Fully funding June/july4 Apr 2022 07:28
85p finished for EMH on the ASX
$644 mil funding in June/July
Annual production of battery grade lithium hydroxide monohydrate modelled to increase from 25,267 tpa to 29,386 tpa, an increase of 16%.
· NPV8 (post tax) increases from US$1.108B to US$1.938B, an increase of 74.9%, based upon a lithiumhydroxide price of USD17,000 per tonne which is significantly less than the current price.
29,000 x $40,000 = 1.16bn per annum for decades
The largest lithium mine in Europe, will be the first in Europe to produce and the 4th largest in the world