Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 61.50
Bid: 60.00
Ask: 63.00
Change: -3.00 (-4.76%)
Spread: 3.00 (5.00%)
Open: 63.00
High: 62.00
Low: 60.00
Prev. Close: 63.00
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Gedabek Project Update

18 Jun 2007 07:01

Anglo Asian Mining PLC18 June 2007 18 June 2007 ANGLO ASIAN MINING PLC ('Anglo Asian' or 'the Company') Gedabek Development Plan Feasibility Study Completed Anglo Asian Mining PLC (AIM:AAZ) the gold and copper development company withprojects in Azerbaijan, announces continued good progress on its Gedabek projectin West Azerbaijan. Feasibility Study The Company has completed a Feasibility Study on Gedabek, which shows thedevelopment of the property to be both economically viable and robust. The studyidentifies a mining reserve of 7.7 million tonnes of ore at grades of 1.80 gramsper tonne ('g/t') gold, 15.91 g/t silver and 0.29% copper. Gold, silver andcopper production over the mine life has been conservatively estimated to be311,154 oz of gold, 1,959,109 oz of silver and 17,424,960 lbs of copperrespectively. Under the JORC code this reserve is in the "probable" mineralreserve category. Additional ore is expected to be found from the inferred orewithin the current pit boundaries, extensions of the mineralisation alreadyidentified outside the pit and from old mine stockpiles produced from previousunderground mining. Capital costs are estimated at US$30.7 million, including US$3.1 million ofworking capital. The gross cash operating costs are estimated as US$283 per ozof gold (US$147 per oz net of copper and silver credits). Together with the lowcosts of operation and after metal credits, at current metal prices, the projectis expected to payback the capital investment within one year of productioncommencing. Analysis of the Gedabek project shows that the Company will receive63% of the pre-tax cashflows under the terms of the Production SharingAgreement. As described in earlier announcements, the application of heap leach technologyfrom a low strip open pit mine, combined with the SART(Sulphidation-Acidification-Recycle-Thickening) copper precipitation processremains the preferred recovery method for the project. CIL Plant and funding The Company is currently marketing the CIL plant which is packed and ready fortransport in Singapore. Negotiations with several interested prospective buyersare in process. It is expected that proceeds from the sale of the CIL plant willfund a substantial amount of the construction work planned for this year atGedabek. Following completion of the feasibility study, the Company is nowexploring various options to meet the capital requirements of the Group. Land and approvals Following the identification of land requirements in May of this year, thegovernment have already assigned sufficient municipality land to the Company tomeet c.78% of the total requirement. The remaining land, which is privatelyheld, is in the final stages of negotiation. Under the rules of the Production Sharing Agreement, the Company submitted aWork Plan and Budget on 28 May 2007 for the current year and a Development andProduction Programme is ready for submission for the Gedabek project. These areexpected to be approved in coming weeks. The Environmental Base-Line Study has been approved by the Ministry of Ecologyand Natural Resources, and the Environmental Impact Study was submitted forapproval on 11 June 2007. Approval is expected before the end of July of thisyear. A Mining Licence application is in preparation for submission to theMinistry of Emergency Situations, which is also responsible for explosives, minesafety and health. Construction of the main access roads into the mine, the leach pad area,earthworks and foundations for the plant and crushing facilities and shellbuildings are all planned for the mild weather conditions between August andDecember of this year. The mine is scheduled to finish the remainingconstruction during the second quarter and commence production in the thirdquarter of 2008. Commenting on the latest developments, Chief Executive Gordon Lewis stated, "Theresults of the study are excellent news for the Company and place it in a strongposition in the Republic of Azerbaijan. Gedabek will be the first significantgold mine in the country for several decades. These results bode well forAzerbaijan and are an indication of the economic potential of the region forgold and copper resources." -Ends- Mr Gordon Lewis has approved the content of this announcement. He is aprofessionally qualified mining engineer with over 30 years of relevantexperience in the mining industry and is a member of the Australasian Instituteof Mining and Metallurgy. -Ends- For further details, please contact: Anglo Asian Mining PLCGordon Lewis, Chief Executive +994 12 499 3350Richard Round, Finance Director +44 1525 211 988 Numis Securities LimitedJohn Harrison +44 20 7776 1590 Parkgreen CommunicationsJustine Howarth / Clare Irvine +44 20 7851 7480 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
31st Oct 20186:30 pmRNSTotal Voting Rights
23rd Oct 20187:00 amRNSPayment of interim dividend - sterling amount
11th Oct 20187:00 amRNSQ3 2018 Production and Operations Review
8th Oct 20187:00 amRNSExercise of Share Options and Issue of Equity
19th Sep 20187:00 amRNSInterim Results and Maiden Dividend
18th Sep 20187:00 amRNSGedabek Open Pit - JORC Resources and Reserves
17th Sep 20187:00 amRNSH1 Geological Exploration Activities and Results
13th Sep 20187:00 amRNSAirborne Geophysical Survey at Gedabek
5th Sep 20189:30 amRNSCorporate Presentation and Net Cash
3rd Sep 201811:30 amRNSTechnical Presentation and Paper
29th Aug 20188:30 amRNSApproval of Capital Reduction by the Court
31st Jul 20187:00 amRNSTotal Voting Rights
30th Jul 201811:30 amRNSResult of General Meeting
19th Jul 20185:09 pmRNSExercise of Share Options and Issue of Equity
17th Jul 20187:00 amRNSQ2 & H1 2018 Production and Operations Review
13th Jul 201810:00 amRNSPosting of Circular and Notice of General Meeting
5th Jul 201811:00 amRNSPDMR Exercise of Share Options and Issue of Equity
29th Jun 20184:15 pmRNSResult of AGM
29th Jun 20187:00 amRNSAGM Statement
7th Jun 20189:30 amRNSNotice of General Meeting
24th May 20187:00 amRNSFinal Results
3rd May 201811:16 amRNSNew Corporate Presentation
16th Apr 20187:25 amRNSQ1 2018 Production and Operations Review
3rd Apr 201812:00 pmRNSRepayment of Director Loan
26th Mar 20189:00 amRNS2017 Exploration Activities & Results
13th Mar 20187:00 amRNSLaunch of 2018 Exploration Programme
12th Feb 20187:00 amRNS$15 million Syndicated 2-year 7% Loan Facility
6th Feb 201812:30 pmRNSUpdated Corporate Presentation
6th Feb 20187:00 amRNSFY2018 Production Guidance of 78,000 - 84,000 GEOs
16th Jan 20184:40 pmRNSSecond Price Monitoring Extn
16th Jan 20184:35 pmRNSPrice Monitoring Extension
16th Jan 20187:00 amRNSQ4 & FY 2017 Production and Operations Review
10th Jan 20184:40 pmRNSSecond Price Monitoring Extn
10th Jan 20184:35 pmRNSPrice Monitoring Extension
10th Jan 20182:05 pmRNSSecond Price Monitoring Extn
10th Jan 20182:00 pmRNSPrice Monitoring Extension
10th Jan 20181:13 pmRNSUpdate re Director Loan
26th Oct 20177:00 amRNSExploration and Development Activity Update
19th Oct 201710:15 amRNSBritish Ambassador to Azerbaijan visits Gedabek
13th Oct 20177:00 amRNSQ3 2017 Production Update
2nd Oct 20177:00 amRNSCompletion of Ugur JORC Resource
21st Sep 20177:00 amRNSInterim Results
13th Sep 20178:00 amRNSCommencement of Production from Ugur Open Pit Mine
11th Sep 20179:47 amRNSPresentation at Conference of Metallurgists
14th Aug 20177:00 amRNSUgur Gold Deposit - JORC Resource and Reserves
31st Jul 20178:30 amRNSTotal Voting Rights
27th Jul 20174:30 pmRNSDirector Dealing
27th Jul 20177:00 amRNSIssue of Equity and Director Shareholding
24th Jul 201710:33 amRNSUgur Gold Deposit Development & Gedabek Update
17th Jul 20177:00 amRNSQ2 and H1 2017 Production and Operations Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.