RE: EA Responses11 Oct 2021 15:09
The Sidetrack is irrelevant to this EA application in any case. I was just pointing out the CBoy was mistaken as he is on what he believes the application relates
From the Aecom submission to the EA
.2.2 Proposed New Operations
Since 2017, the processing operations at the nearby Theddlethorpe Gas Terminal (TGT) has ceased. Therefore, to ensure the produced natural gas can be exported into NTS, Angus Energy also intend to:
a) install natural gas and condensate processing facilities at SFB Site. This will indicatively include the modification to the existing first stage separator, a set of compressors, a passive dehydration system to remove water, a solid state Joule-Thomson valve allowing for a drop in pressure and temperature to remove heavy hydrocarbons, a condensate stabilisation tower, a new condensate storage unit, produced water storage, a metering and analysis skid, a fuel gas skid, an enclosed ground flare, and some associated pipework manifolding, comms and electrical ancillaries; and
b) install up to 750m of pipeline from the existing TGT entry point to the new NTS connection point which is beyond the scope of this permit variation and
c) Install power generation equipment to support the above facilities.