 October 2006 ANGLO ASIAN MINING PLC ('Anglo Asian' or 'the Company') OPERATIONAL UPDATE Anglo Asian Mining PLC (AIM: AAZ), the gold and copper development company withprojects in Azerbaijan, today issues the following operational update: Gedabek The Company is moving towards feasibility at its Gedabek gold, copper and silverproject in north-west Azerbaijan and a resource estimate is being prepared,following an in-fill drilling programme on 40m x 40m spacing. It is expectedthat this resource estimate will be announced in November 2006 and follows thetwo releases by the Company detailing encouraging results from drilling atGedabek made on 2 June 2006 and 24 August 2006. Early indications show that a high proportion of the resource is amenable toheap leaching and further metallurgical leaching tests are underway at SGSLakefield laboratories in Canada and at Gekko Systems in Australia. Under aheap leaching scenario the Directors estimate that an initial annual productionrate of 50,000 to 70,000 oz of gold with silver and copper credits can beachieved. Heap leaching is a less capital intensive option than the CIL/flotation alternatives, resulting in both a lower capital cost and shorterconstruction period. It is therefore expected that under this option theconstruction could be completed before the end of 2007 allowing production tocommence shortly thereafter. The Company is in the process of commissioning a geophysical survey on the sitein order to establish potential extensions to the ore body. Funding In light of the positive drilling results and the encouraging metallurgical testwork at Gedabek, the Company has decided to direct all financial and humanresources towards this project with minimal focus on other contract areas. TheCompany is working towards early production at Gedabek as its first priority. The Company has put in place a cost reduction programme throughout theorganisation with the aim of ensuring that the current cash resource issufficient to provide funding for the Company through to the end of 2007. It isanticipated that additional funding will be required to cover the capital andworking capital costs for the Gedabek project. Should the heap leach optioncontinue to be the process of choice, the sale of the CIL plant now located inSingapore will provide a significant proportion of the required funding and willalso allow construction to start in early 2007, pending the necessary governmentapprovals. A decision on the plant will be taken when the results of the resource estimateand current metallurgical test-work are completed in November 2006. Gosha Exploration work continues in the adits at the Gosha property, some 50km fromGedabek. The results of the adit sampling carried out to date are consistentwith the Soviet data incorporated in the Company's AIM Admission Document dated26 July 2005 (the 'Admission Document'), which identified an inferred resourceof 424,000 oz gold. Further limited evaluation and sampling of this prospect isplanned over the coming winter months Ordubad In light of the progress made at Gedabek and the prioritisation of earlyproduction at this project, the exploration work in Ordubad will be put on holdand the camp currently located in Ordubad will be relocated to Gedabek. Previous releases on 17 January 2006 and 24 August 2006 detailed the outcome ofthe work carried out to date, which is summarised as follows: The drilling programme at Piyazbashi was completed in March 2006. The resultsof the drilling and adit sampling provided confirmation of gold grade in theveins broadly in line with the Soviet data. An assessment of the resource isstill to be completed. Adit sampling at Shakardara, as announced in January 2006, was disappointing anda brief drilling campaign did not provide any further encouragement. Inaddition, as reported in the same release, the retesting and resampling of grabsamples from the dump outside adit 12 gave two results around 1 gram per tonne('g/t'), in contrast to the significantly higher grades of two grab samplestaken by Behre Dolbear, which were included in table 3.1 of the AdmissionDocument of 14.88 and 33.6 g/t gold. These discrepancies have been the subjectof discussion between the Company and Behre Dolbear, however, the Directors notethat the results of the said grab samples were excluded from Behre Dolbear'sresource estimates and project valuations stated in the Admission Document. TheDirectors and their advisers therefore believe that the information released todate on Shakardara provides an accurate summary of the situation. Further methodical exploration work is planned in due course for the othercontract areas of Ordubad, namely Misdag, Diakahchy, Agyurt and Shalala and theCompany will also complete its assessment of Shakardara. The remainder of theprogramme in Ordubad will be carried out when it is considered appropriate andthe utilisation of cash and human resources will not affect the chances ofsuccess on the Gedabek project. The Company has a minimum of two and a halfyears under the Production Sharing Agreement to complete the exploration work inthis area. Chief Geologist To strengthen the Company's technical management, Mr Kevin Shugg has beenappointed as Chief Geologist. Mr Shugg, an Australian, has extensive experiencein both exploration and mine geology and has previously worked in Central Asia. -Ends- For further details, please contact: Anglo Asian Mining PLC Gordon Lewis, Chief Executive +44 20 7409 3232 Richard Round, Finance Director +44 20 7409 3232 Numis Securities Limited John Harrison +44 20 7776 1590 Parkgreen Communications Victoria Thomas +44 20 7493 3713 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
9th Sep 20084:35 pmRNSPrice Monitoring Extension
27th Aug 20084:35 pmRNSPrice Monitoring Extension
21st Aug 20088:42 amRNSHolding(s) in Company
20th Aug 20084:35 pmRNSPrice Monitoring Extension
12th Aug 20084:41 pmRNSSecond Price Monitoring Extn
12th Aug 20084:35 pmRNSPrice Monitoring Extension
1st Aug 20082:30 pmRNSAppointment of CFO
1st Aug 20087:00 amRNSIssue of Equity
31st Jul 20083:32 pmRNSHolding(s) in Company
23rd Jul 200812:09 pmRNSResult of AGM
23rd Jul 20087:00 amRNSPre-AGM Statement
16th Jul 200812:49 pmRNSHolding(s) in Company
30th Jun 20087:00 amRNSNotice of Annual Report and A
27th Jun 200810:22 amRNSIssue of Shares
26th Jun 20087:00 amRNSFinal Results
18th Jun 20083:13 pmRNSHolding(s) in Company
16th Apr 200811:45 amRNSIssue of shares
10th Apr 20087:00 amRNSGedabek & Financing Update
27th Mar 20084:40 pmRNSSecond Price Monitoring Extn
27th Mar 20084:35 pmRNSPrice Monitoring Extension
12th Mar 20085:55 pmRNSHolding(s) in Company
23rd Jan 20084:41 pmRNSSecond Price Monitoring Extn
23rd Jan 20084:35 pmRNSPrice Monitoring Extension
13th Nov 20077:01 amRNSIssue of shares
23rd Oct 20077:02 amRNSAcquires Process Plant
23rd Oct 20077:01 amRNSSale of CIL Plant
1st Oct 20074:36 pmRNSPrice Monitoring Extension
28th Sep 20077:04 amRNSInterim Results
24th Sep 20077:02 amRNSAgreement on Credit Facility
19th Sep 20072:26 pmRNSNotice of Results
9th Aug 20077:00 amRNSCOMPLIANCE WITH AIM RULE 26
27th Jul 20077:01 amRNSAward of Options
19th Jul 20077:01 amRNSAppointment of Chairman
18th Jun 20077:01 amRNSGedabek Project Update
1st Jun 20077:01 amRNSDirectorate Change
25th Apr 20074:54 pmRNSResult of AGM
2nd Apr 20079:12 amRNSAnnual Report and Accounts
19th Mar 20077:03 amRNSFinal Results
14th Mar 20073:20 pmRNSNotice of Results
5th Mar 20077:01 amRNSNotice of Discovery
15th Feb 20077:01 amRNSGedabek Scoping Study
1st Feb 20077:01 amRNSChange of Address
27th Dec 20067:01 amRNSDirectorate Change
20th Dec 200610:14 amRNSTotal Voting Rights
11th Dec 20067:01 amRNSPresentation
1st Dec 20067:01 amRNSGedabek Resource Estimate
16th Nov 20067:01 amRNSGedabek Drilling Update
11th Oct 20067:00 amRNSOperational Update
24th Aug 20067:01 amRNSInterim Results
15th Aug 200610:21 amRNSNotice of Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.