GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.
Utility Uttar Haryana Bijli Vitran Nigam Limited (UHBVNL)
This employee states that he
Smart MeteringSmart Metering
Jul 2018 - May 2022Jul 2018 - May 2022
Associated with Uttar Haryana Bijli Vitaran Nigam Limited
Show project
1) Implementation of one Million smart meters in selected Urban part of Haryana ( India) on GPRS technology.
2)Implementation of two Million smart meters through out Haryana ( India) on Hybrid technology i.e. RF and GPRS.
It looks like to me the hybrid model helped with the first phase of a million meters in Urban Haryana and they have now chosen to go the hybrid route for a further two million meters.
https://www.linkedin.com/in/jasnir-singh-b0887089/?originalSubdomain=in
REC’s ambitious growth roadmap for 2023-24.
According to an interview with REC Ltd CMD Vivek Kumar Dewangan on 22nd September 23.
When asked about of the status of project approvals under RDSS he said
"Most of the states have approved DPRs and invited tenders...( except Karnataka and Telangana)
We hope that by the end of October, 60% of the loss reduction would be awarded. ..
The tendering process for 9 crore meters should be concluded by this October , with the remaining awarded by next March."
Confirmation that the next six months and onwards will be eventful, and as we wait for the sub contractors to be announced after each individual tender award - its good to know we start this process this month with around 90 million smart meters being up for grabs by end of this month, and this number building to 250 m smart meters to be awarded over next six months - an average of 30 million new meters each month from November 23.
Assuming that CC win their portion of these tenders its all about how the tenders / numbers fall for CC now, and at which end of the six month plus window they fall .....
The thing that stood out for me in the CMD of RECs interview above was his mention of "We hope that by the end of October, 60% of the loss reduction would be awarded", as we know the first phase / target of the smart meter rollout for RDSS is to bring down the energy losses /waste/ theft etc in specific areas and many of these areas are where CC already have a foot hold - so with luck these "problem / difficult" areas that CC are know to operate could be awarded earlier rather than later. Maybe wishful thinking. GL Vas
Tony , IF CC managed to get Bihar out of a situation where GPRS alone could not complete the SLA then form the numbers provided , and if Bihar stick with a hybrid solution ( considering that they concentrated on urban areas initially) then the future in Bihar looks very promising IMO. for Cyan.
Recent account of the initial rollout that hopefully CC helped rectify - September 23
"With installation of more than 12.50 lakh Smart Pre-paid Meters in urban areas which constitutes more than 50% of the total consumers of urban areas, there has been significant improvement in quality of meter reading and billing resulting in increased collection and a significant reduction in AT&C losses also. Now DISCOMs are facing practically no issues related to revenue matters wherever these meters has been installed along with no expenditure on meter reading billing and its collection. "
On the basis of this success,
The report states
"After successful implementation of Smart Prepaid metering in urban areas of Bihar, a decision was taken during 2021-22 for extending the implementation of smart prepaid metering covering entire rural areas of Bihar having 1.48 Crore Rural Consumers in Phases under HYBRID Model "
Just as an aside , this report from June 23.
"Currently, two softwares are used to take care of smart prepaid meter billing activities ( in Bihar).
The first one is managed by Energy Efficiency Services Limited and the second one by NIC.
Due to these two software, SBPCL and NBPDCL are facing problems in their operations (as they are not interoperable).
To counter this problem, the selected agency will develop one software as well as manage it.
https://www.muzcorner.in/2023/06/bihar-hiring-agency-solve-smart-meter-billing-problems.html
Sorry Tony.
I forgot to add that Accenture was used as software developer for development of prepaid functionality feature in the smart metering in Bihar, along with EESL (AMISP) and EDF as System Integrator. The report states
"Considering the challenges faced during the initial stage of development it was decided to form a joint team consisting of IT Professionals of Distribution Companies overseeing/ monitoring the IT work of SAP Billing in urban areas and NIC billing in Rural Areas with AMISP and its IT Team of Accenture."
And the report i referred to in my previous link was Indo – German Energy Program Energy Transition with Discoms Roadmap for Smart Meter Interoperability in India November 2022"
The Consulting Partners for this report was also Accenture Solutions Private Ltd.
Hi tony,
I am no expert either - so struggle with terminology and meaning sometimes.
If you read this note below. "Roadmap for Smart Meter Interoperability in India" November 2022
It came out just after the Genus award to CC and uses Bihar a a case study.
If you look at Bihar case study , the second utility Uttar Haryana Bijli Vitran Nigam Limited (UHBVNL)
They give their observations such ast he original tender states "The smart meter must have a GPRS communication
module which shall be of pluggable-type and shall be capable of servicing technologies such as 2G, 3G and
4G • Communication infrastructure: o The communication infrastructure should be based on GPRS technology. The GPRS communication network shall be capable of servicing 3G technology compliant with IPv6.
Then the report states
"The utility is in the planning stage for deploying additional
20 lakh meters for which hybrid communication technology
will be considered (cellular + RF Mesh), as opposed to the
current cellular technology (3G)."
It sounds like there was a problem with using just GPRS technology as requested in Tender, and they opted for a hybrid solution of GPRS and RF.
I also could be wrong but interesting. GL Tony and sorry its so long winded.
https://www.energyforum.in/fileadmin/user_upload/india/media_elements/publications/20230413_DISCOM_REPORTS/GIZ-Accenture_Smart_Meter_Interoperability.pdf
Well worth a read.
https://bestpractices.pppinindia.in/best-practice-detail/smart-metering-with-prepaid-functionality-%E2%80%93-challenges-and-success-story-of-bihar
Ajay (Ajoy) Rajani has taken on the role of Executive Vice Chairman of CyanConnode India and Business Development Americas.
"Ajoy joined CyanConnode in December 2020, bringing with him extensive experience from the Indian power, telecom, and IT sectors. He has previously held senior roles at Reliance Communications and Reliance Energy Mumbai. In his new role, Ajoy will focus on enhancing our Sales & Business Development initiatives in #India and exploring opportunities in the American #smartmetering markets."
https://www.linkedin.com/feed/update/urn:li:activity:7113118492140183553/
This one is more user friendly for some reason. A new company!
https://www.falconebiz.com/company/SOUTHERN-ELECTRIC-METERING-PRIVATE-LIMITED-U35109MH2023PTC403789
Forgot the link with me prattling on.
https://www.linkedin.com/in/avinash-chauhan-1707156b/?originalSubdomain=in
Evening LT.
Thanks for the REC updates.
This gent according to his Linkedin page is still employed by SAI in Uttar Pradesh, but is strangely also listed as Site Manager at CyanConnode !
If you look at other similar positions in CC or any company's they all usually state the employee's most recent post at the top of their work history.
it does not appear to be the case here and just seems odd.
Maybe it just needs to be updated, but in the past i have often had the feeling that CC either on board staff early from company's they later become involved with or alternatively staff from CC leave to work in a company which turn out later to be significant. In a way this makes total sense in sharing information and skills with any potential partner. Only a feeling so could be just wishful thinking.
If Sai where anticipating using CCs RF solution in any bids, then they would have some of their staff all over the technology long before they where to make the commitment. GL Vas
Someone said a while ago on this BB this share was good for traders, and here we are again at around 11.5p, just like a few months ago, and several times last year. The good news in the past is what happens to the sp shortly after this particular low is hit. fingers crossed. GL
on directors talk web site regarding smart meter technology in uk homes !
"top 5 ways smart meters improve your home’s energy preservation"
https://*************.net/top-5-ways-smart-meters-improve-your-home%e2%80%99s-energy-preservation
CyanConnodes involvement in EV was touched upon a few weeks ago.
An interesting message from a Genus representative today ( MD & CEO Transforming the Energy Industry with Smart Solutions) talking the EV market in India, and beyond has real growth. Governments all around the world actively invest in EV technology for cleaner energy, lower emissions, energy self-sufficiency, and environmental sustainability.
https://www.linkedin.com/feed/update/urn:li:activity:7112682891507040257/?origin=SHARED_BY_YOUR_NETWORK
After being ranked as the cleanest city five times, Indore has bagged the top spot for the ‘Best Smart City’ in India at the National Smart Cities Conclave 2023 held in the city
https://www.moneycontrol.com/news/business/real-estate/indore-bags-best-smart-city-spot-at-national-smart-cities-conclave-2023-11441001.html
Thanks for pointing us in the right direction LT.
Here is the original NCC regulatory press release.
Thanks' Vas
https://www.bseindia.com/xml-data/corpfiling/AttachHis/8db29c8f-a032-4e42-a9f1-5cc5afc4d3c0.pdf
Today, 26th September 2023 is the last bid submission date for an amazing number of state tenders.
Rajasthan has nine tenders closing . approx. total Meter Qty total 125 Lakh ( 12.5 million)
Goa 7.5 Lakh ( 750,000 meters)
Tamil Nadu 300 Lakh ( 30 million meters)
Tenders for approx. forty million smart meters closing today !
https://www.intellismartinfra.in/smart-meter-tenders.html
Assam govt gives nod to Rs 5,197-cr project for power sector modernisation
https://www.projectstoday.com/News/Assam-govt-gives-nod-to-Rs-5197-cr-project-for-power-sector-modernisation