Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

Share Price is delayed by 15 minutes
Get Live Data
1.30    -0.025 (-1.89%)
Bid:
1.25
Ask:
1.35
Spread: 0.10 (8.00%)
Market Cap: £17.30m
88E Live PriceLast checked at - London Stock Exchange

Intraday 88 Energy Share Chart

Operations Update

12 Feb 2020 07:06

RNS Number : 7378C
88 Energy Limited
12 February 2020
 

12th February 2020

 

88 Energy Limited

 

Operations Update

 

88 Energy Limited ("88 Energy" or the "Company", ASX:88E, AIM 88E) is pleased to provide the following update related to operations for the upcoming Charlie-1 appraisal well, on the North Slope of Alaska.

 

Highlights

·; Ice road now >80% complete

·; Permit to Drill approved for Charlie-1 appraisal well

·; Spud on track for late February

 

Detail

The ice road to the Charlie-1 location is now >80% complete and expected to be finished in the next two weeks. Ice pad construction is due to commence shortly and mobilisation of the Nordic Rig#3 to site should begin in approximately 10 days. Consequently, spud of Charlie-1 is anticipated in late February.

 

The Permit to Drill was approved on the 11th February and all permits required for drilling of Charlie-1 are now in hand.

 

A presentation detailing the drilling timetable and testing program will be released to the market prior to spud.

 

Managing Director of 88 Energy, Dave Wall, stated: "Excellent progress has been made on the ice road construction, despite extremely cold temperatures. All permits are now in hand ahead of the scheduled spud in late February."

 

Charlie-1 Ice Road Progress Map

A map detailing progress with the Charlie-1 Ice road can be viewed in the pdf version of this announcement, which is available at the link below:

 

http://www.rns-pdf.londonstockexchange.com/rns/7378C_1-2020-2-12.pdf

 

About the Charlie-1 Appraisal Well

The Charlie-1 appraisal well has been designed as a step out appraisal of a well drilled in 1991 by BP Exploration (Alaska) Inc called Malguk-1. Malguk-1 encountered oil shows with elevated resistivity and mud gas readings over multiple horizons during drilling but was not tested due to complications towards the end of operations, which resulted in lack of time before the close of the winter drilling season. It was also drilled using vintage 2D seismic, which was insufficient to adequately determine the extent of any of the prospective targets encountered.

 

88 Energy subsequently undertook revised petrophysical analysis, which identified what is interpreted as bypassed pay in the Malguk-1 well. 88E also completed acquisition of modern 3D seismic in 2018, in order to determine the extent of the discovered oil accumulations. Charlie-1 will intersect seven stacked prospects, four of which are interpreted as oil bearing in Malguk‑1 and are therefore considered appraisal targets. 88 Energy will operate Charlie-1, via its 100% owned subsidiary Accumulate Energy Alaska, Inc, with cost of the well to be funded by Premier Oil Plc up to US$23m under a recent farm-out agreement. Drilling is scheduled to commence in February 2020 with flow testing anticipated to conclude in April 2020. The total Gross Mean Prospective Resource across the seven stacked targets to be intersected by Charlie-1 is 1.6 billion barrels of oil (480 million barrels net to 88E). Refer announcement dated 23rd August.

 

Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons

 

A chart detailing the Charlie-1: Seven Stacked Horizons and further information on the Charlie-1 targets can be viewed in the pdf version of this announcement, which is available at the link above.

 

This announcement has been authorised by the Board.

 

 

Media and Investor Relations:

 

88 Energy Ltd

Dave Wall, Managing Director Tel: +61 8 9485 0990

Email: admin@88energy.com 

 

Finlay Thomson, Investor Relations Tel: +44 7976 248471

 

Hartleys Ltd

Dale Bryan Tel: + 61 8 9268 2829

 

Cenkos Securities Tel: + 44 131 220 6939

Neil McDonald/Derrick Lee

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDDLLBFBLLBBBL
Date   Source Headline
21st Sep 20237:00 amRNSHickory-1 Well Flow Test Planning Update
13th Sep 20239:30 amRNSSmall Holding Share Sale Facility Update
8th Sep 20237:00 amRNSHalf-Year Financial Report
5th Sep 20237:00 amRNSHickory-1 Well Flow Test – Rig Contract Executed
31st Aug 20237:20 amRNSDirector Dealings
30th Aug 202312:07 pmRNSCompletion of Rights Issue Shortfall Placement
29th Aug 20237:01 amRNSProposed placing to raise up to £4.5 million
29th Aug 20237:00 amRNSCompletion of Rights Issue
31st Jul 20237:00 amRNSProject Peregrine Prospective Resources Update
31st Jul 20237:00 amRNSInvestor Presentation
31st Jul 20237:00 amRNSQuarterly Report and Appendix 5B
31st Jul 20237:00 amRNSNon-Renounceable Rights Issue
3rd Jul 20237:00 amRNSAcquisition of Texas Oil and Gas Production Assets
27th Jun 20237:00 amRNSProject Leonis Update
23rd Jun 20237:00 amRNSHickory-1 Flow Testing Program Update
11th May 20237:16 amRNSAGM Presentation
11th May 20237:16 amRNSAGM Results
3rd May 20239:04 amRNSAGM Voting Instructions
2nd May 20239:20 amRNSAGM Voting Status and Letter to Shareholders
26th Apr 20237:00 amRNSQuarterly Report and Appendix 5B
20th Apr 20237:00 amRNSProject Leonis Acreage Awarded
19th Apr 20237:00 amRNSHickory-1 Summary Presentation
11th Apr 20237:00 amRNSHickory-1 Well To Proceed to Flow Testing
6th Apr 20237:34 amRNSNotice of Annual General Meeting
3rd Apr 20237:00 amRNSHickory-1 TD Reached
29th Mar 20237:00 amRNSHickory-1 Operations Update
23rd Mar 20232:43 pmRNSNotice of AGM
23rd Mar 20237:00 amRNSHickory-1 Surface Hole Completed
10th Mar 20237:00 amRNSHickory-1 Well Spudded
8th Mar 20237:00 amRNSASX LODGEMENT OF ANNUAL REPORT
28th Feb 20237:30 amRNSFormation of Unit Approved Over Project Phoenix
27th Feb 20237:00 amRNSHickory-1 Pre-Spud Operations On Track
9th Feb 20231:58 pmRNSIssue of Performance Rights
6th Feb 20237:01 amRNSHickory-1 Operations Update
6th Feb 20237:00 amRNSPlacement to Raise A$17.5M
2nd Feb 20237:00 amRNSCorporate Presentation
2nd Feb 20237:00 amRNSProposed placing to raise up to A$15 million
25th Jan 20237:00 amRNSQuarterly Activities Report and Appendix 5B
24th Jan 20234:35 pmRNSPrice Monitoring Extension
15th Dec 20227:00 amRNSCorporate Presentation
7th Dec 20227:00 amRNSHickory-1 Exploration Well – Rig Contract Executed
28th Nov 202211:00 amRNSPrice Monitoring Extension
14th Nov 202211:05 amRNSSecond Price Monitoring Extn
14th Nov 202211:00 amRNSPrice Monitoring Extension
11th Nov 20227:39 amRNSResult of General Meeting
10th Nov 20227:00 amRNSNorth Slope 2022W Leasing Update
28th Oct 20227:03 amRNSUpdated Corporate Presentation
24th Oct 20228:00 amRNSQuarterly Activities Report and Appendix 5B
10th Oct 20227:00 amRNSNotice of General Meeting
10th Oct 20227:00 amRNSCorporate Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.