Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 61.50
Bid: 60.00
Ask: 63.00
Change: -3.00 (-4.76%)
Spread: 3.00 (5.00%)
Open: 63.00
High: 62.00
Low: 60.00
Prev. Close: 63.00
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Gedabek Project Update

18 Jun 2007 07:01

Anglo Asian Mining PLC18 June 2007 18 June 2007 ANGLO ASIAN MINING PLC ('Anglo Asian' or 'the Company') Gedabek Development Plan Feasibility Study Completed Anglo Asian Mining PLC (AIM:AAZ) the gold and copper development company withprojects in Azerbaijan, announces continued good progress on its Gedabek projectin West Azerbaijan. Feasibility Study The Company has completed a Feasibility Study on Gedabek, which shows thedevelopment of the property to be both economically viable and robust. The studyidentifies a mining reserve of 7.7 million tonnes of ore at grades of 1.80 gramsper tonne ('g/t') gold, 15.91 g/t silver and 0.29% copper. Gold, silver andcopper production over the mine life has been conservatively estimated to be311,154 oz of gold, 1,959,109 oz of silver and 17,424,960 lbs of copperrespectively. Under the JORC code this reserve is in the "probable" mineralreserve category. Additional ore is expected to be found from the inferred orewithin the current pit boundaries, extensions of the mineralisation alreadyidentified outside the pit and from old mine stockpiles produced from previousunderground mining. Capital costs are estimated at US$30.7 million, including US$3.1 million ofworking capital. The gross cash operating costs are estimated as US$283 per ozof gold (US$147 per oz net of copper and silver credits). Together with the lowcosts of operation and after metal credits, at current metal prices, the projectis expected to payback the capital investment within one year of productioncommencing. Analysis of the Gedabek project shows that the Company will receive63% of the pre-tax cashflows under the terms of the Production SharingAgreement. As described in earlier announcements, the application of heap leach technologyfrom a low strip open pit mine, combined with the SART(Sulphidation-Acidification-Recycle-Thickening) copper precipitation processremains the preferred recovery method for the project. CIL Plant and funding The Company is currently marketing the CIL plant which is packed and ready fortransport in Singapore. Negotiations with several interested prospective buyersare in process. It is expected that proceeds from the sale of the CIL plant willfund a substantial amount of the construction work planned for this year atGedabek. Following completion of the feasibility study, the Company is nowexploring various options to meet the capital requirements of the Group. Land and approvals Following the identification of land requirements in May of this year, thegovernment have already assigned sufficient municipality land to the Company tomeet c.78% of the total requirement. The remaining land, which is privatelyheld, is in the final stages of negotiation. Under the rules of the Production Sharing Agreement, the Company submitted aWork Plan and Budget on 28 May 2007 for the current year and a Development andProduction Programme is ready for submission for the Gedabek project. These areexpected to be approved in coming weeks. The Environmental Base-Line Study has been approved by the Ministry of Ecologyand Natural Resources, and the Environmental Impact Study was submitted forapproval on 11 June 2007. Approval is expected before the end of July of thisyear. A Mining Licence application is in preparation for submission to theMinistry of Emergency Situations, which is also responsible for explosives, minesafety and health. Construction of the main access roads into the mine, the leach pad area,earthworks and foundations for the plant and crushing facilities and shellbuildings are all planned for the mild weather conditions between August andDecember of this year. The mine is scheduled to finish the remainingconstruction during the second quarter and commence production in the thirdquarter of 2008. Commenting on the latest developments, Chief Executive Gordon Lewis stated, "Theresults of the study are excellent news for the Company and place it in a strongposition in the Republic of Azerbaijan. Gedabek will be the first significantgold mine in the country for several decades. These results bode well forAzerbaijan and are an indication of the economic potential of the region forgold and copper resources." -Ends- Mr Gordon Lewis has approved the content of this announcement. He is aprofessionally qualified mining engineer with over 30 years of relevantexperience in the mining industry and is a member of the Australasian Instituteof Mining and Metallurgy. -Ends- For further details, please contact: Anglo Asian Mining PLCGordon Lewis, Chief Executive +994 12 499 3350Richard Round, Finance Director +44 1525 211 988 Numis Securities LimitedJohn Harrison +44 20 7776 1590 Parkgreen CommunicationsJustine Howarth / Clare Irvine +44 20 7851 7480 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
3rd Jul 20177:00 amRNSResult of AGM
30th Jun 20177:00 amRNSAGM Statement
2nd Jun 20179:30 amRNSPosting of Annual Report & Notice of AGM
25th May 20177:00 amRNSFull year results - 2016
9th May 201710:00 amRNSNew Corporate Presentation
8th May 20177:00 amRNSUgur Gold Deposit Development & Strategy Update
18th Apr 20177:00 amRNSStrategy Update and Q1 2017 Review
16th Feb 201712:32 pmRNSPartial transfer of loan from Amsterdam Trade Bank
17th Jan 20179:00 amRNSDirectors' Dealing
17th Jan 20177:00 amRNSQ4 & FY 2016 Operations and Production Update
22nd Dec 201610:00 amRNSUpdate re Director Loan
16th Dec 20167:00 amRNSSignificant Oxide Zone Drilled at Ugur Deposit
30th Nov 20167:00 amRNSGedabek Connected to Power Grid & Operation Update
14th Nov 201612:13 pmRNSGrant of Options
3rd Nov 20169:00 amRNSUpdated Presentation and AISC for Gedabek Mine
2nd Nov 20164:40 pmRNSSecond Price Monitoring Extn
2nd Nov 20164:35 pmRNSPrice Monitoring Extension
17th Oct 20167:00 amRNSNew Gold Discovery at its Gedabek Licence Area
13th Oct 20167:00 amRNSQ3 2016 Operations & Production Update
12th Sep 20167:00 amRNSInterim Results
14th Jul 20169:05 amRNSSecond Price Monitoring Extn
14th Jul 20169:00 amRNSPrice Monitoring Extension
14th Jul 20167:00 amRNSQ2 & H1 2016, Production Update, Operations Review
29th Jun 20167:30 amRNSHedging of gold sales for remainder of 2016
28th Jun 20167:00 amRNSResult of AGM
27th Jun 20167:00 amRNSAGM Statement
6th Jun 201610:00 amRNSPosting of Report & Accounts and Notice of AGM
25th May 20167:00 amRNSFinal Results
13th Apr 20167:00 amRNSQ1 2016 operations and production update, Gedabek
11th Feb 20164:41 pmRNSSecond Price Monitoring Extn
11th Feb 20164:35 pmRNSPrice Monitoring Extension
8th Feb 20164:41 pmRNSSecond Price Monitoring Extn
8th Feb 20164:35 pmRNSPrice Monitoring Extension
28th Jan 20167:00 amRNSNotification of Adoption of FRS 101
14th Jan 20167:00 amRNSQ4 2015/ FY 2015 Production Update Gedabek
11th Jan 20164:12 pmRNSDirector loan and Company net debt
21st Dec 20153:03 pmRNSFloating exchange rate regime
24th Nov 20157:00 amRNSCopper Concentrate Shipment from Floatation Plant
23rd Oct 20153:30 pmRNSDirector's Shareholding
14th Oct 20157:00 amRNSQ3 2015 Production Update
6th Oct 20159:53 amRNSHolding(s) in Company
22nd Sep 20157:00 amRNSInterim Results
31st Jul 20157:00 amRNSTotal Voting Rights
22nd Jul 20153:50 pmRNSIssue of Shares / Directors Dealing
13th Jul 20157:00 amRNSQ2 & H1 2015 operations update from Gedabek Mine
8th Jul 20154:40 pmRNSSecond Price Monitoring Extn
8th Jul 20154:35 pmRNSPrice Monitoring Extension
8th Jul 201512:42 pmRNSHolding(s) in Company
29th Jun 20153:00 pmRNSResult of AGM
29th Jun 201511:00 amRNSAGM Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.