RE: Greater Sunrise20 Feb 2024 08:13
From that same article 2001 speech- conts
Gusmaoβs inaugural speech also touched on an issue dear to the hearts of Australian diplomats, politicians and public servants β petroleum. The Greater Sunrise LNG field would be developed, but only through the construction of a pipeline to Timor.
Until we see other than the 20+ years of the Island saying its imminent to our shores, backed up by the other parties, nothing has changed, Gusmao/Horta have held development of ALL sectors back, with a laser focus on one thing, as said imminent for 20+ years.
Until it becomes true, said by non TL sources, the doubt remains, should have others moving in by now, still zip, all that departed still seem , sitting on the fence, with 5+ BBO/E just waiting to be drained , kelp, G.S and Chuditch, with little doubt more to be found, on around 15 offshore licenses many of which are well over 3000 sq km, all on trend with many, many massive discoveries, in the Australian and Indonesian sections of the Timor Sea.
Like the demon duo, the other side also seem laser fixed on waiting to either move back in or develop, until that old chestnut of Sunrise is resolved to the point of , production will now flow one way or another, and as said many times
That's all Boil need - a TL permissible production path, or a first ever YES to something else previously denied, like flng and Darwin. π€