focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAriana Regulatory News (AAU)

Share Price Information for Ariana (AAU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.00
Bid: 2.90
Ask: 3.10
Change: -0.06 (-1.96%)
Spread: 0.20 (6.897%)
Open: 2.90
High: 3.05
Low: 2.90
Prev. Close: 3.06
AAU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

POSITIVE RESOURCE DRILLING AT TAVSAN

16 Jun 2022 07:00

RNS Number : 1110P
Ariana Resources PLC
16 June 2022
 

 

 

16 June 2022

AIM: AAU

POSITIVE RESOURCE DRILLING AT TAVSAN

Ariana Resources plc ("Ariana" or the "Company"), an AIM-listed mineral exploration and development company with gold mining interests in Europe, is pleased to announce recent resource and exploration drilling results obtained from the Tavsan Project. The project is operated by Zenit Madencilik San. ve Tic. A.S. ("Zenit") in partnership with Proccea Construction Co. and Ozaltin Holding A.S. and is 23.5% owned by Ariana.

Highlights:

· Infill resource drilling results from Tavsan include:

17.8m @ 2.93g/t Au + 5.1g/t Ag

incl. 3.2m @ 6.84g/t Au + 8.3g/t Ag

12.0m @ 1.70g/t Au + 2.9g/t Ag

incl. 5.3m @ 2.0g/t Au + 2.6g/t Ag 

12.9m @ 1.57g/t Au + 1.9g/t Ag

· 96 new holes drilled within the Mineral Resource area, providing data for a revised Mineral Resource Estimate. 

· Work on the Mineral Resource Estimate is well underway, with a Feasibility Study to be updated on completion of the new Resource Estimate.

· 12 geotechnical drill-holes were also completed at the proposed Tavsan processing plant site.

Dr. Kerim Sener, Managing Director, commented:

"These drilling results have continued to reinforce our understanding of the Tavsan gold-silver deposit and have largely extended the footprint of known mineralisation, particularly across the North Zone. In fact, some of the highest grades and widest intercepts of mineralisation in the whole project are now located in this zone. Accordingly, we are expecting a significant improvement in the Mineral Resource Estimate in this area in particular.

"Permitting for Tavsan is now nearing conclusion and the construction stage of the project is due to commence in July, once financing arrangements are completed. We will be revising our Feasibility Study for Tavsan on completion of the new Resource Estimate and once finance terms are agreed. This is an exciting time in the development of our second mine in Turkey and further updates to the market will be provided in due course."

Drilling Programme

Between November 2021 and March 2022, a 4,354.8m geotechnical and resource infill drilling programme was completed at Tavsan. Ninety-six drill holes for a total of 3,871.7 metres of HQ diamond drilling was completed specifically for resource infill, covering all four major mineralised zones at Tavsan. At the peak of the programme, three drill rigs were operating simultaneously. The average depth for all drilling was approximately 39 metres, with a minimum depth of 3.8 meters and a maximum depth of 114.30 metres. All holes, except for one hole angled at 45o, were drilled vertically.

The primary objective of the 2021/2022 drilling programme at Tavsan was to provide infill drilling data between historic drill collars to support a reclassification of the Tavsan resources, primarily into the Measured and Indicated categories. To date, all assay results for gold and silver have returned from both the Zenit and ALS laboratories. The majority of the multi-element AAS results have also been returned, with only a few batches of samples remaining.

The results received include 55 holes which intercepted gold mineralisation exceeding 1g/t Au over a sample length of 1 meter, to a maximum intercept of 17.8 meters, these include:

· TAV-D66-21: 17.8m @ 2.93g/t Au + 5.1g/t Ag,

incl. 3.2m @ 6.84g/t Au + 8.3g/t Ag

· TAV-D69-22: 12.0m @ 1.70g/t Au + 2.9g/t Ag

Incl. 5.3m @ 2.0g/t Au + 2.6g/t Ag

· TAV-D90-22: 12.9m @ 1.57g/t Au + 1.9g/t Ag

North Zone

Thirty-seven new drill holes have been drilled within the Tavsan North Zone. These holes have intercepted some of the widest intervals and highest grades of the 2021/2022 programme including holes TAV-D66-21, TAV-D69-22, TAV-D79-22 and TAV-D90-22. Average drill hole spacing within the North Zones is now approximately 48 metres. Step-out drilling from the existing resource holes has expanded the known mineralisation footprint by up to 120 metres.

Main Zone

The Main Zone contains the bulk of the Tavsan Mineral Resource Estimate. Thirty-eight new drill holes were drilled within the Tavsan Main Zone. This drilling shows that the most consistent grades occur within the 0.3km2 Main Zone resource area, with average intercept values ranging from 1g/t Au to 4g/t Au respectively. The average collar spacing within the Main Zone is now 38 meters. Surface grades defined from the 2019/2020 rock saw channel sampling have identified some of the most significant grades peaking at 18.8g/t Au over a 1.4 metre interval (TAV-CH087-19).

West Zone

Twenty-one new holes were drilled at the Tavsan West Zone. Drilling here has confirmed mineralisation where historic drilling was probably terminated too early. However, overall, the mineralisation at Tavsan West Zone is generally lower grade with average intercept values ranging from 0.5g/t Au to 2g/t Au. Average drill collar spacing at Tavsan West Zone is now 48 metres.

Mineral Resource Estimate

In January 2020, an extensive rock-saw channel sampling programme, sampling over 60 outcrop locations within the immediate Tavsan resource area was completed (see RNS 22 January 2020). This contributed to a revised resource estimate corresponding to a 50% increase in the Tavsan Mineral Resource to 4.49Mt at 1.76g/t Au and 5.0g/t Ag for 253,000 oz Au and 723,000 oz Ag, across all classification categories (see RNS 11 June 2020). The next phase of estimation work will involve the integration of the latest drilling data which is expected to add further confidence to the Mineral Resource Estimate. Updates to the Tavsan Mineral Resource are now well underway, and will be reviewed by both the Ariana and Zenit Mineral Resource Estimation teams in the coming weeks.

In parallel with the new assays, extensive drill core density data has been collected to support the Tavsan development programme and revisions to the Mineral Resource Estimate. During the 2021/2022 programme, a total of 896 density measurements have been acquired. From this data, the Tavsan mineralisation has been determined to range from 2.57g/cm3 to 2.64g/cm3, depending on the intensity of brecciation and/or silicification.

Twelve geotechnical diamond drill-holes totalling 374.6m were completed to the North West of the Tavsan North Zone. These holes were designed to supplement the Tavsan Feasibility Study by providing detailed geotechnical data for the foundations of the proposed Tavsan processing plant.http://www.rns-pdf.londonstockexchange.com/rns/1110P_1-2022-6-16.pdf

Figure 1: Plan view of the Tavsan area, showing all recent drill collar positions, rock-saw channel samples, mapped jasperoid outcrops, and the surface projection of the 2020 Tavsan MRE domains.

Table 1: Significant intercepts calculated for all 2021/2022 drilling at Tavsan, using a 1g/t Au minimum cut-off and allowing for up to 1m internal dilution.

Hole ID

From (m)

To (m)

Interval (m)

Gold g/t

Silver g/t

TAV-D02B-21

14

15.9

1.9

1.48

1.7

TAV-D03-21

13.6

15.9

2.3

1.78

4.0

TAV-D10-21

1.1

2.1

1

1.10

2.0

TAV-D12-21

15

16

1

1.03

3.0

TAV-D13-21

12

13

1

1.10

0.3

TAV-D14-21

28.4

29.5

1.1

1.04

4.0

TAV-D17-21

20.2

23.4

3.2

1.28

0.7

TAV-D22-21

1

3

2

1.12

15.0

TAV-D22A-21

1

2

1

1.04

9.0

TAV-D25-21

0

4.1

4.1

1.49

5.4

TAV-D27-21

2

3

1

3.26

38.0

6

8

2

1.04

8.5

TAV-D28-21

14

17.3

3.3

1.52

0.5

TAV-D29-21

3.6

6.6

3

2.87

0.3

TAV-D30-21

8.9

12.9

4

3.96

1.7

including

9.9

11.9

2

7.22

3.1

TAV-D31-21

4

5

1

3.33

433.0

8.2

12.2

4

1.80

0.9

15.2

18.6

3.4

2.09

3.3

TAV-D32-21

13.5

21.7

8.2

1.54

1.8

TAV-D34-21

11.3

12.3

1

2.28

0.3

TAV-D35-21

10.6

13.6

3

1.42

0.3

TAV-D37-21

0

1.3

1.3

1.63

0.3

TAV-D41-21

9.7

15.5

5.8

2.49

0.3

17.5

20.5

3

2.62

1.5

TAV-D44-21

8.3

9.3

1

1.59

0.3

TAV-D47-21

8.7

9.8

1.1

1.48

11.0

TAV-D50-21

23.4

26.7

3.3

2.41

12.5

TAV-D53-21

30.7

37.4

6.7

2.24

8.3

including

34.8

36.8

2

4.79

6.5

TAV-D54-21

27.6

29.4

1.8

1.30

3.8

TAV-D55-21

16.2

22

5.8

1.47

1.7

TAV-D61-21

21.9

29

7.1

1.84

4.8

TAV-D62-21

25

26

1

3.43

17.0

TAV-D64-21

1

2.2

1.2

1.06

8.0

TAV-D65-21

0

1

1

1.10

7.0

3

4

1

1.28

5.0

TAV-D66-21

12.7

30.5

17.8

2.93

5.1

including

12.7

15.9

3.2

6.84

8.3

including

20.7

29.6

8.9

2.45

5.25

TAV-D68-21

1

3

2

1.07

8.5

12

13.1

1.1

1.82

84.0

TAV-D69-22

41

53

12

1.70

2.9

including

45.7

51

5.3

2.00

2.6

TAV-D69-22

58

59

1

1.25

2.0

60

62.7

2.7

1.36

1.9

TAV-D70-22

48.7

49.9

1.2

1.09

0.3

TAV-D71-22

9.6

13.5

3.9

1.15

1.9

TAV-D72-22

13

17.7

4.7

1.27

1.7

20.3

22.8

2.5

1.36

2.0

27.4

29.5

2.1

1.72

27.5

31.9

33.2

1.3

2.14

5.0

TAV-D75-22

12.3

21.1

8.8

1.38

1.1

TAV-D76-22

3.2

5.2

2

1.09

3.0

TAV-D77-22

20.1

21.3

1.2

1.18

0.3

TAV-D79-22

43.2

53.4

10.2

1.80

16.0

including

43.2

49.4

6.2

3.38

21.0

TAV-D79-22

58

59.1

1.1

1.15

9.0

TAV-D80-22

42

45

3

3.81

4.3

including

42

44

2

5.15

4.5

TAV-D81-22

82.5

86.2

3.7

1.10

6.7

89

90

1

1.10

0.3

92.3

93.5

1.2

1.58

5.0

TAV-D82-22

94

99

5

2.78

4.2

TAV-D83-22

91.2

95.2

4

1.27

15.8

98.2

100.2

2

1.26

40.5

TAV-D86-22

68.7

72.8

4.1

1.43

3.3

TAV-D87-22

68.8

70.5

1.7

1.06

4.6

75

77

2

1.34

4.0

TAV-D88-22

20

22.2

2.2

1.15

2.5

TAV-D89-22

6

7.3

1.3

1.26

5.0

TAV-D90-22

8

10.6

2.6

1.11

4.1

11.4

13.3

1.9

1.70

1.3

15.9

28.8

12.9

1.57

1.9

TAV-D91-22

7.8

9.7

1.9

1.20

0.3

TAV-D92-22

22.9

24.9

2

1.17

5.0

TAV-D93-22

11

12.6

1.6

2.77

6.5

19

20

1

1.04

1.0

21.8

24.3

2.5

1.10

1.1

TAV-D94-22

77.5

78.6

1.1

1.02

13.0

TAV-D96-22

47.9

49.9

2

1.23

3.6

51.5

54.5

3

1.49

3.7

66

67.6

1.6

1.00

2.5

68.6

69.6

1

1.25

3.1

TAV-D97-22

4.5

9.2

4.7

1.71

4.6

 

Sampling and Assaying Procedures

All diamond drill core is currently being processed at the Kiziltepe mine site and analysed at the Kiziltepe Mine Laboratory. Results are assessed systematically and are grouped according to individual mineralised zones at the Tavsan Sector.

 

HQ size drill-core samples from the drilling programme at the Tavsan deposit were cut in half by a diamond saw and sent for analysis in batches in line with the Company's quality control procedures. A total of 3,998 samples (including 632 QA/QC samples) were submitted to the Kiziltepe Mine Laboratory. Core recovery for all drilling conducted at Tavsan during this campaign was 83%, for a total of 2,854 measurements.

 

All samples were assayed for gold using a 30g fire assay. Reviews of the assay results have determined that all Quality Control and Quality Assurance samples (blanks, standards and duplicates) passed the required quality control checks established by the company, with duplicate samples showing excellent correlation. Laboratory sample preparation, assaying procedures and chain of custody are appropriately controlled. The Company maintains an archive of half core samples and a photographic record of all cores for future reference.

 

 

Contacts:

 

Ariana Resources plc

Tel: +44 (0) 20 3476 2080

Michael de Villiers, Chairman

Kerim Sener, Managing Director

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7886 2500

John Prior / Hugh Rich / Atholl Tweedie

Yellow Jersey PR Limited

Tel: +44 (0) 20 3004 9512

Dominic Barretto / Henry Wilkinson

arianaresources@yellowjerseypr.com

 

Editors' Note:

 

The information in this announcement that relates to exploration results is based on information compiled by Dr. Kerim Sener BSc (Hons), MSc, PhD, Managing Director of Ariana Resources plc. Dr. Sener is a Fellow of The Geological Society of London and a Member of The Institute of Materials, Minerals and Mining and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration and to the activity that has been undertaken to qualify as a Competent Person as defined by the 2012 edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and under the AIM Rules - Note for Mining and Oil & Gas Companies. Dr. Sener consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

About Ariana Resources:

Ariana is an AIM-listed mineral exploration and development company with an exceptional track-record of creating value for its shareholders through its interests in active mining projects and investments in exploration companies. Its current interests include gold production in Turkey and copper-gold exploration and development projects in Cyprus and Kosovo. 

 

The Company holds 23.5% interest in Zenit Madencilik San. ve Tic. A.S. a joint venture with Ozaltin Holding A.S. and Proccea Construction Co. in Turkey which contains a depleted total of c. 2.1 million ounces of gold and other metals (as at February 2022). The joint venture comprises the Kiziltepe Mine and the Tavsan and Salinbas projects. 

 

The Kiziltepe Gold-Silver Mine is located in western Turkey and contains a depleted JORC Measured, Indicated and Inferred Resource of 222,000 ounces gold and 3.8 million ounces silver (as at February 2022). The mine has been in profitable production since 2017 and is expected to produce at a rate of c.20,000 ounces of gold per annum to at least the mid-2020s. A Net Smelter Return ("NSR") royalty of 2.5% on production is being paid to Franco-Nevada Corporation.

 

The Tavsan Gold Project is located in western Turkey and contains a JORC Measured, Indicated and Inferred Resource of 253,000 ounces gold and 0.7 million ounces silver (as at June 2020). Following the approval of its Environmental Impact Assessment, resulting permitting work is ongoing to develop Tavsan as the second joint venture gold mining operation in Turkey. A NSR royalty of up to 2% on future production is payable to Sandstorm Gold. 

 

The Salinbas Gold Project is located in north-eastern Turkey and contains a JORC Measured, Indicated and Inferred Resource of 1.5 million ounces of gold (as at July 2020). It is located within the multi-million ounce Artvin Goldfield, which contains the "Hot Gold Corridor" comprising several significant gold-copper projects including the 4 million ounce Hot Maden project, which lies 16km to the south of Salinbas. A NSR royalty of up to 2% on future production is payable to Eldorado Gold Corporation.

 

Ariana owns 100% of Australia-registered Asgard Metals Fund ("Asgard"), as part of the Company's proprietary Project Catalyst Strategy. The Fund is focused on investments in high-value potential, discovery-stage mineral exploration companies located across the Eastern Hemisphere and within easy reach of Ariana's operational hubs in Australia, Turkey and the UK.

 

Ariana owns 75% of UK-registered Western Tethyan Resources Ltd ("WTR"), which operates across south-eastern Europe and is based in Pristina, Republic of Kosovo. The company is targeting its exploration on major copper-gold deposits across the porphyry-epithermal transition. WTR is being funded through a five-year Alliance Agreement with Newmont Corporation (www.newmont.com).

 

Ariana owns 50% of UK-registered Venus Minerals Ltd ("Venus") which is focused on the exploration and development of copper-gold assets in Cyprus which contain a combined JORC Indicated and Inferred Resource of 17Mt @ 0.45% to 1.10% copper (excluding additional gold, silver and zinc), in addition to pursuing a separate 50:50 JV on Hellenic Apliki Mines, which owns the Hellenic SX-EW processing plant and the 11Mt @ 0.25% to 0.69% Cu Apliki mine development project. 

 

Panmure Gordon (UK) Limited is broker to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser and Broker.

 

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

 

Glossary of Technical Terms:

 

"AAS" Atomic Absorption Spectroscopy;

 

"Ag" chemical symbol for silver;

 

"Au" chemical symbol for gold;

 

"g/t" grams per tonne;

 

"JORC" the Joint Ore Reserves Committee;

 

"m" Metres;

 

"oz" Troy ounces;

 

 

Ends.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLGUGDLXSBDGDL
Date   Source Headline
11th Jan 20215:14 pmRNSHolding(s) in Company
30th Dec 202012:29 pmRNSRESULT OF GENERAL MEETING
14th Dec 20207:01 amRNSINVESTOR WEBINAR
14th Dec 20207:00 amRNSPUBLICATION OF CIRCULAR AND GENERAL UPDATE
9th Dec 202012:45 pmRNSDirector/PDMR Shareholding
7th Dec 20208:00 amRNSINCREASE IN JORC RESOURCES AT THE MAGELLAN PROJECT
7th Dec 20207:00 amRNSJOINT VENTURE CONDITIONAL AGREEMENTS COMPLETED
2nd Dec 20207:00 amRNSCONDITIONAL AGREEMENT TO SELL SATELLITE PROJECTS
23rd Nov 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
6th Nov 20207:00 amRNSDirector/PDMR Shareholding
5th Nov 202012:28 pmRNSHolding(s) in Company
30th Oct 202010:49 amRNSUPDATE ON PROPOSED JOINT VENTURE
27th Oct 20209:38 amRNSDirector/PDMR Shareholding
27th Oct 20207:00 amRNSDirector/PDMR Shareholding
20th Oct 20207:00 amRNSARIANA LAUNCHES NOT-FOR-PROFIT INITIATIVE
15th Oct 20207:00 amRNSMAIDEN JORC RESOURCE AT MAGELLAN PROJECT, CYPRUS
12th Oct 20207:00 amRNSQ3 2020 PRELIMINARY PRODUCTION RESULTS
30th Sep 20207:00 amRNSINTERIM RESULTS
29th Sep 20207:00 amRNSUPDATE ON PROPOSED JOINT VENTURE
2nd Sep 20207:00 amRNSNEW HIGH-GRADE VEIN DISCOVERED AT KIZILTEPE
28th Aug 202012:30 pmRNSResult of AGM
27th Aug 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
20th Aug 20207:00 amRNSIssue of Shares
10th Aug 20207:47 amRNSDirector/PDMR Shareholding
6th Aug 20207:00 amRNSDirector/PDMR Shareholding
4th Aug 20208:30 amRNSREVISED AGREEMENT WITH KEFI MINERALS PLC
30th Jul 20207:00 amRNSMAJOR RESOURCE UPDATE: SALINBAS PROJECT
28th Jul 20207:30 amRNSINVESTOR WEBINAR
28th Jul 20207:00 amRNSFINAL RESULTS FOR THE YEAR 31 DECEMBER 2019
9th Jul 20207:00 amRNSQ2 2020 PRELIMINARY PRODUCTION RESULTS
1st Jul 20207:00 amRNSCOMMITMENT BY ÖZALTIN HOLDING A.S.
29th Jun 202012:48 pmRNSFINAL RESULTS AND AUDIT UPDATE
15th Jun 20207:00 amRNSIVRINDI LICENCE AND METALLUGICAL UPDATE
11th Jun 20207:49 amRNS50% INCREASE IN TAVSAN RESOURCE
26th May 20207:00 amRNSKIZILTEPE QUARTERLY OPERATIONAL UPDATE
13th May 20207:00 amRNSCOMPLETION OF INITIAL EARN-IN ON VENUS MINERALS
11th May 20207:00 amRNSKIZILCUKUR JORC RESOURCE UPDATE
7th May 202012:34 pmRNSSHAREPROPHETS SHARES CONFERENCE 2020
1st May 202010:55 amRNS100% REPAYMENT OF CAPITAL LOAN
30th Apr 20201:30 pmRNSEXTENSION AGREEMENT
23rd Apr 20202:05 pmRNSSecond Price Monitoring Extn
23rd Apr 20202:00 pmRNSPrice Monitoring Extension
23rd Apr 20207:00 amRNSSIGNIFICANT RESOURCE UPDATE: KIZILTEPE
15th Apr 20207:00 amRNSQ1 2020 PRELIMINARY PRODUCTION RESULTS
2nd Apr 20207:00 amRNSKEPEZ RESOURCE DEVELOPMENT UPDATE
1st Apr 20207:00 amRNSDUE DILIGENCE UPDATE
26th Mar 20207:00 amRNSMAIDEN DIVIDENDS FROM SUBSIDIARY
24th Mar 20202:05 pmRNSSecond Price Monitoring Extn
24th Mar 20202:00 pmRNSPrice Monitoring Extension
24th Mar 202011:06 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.