North basin22 Jun 2024 20:56
23 wells
Phased drilling
18 wells in phase 1 with 11 of them pre first oil
Five additional wells in phase 2, approximately 42 months post first oil
Total barrels developed: 269 million
Plateau production rate: 80,000 bbls/d
Peak rate: 100,000 bbls/d
Total capex: US$2.2bn
Phase 1 capex: US$1.8bn
Pre first oil capex: US$1.3bn
So if 11 well pre first oil the rig must be warmed up soon , as wasn’t first oil in 2026 for navitas ? Hopefully we can get going in the same way