RE: Flaming June29 May 2018 16:26
We should get more drill results from Rainbow in the first half of June.
Firstly, the results should include more detail on the find at Kiyenzi, including grades and intervals on the breccia material. However, we won't get tonnages yet, which is a pity, as by my very rough estimate the Kiyenzi find may represent an increase of several years in the life of the mine.
Secondly, we should get the results of the drilling of the supposed carbonatite pipes. The rare earth grades in the pipes probably won't be anything like the narrow vein material, but the pipes (if confirmed) are massive (the largest has a diameter of 2700m). Hopefully, the company will also give an indication of how it intends to extract the rare earths from the pipes.
As regards actual ongoing production, I don't think we'll get an update until the quarterly report in July. But I assume that Rainbow are still fighting through all the teething operational problems and gradually ramping up production.