RE: By by 2020 Halo 20211 Jan 2021 09:35
Hi mirasol
Here is a extract from a early November RNS stating the production to September & that it was over 135 days & works out to 208 BOPD when oil was produced.
The HH-1 intervention and other related activities are part of normal oil well optimisation. By their very nature, these operations and the continual need to optimise pump performance, can result in considerable down time i.e. periods of no production as such monthly or annual production figures may not fully reflect the long term flow rates of the well. During 6-month period to the end September 2020, approximately 28,060 bbls of oil were produced over approximately 135 operating days.