Nepal9 Aug 2020 19:53
Last August NEA put this out ( original 2018, but link below was updated November 2019).
https://www.nepalitelecom.com/2018/09/nea-smart-meters-electricity-kathmandu.html
They were starting a project called Kathmandu Valley Smart metering project (KVSM). Under the project, NEA has asked the supplier to install, test, commission and maintain the Advanced Metering Infrastructure (AMI) in Kathmandu Valley. The data is collected to the central server of the system through GSM/GPRS connectivity. The Smart meters have an RF module to send the data to the server at regular intervals. In the case of cellular connectivity, they put a SIM card in the RF module of the meter. Using the 2G or 3G or 4G connectivity, the smart meter sends the usage data to the server periodically.
Beijing Instruments (BI) struck a Strategic Partnership With CC in December 18. The RNS stated that "Beijing Instruments has been a main supplier to the State Grid Corporation of China since 1998 and
has won contracts in Beijing, Henan Province, Hebei Province, Xinjiang Province, Gansu Province and
Hubei Province, as well as overseas contracts in Nepal, Bangladesh, Indonesia and Sri Lanka.
https://cyanconnode.com/wp-content/uploads/2019/02/CyanConnode_BI_Newsletter_Feb19.pdf
Today NEA have announced " NEA Launches Installation Of Smart Meter
https://www.spotlightnepal.com/2020/08/09/nea-launches-installation-smart-meter/
"Currently, there are over 5 million single-phase meter at consumers' homes. In the first phase, NEA will replace about 100,000 meters of single-phase and 3 phases in the houses of Ratna Park and Maharajgunj Distribution Centers."
and "Under its first phase program, NEA has already changed 8222 Time Off Day Meter to smart. Under the second phase, over 125000 meters will be replaced by a smart meter. 18000 have already been installed and the other 60,000 are under the process......Under the Rs. 1 billion concessional loans of the Asian Development Bank, the work is currently undergoing. To replace 400000 old meters by the smart meter in Kathmandu Valley, the tender process has already proceeded."
https://www.spotlightnepal.com/2020/08/09/nea-launches-installation-smart-meter/
So whos begged the Kathmandu Valley tender?
There was no mention of RF smart meters in today's NEA announcement...but confirmation that the Kathmandu Valley pilot ( where RF was used) has turned into a tender for 400,000 meters!