RE: Pipeline13 Oct 2019 23:36
What needs to be understood is the perception that a decreasing amount of oil & production at HH is having.
To clarify the current maximum production allowed will be 3500BOPD which divided by the permitted oil tanker size of 220 barrel is 15.9 tankers per day or equal to the 32 maximum in & out permitted per day.
Furthermore this amount of tankers is set to reduce, which is giving posters like Penguins what he would claim is a legitimate argument for well & oil flow depletion & saying that the Kimmeridge is dead & will not be developed which is based on tanker transport figures from the planning documents issued by UKOG.
The key question is are there other plans so to speak in higher & longer production & transportation of that oil, (In the pipeline), (In the train leaving the station), ( In more daily tankers), (In more sites within the HH licences with there own transport incorporated)?