RE: Low salinity - Back to exploring25 Feb 2026 10:45
stamford, you talk *******s. what's your problem? the rns has to be bang on so as not to misled investors and it stated;
successful completion of electrical submersible pump ("esp") testing at itw-1 at the southern rukwa helium project with zero lost time injuries
· produced over the equivalent of 250,000 barrels ("bbl") of water over a testing period of 20 days, with flow rates of up to an equivalent of 16,400 barrels per day ("bpd") - a six-fold increase in flow rate, compared with natural flow during the 2024 extended well test ("ewt")
· sustained helium concentrations of 5.4% (air corrected) with a maximum concentration of 9.2% (air corrected) at surface
· sustained average measured gas water ratio ("gwr") readings of 0.06 m3/m3 (0.05 sm3/sm3 corrected for stp1) with a peak of 0.1 m3/m3 (0.08 sm3/sm3 corrected for stp1) during the continuous flow period
· downhole temperature measurements and salinities suggest mixing from both basement sourced fluids and a karoo group aquifer
· upon shut in, the wellhead pressure and downhole pressure quickly re-pressurised indicating encouraging reservoir support
· strategic farmout process to commence to identify and select a suitable industry partner