Roundtable Discussion; The Future of Mineral Sands. Watch the video here.
Personally feel that the CEO is using BMN as his personal cash cow.
As regards to the deliveries etc this will all level out for the year in line with the guidance which has been lowered due to the load shedding etc
So far most people have been wrong o this BB as regards to what or how much the company has earned or their cash position.
Just my view
The company's sp is at rock bottom because of the BOD and not any of the contributors here. Maybe you should be emailing them and calling them bottom holes as well.
Lindon see below. I am sure I can find other stuff in the old rns...the bs the fortune and Mikhail both sold us.
Bushveld Energy Q1 Operational Update
Wed, 11th Apr 2018 08:30
RNS Number : 5418K
Bushveld Minerals Limited
11 April 2018
Eskom VRFB project
· Completed manufacturing of the Direct Current ("DC") portion of the VRFB, with factory acceptance expected in April 2018 and delivery of the entire system still on track in the second quarter of this year;
· Commenced site preparation work at the Eskom site, including earthworks and cabling;
· Appointed two technicians from South Africa to perform installation and maintenance on the Eskom project. Technicians will be training at UniEnergy Technologies, a US-based leading VRFB manufacturer, in April. This will give Bushveld Energy the capability to install and maintain future VRFB installations in South Africa and regionally.
Just wish the MIA Mikhail had been able to sell something in the last 5 years
https://cleantechnica.com/2022/11/25/vanadium-flow-batteries-could-leapfrog-over-pumped-hydro-for-long-duration-energy-storage/
I hope this does not go down the same path as BMN